Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LTNG.V ·

BeMetals Extends High‐Grade Zone with New Drilling Results at the Kato Gold Project in Japan

Drill Results

TSXV – BMET  

July 26, 2022                                                                                                                   OTCQB – BMTLF 

                               FRANKFURT – 1OI.F 

BeMetals Extends High‐Grade Zone with New Drilling Results at the  

Kato Gold Project in Japan 

Vancouver, British Columbia – BeMetals Corp. (TSXV: BMET, OTCQB: BMTLF, Frankfurt: 1OI.F) (the “Company” or 

“BeMetals”) is pleased to announce its first assay results for its ongoing diamond drilling program at the Kato Gold 

Project  (“Kato”  or  the  “Property”)  in  Hokkaido,  Japan.  BeMetals  plans  to  complete  at  least  1,250  metres  of 

additional drilling during this initial campaign and will release their assay results in the coming months.  

HIGHLIGHTS OF KT22‐11 CORE DRILL HOLE: 

    KT22‐11: 11.50 metres (“m”) grading 6.42 grams per tonne (“g/t”) gold (“Au”) 

o  Including: 8.70 m grading 7.80 g/t Au 

o Including: 4.52 m grading 11.88 g/t Au 

 This new hole extends the targeted high‐grade vein zone by some 60 metres along strike  

 Additional drill hole assay results are expected to be released in the coming months    

Note:  Intertek  Testing  Services  completed  the  analytical  work  with  the  core  samples  processed  at  their  accredited  laboratory  in  Manila, 

Philippines (See details in QA/QA section below). Reported widths are drilled core lengths as true widths are unknown at this time. Based upon 

current data it is estimated true widths range between 55 to 65% of the drilled intersections. 

John Wilton, President and CEO of BeMetals stated, “We are pleased with these initial drill hole assay results from 

our Kato Gold Project on Hokkaido in Japan. The results from hole KT22‐11 represents an approximate 60 metre 

extension to the strike length of the historically drilled high‐grade vein zone which was last drilled in the early 1990s 

by MMAJ, the Japanese state agency. At this point, we believe there is good evidence that this intersection pierced 

the interpreted upper area of this vein zone and our second hole which is currently being drilled, is aiming to test a 

further strike extension of this high‐grade vein zone and test other vein targets."  

During a recent inspection of available drill core at the Kato Project, including hole KT22‐11, Dr. Richard Sillitoe, a 

world‐renowned economic geologist, also an expert on this style of epithermal gold deposits, concluded, “Near‐

paleosurface  and  textural  features  would  suggest  that  much  of  the  historical  drilling  intersected  the  relatively 

shallow parts of the gold system and, based on similar epithermal deposits globally, downward vein extensions and 

grade continuity seem likely.” 

Wilton continued, “Given these new high‐grade gold drilling results, integrated with the historical drilling data, and 

the  evolving  geological  understanding  of  the  property,  we  are  increasingly  excited  by  the  potential  to  build  a 

significant gold resource at the Kato Project.”  

2

KATO GOLD PROJECT 2022 DRILLING PROGRAM 

This year BeMetals plans to complete an approximate 1,500 m drill program at the Kato Gold Project.  Recently, the 

Company added another drill crew and helpers to the site in order to increase the team’s drilling capacity. These 

added personnel are expected to continue to improve drilling progress and provide constant geological exploration 

data and assay results. Hole KT22‐12 is currently underway and is targeting additional strike extension of the high‐

grade vein zone drilled in hole KT22‐11, and to test other vein targets.  

Figure  1  illustrates  the  location  of  KT22‐11  on  a  cross  section  in  relation  to  the  current  simplified  geological 

interpretation of this area at the Kato Project. Details of the geological model are evolving with ongoing drilling 

information  compilation,  including  careful  observations  of  textures  intimately  associated  with  the  gold 

mineralization. These observations indicate that historical drilling has generally intercepted the epithermal system 

at shallow positions, hence significant potential exists to extend the high‐grade vein targets in depth. Additionally 

it appears that the wide but lower grade zones of gold mineralization intersected in some of the previous drilling 

could be due to overprinting by the upper, steam heated zone of the gold system (See Figure 1).  

Due to this improving understanding of the Kato geology, and gold mineralization there is also increased potential 

to also extend the high‐grade veins a significant distance along strike. 

Figure 1: Cross Section of Hole KT22‐11 at Kato Gold Project 

Note: Drill results KT18‐01, KT18‐02, KT19‐07 and KT19‐02A are historical in nature and have been previously released in BMET news release dated July 28, 

2021, and reported in the Company’s technical report entitled, “Kato Gold Project Japan NI 43‐101 Technical Report” with an effective date of July 13, 2021.   

Table 1 below lists the gold intersections in hole KT22‐11 which includes the high‐grade vein intersections and 

surrounding interpreted mineralized stockwork zones. Table 2 shows the details of KT22‐11 with the hole; 

azimuth, dip, end of hole depth and collar coordinates. 

3

Table 1: Drill Hole Intersection Results Hole KT22‐11 

Drill hole  From 

(m) 

To 

(m) 

Core Interval 

(m) 

Au        

g/t 

Comments 

KT22‐11         

Interval 1:  226.00  236.80  10.80     0.43  Stockwork Zone 

Interval 2:  236.80  248.30  11.50  6.42  Vein Zone 

Including:  239.60  248.30      8.70*  7.80   

     Including:  239.60  244.12   4.52  11.88   

Interval 3:  248.30  253.20   4.90  0.76  Stockwork Zone(1) 

Table 1 Notes: Intertek Testing Services completed the analytