LUCARA ANNOUNCES OPERATING GUIDANCE FOR 2023

VANCOUVER, November 28, 2022 /CNW/ (LUC – TSX, LUC – BSE, LUC – Nasdaq Stockholm)

Lucara Diamond Corp. (“Lucara” or the “Company”) is pleased to provide operating guidance for 2023 (all amounts

in USD unless otherwise stated).

2023 OUTLOOK

This section provides management's production and cost estimates for 202 3. These are “forward -looking

statements” and subject to the cautionary note regarding the risks associated with forward -looking statements.

Karowe Mine (all amounts in US Dollars) Full Year 2023

Diamond revenue $200 million to $230 million

Diamond sales 385,000 carats to 415,000 carats

Diamonds recovered 395,000 carats to 425,000 carats

Tonnes mined – Ore 1.9 million to 2.3 million

Tonnes mined – Waste 2.2 million to 2.8 million

Tonnes processed – Ore 2.6 million to 2.9 million

Total operating cash costs per tonne processed (including (a) to (b) below): $32.50 to $35.50

(a) Cash cost per tonne mined (ore and waste) $7.00 to $8.00

(b) Cash cost per tonne processed $12.00 to $13.00

Botswana G&A expenses, including sales and marketing, per tonne processed $3.50 to $4.50

Tax rate 0%

Average exchange rate – Botswana Pula per United States Dollar 12.0

REVENUE AND SALES CHANNELS

In 2023, the Company’s revenue forecast assumes that 52% of the carats recovered will come from the higher value

M/PK(S) and EM/PK(S) units within the South Lobe and the remaining 48% of the carats recovered will come from

the Centre Lobe in accordance with the mine plan, generating revenue between $ 200 and $230 million in 2022.

Centre Lobe material, while higher grade, has a lower weight percentage of stones greater than 10.8 carats in size

when compared to South Lobe material.

With the recently announced extension of the HB agreement, the Company will continue to use three different sales

channels to maximize revenue and generate consistent cash flow to support the Company’s operations and its

investment in the underground expansion project. Higher value stones greater than +10.8 carats in size will continue

to enter the manufacturing pipeline at HB, giving the Company exposure to polished prices and regular cash flow

from the highest value portion of the Karowe production. Quarterly tenders and regular sales through Clara,

primarily for stones less than 10.8 carats in size will continue, consistent with the practise from previous years.

2

MINING AND PROCESSING ASSUMPTIONS

In 2023, the Company expects to mine between 4. 1 and 5.1 million tonnes, of which ore tonnes mined represent

approximately half of total tonnes mined. The assumptions for carats recovered and sold as well as the number of

tonnes processed are consistent with achieved performance in recent years. Material from the open pit is planned

to be processed between 2023 to 202 6 when the mine transitions to underground. O re from the underground

development is expected to supplement lower grade stockpile material during the transition to underground at the

end of the open pit mine life.

UNDERGROUND AND SUSTAINING CAPITAL EXPENDITURES

In 2023, capital costs for the underground expansion are expected to be up to $1 05 million and will focus

predominantly on shaft sinking activities, along with construction of the bulk air cooler, tendering the underground

development contract and underground equipment purchases . Ramp-up to planned sinking rates for both the

ventilation and production shaft continues. A complete review of the current program schedule and budget is

underway and will be completed in Q1 2023.

Sustaining capital and project expenditures related to the open pit mining operations are expected to be up to $20

million with a focus on replacement and refurbishment of key asset components in addition to dewatering activities,

an expansion of the tailings storage facility in accordance with Global Industry Standard on Tailings Management

and completion of a community sports facility.

BOTSWANA TAX RATE

Lucara Botswana’s progressive tax rate computation allows for the immediate deduction of operating costs,

including capital expenditures, in the year in which they are incurred. Based on 202 3 revenue guidance of $ 200

million to $2 30 million and assuming th e underground development expenditures of $1 05 million, the tax rate is

expected to be 0% for 2023.

CLARA SALES PLATFORM

Clara, Lucara’s 100% owned proprietary, secure, web -based digital sales platform, continues to grow in terms

of volume transacted and customer participation. Platform trials and discussions with third party suppliers of rough

diamonds are ongoing to build supply, which remains a key objective for 2023 and beyond. The rationale for a web

based digital sales platform for the transaction of rough diamonds has never been stronger, sparked by industry’s

need for increased transparency, global restrictions on travel, and a new openness to the use of innovation and

technology to create a more efficient supply chain.

On behalf of the Board,

Eira Thomas

President and Chief Executive Officer

Follow Lucara Diamond on Facebook, Twitter, Instagram, and LinkedIn

3

For further information, please contact:

Canada Hannah Reynish, Investor Relations & Communications

+1 604 674 0272| [email protected]

Sweden Robert Eriksson, Investor Relations & Public Relations

+46 701 112615 | [email protected]

UK Public Relations Charles Vivian / Jos Simson, Tavistock

+44 778 855 4035 | [email protected]

ABOUT LUCARA

Lucara is a leading independent producer of large exceptional quality Type IIa diamonds from its 100% owned

Karowe Diamond Mine in Botswana. The Karowe Mine has been in production since 2012 and is the focus of the

Company’s operations and development activities. Clara Diamond Solutions Limited Partnership (“Clara”), a wholly-

owned subsidiary of Lucara, has developed a secure, digital sales platform that uses proprietary analytics together

with cloud and blockchain technologies to modernize the existing diamond supply chain, driving efficiencies,

unlocking value and ensuring diamond provenance from mine to finger. Lucara has an experienced board and

management team with extensive diamond development and operations expertise. Lucara and its subsidiaries

operate transparently and in accordance with international best practices in the areas of sustainability, health and

safety, environment, and community relations. Lucara has adopted the IFC Performance Standards and the World

Bank Group’s Environmental, Health and Safety Guidelines for Mining (2007). Accordingly, the development of the

Karowe underground expansion project (“UGP”) adheres to the Equator Principles. Lucara is committed to upholding

high standards while striving to deliver long-term economic benefits to Botswana and the communities in which the

Company operates.

The information is information that Lucara is obliged to make public pursuant to the EU Market Abuse Regulation

and the Swedish Securities Markets Act. This information was submitted for publication, through the agency of the

contact person set out above, on November 28, 2022 at 2:00pm Pacific Time.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS

Certain of the statements made and contained herein and elsewhere constitute forward -looking statements as

defined in applicable securities laws. Generally, these forward -looking statements can be identified by the use of

forward-looking terminology such a s "expects", "anticipates", "believes", "intends", "estimates", "potential",

"possible" and similar expressions, or statements that events, conditions or results "will", "may", "could" or "should"

occur or be achieved.

Forward-looking statements are based on the opinions and estimates of management as of the date such statements

are made, and they are subject to a number of known and unknown risks, uncertainties and other factors which may

cause the actual results, performance or achievements of the Company to be materially different from any future

results, performance or achievement expressed or implied by such forward -looking statements. The Company

believes that expectations reflected in this forward -looking information are reasonable, but no assurance c an be

given that these expectations will prove to be accurate and such forward-looking information included herein should

not be unduly relied upon.

In particular, forward-looking information and forward-looking statements in this news release may include, but are

not limited to, the estimates of the Company’s mineral reserves and resources; estimates of the Company’s

production and sales volumes for the Karowe Diamond Mine; estimated costs for capital expenditures related to the

Karowe Diamond Mine; production costs; development expenditures and reclamation costs; expectation of diamond

prices; the benefits to the Company of diamond supply agreements with HB and the ability to generate better prices

from the sale of the Company’s +10.8 carat production as a polished stone and to provide more regular cash flow

than in previous periods; estimates of top-ups pursuant to the HB supply agreement; assumptions related to foreign

4

currency exchange rates and tax rates ; assumptions and expectations related to the ongoing development of an

underground mining operation at Karowe including associated capital costs and timing; information or statements

with respect to the equity and project debt financings, the intended use of proceeds, the Company’s ability to comply

with the terms of the Facilities which are required to construct the Karowe UGP, that expected cash flow from

operations, combined with external financing will be sufficient to complete construction of the Karowe UGP, that

the estimated timelines to achieve mine ramp up and full production from the Karowe UGP can be achieved; the

impact of COVID-19 pandemic on the Company’s operations and cash flows and its plans with respect to the Karowe

underground expansion project; the scaling of the digital platform for the sale of rough diamonds owned by Clara ;

expectations regarding the need to raise capital and its availability; possible impacts of disputes or litigation; and

other risks and uncertainties described under the heading “Risks and Uncertainties” in the Company’s most recent

Annual Information Form available at http://www.sedar.com (the “AIF”).

There can be no assurance that such forward looking statements will prove to be accurate, as the Company's results

and future events could differ materially from those anticipated in this forward -looking information as a result of

those factors discussed in or referred to under the heading “COVID -19 Global Pandemic” in the Company’s most

recent MD&A and under the heading "Risks and Uncertainties" in the Company's most recent Annual Information

Form, both available at http://www.sedar.com, as well as changes in general business and economic conditions, the

ability to continue as a going concern, changes in interest and foreign currency rates, changes in inflation, the supply

and demand for, deliveries of and the level and volatility of pr ices of rough diamonds, costs of power and diesel,

impacts of potential disruptions to supply chains, acts of foreign governments and the outcome of legal proceedings,

inaccurate geological and recoverability assumptions (including with respect to the size , grade and recoverability of

mineral reserves and resources), and unanticipated operational difficulties (including failure of plant, equipment or

processes to operate in accordance with specifications or expectations, cost escalations, unavailability of materials

and equipment, government action or delays in the receipt of government approvals, industrial disturbances or

other job actions, adverse weather conditions, and unanticipated events relating to health safety and environmental

matters).

Accordingly, readers are cautioned not to place undue reliance on these forward- looking statements which speak

only as of the date the statements were made, and the Company does not assume any obligations to update or

revise them to reflect new events or circumstances, except as required by law.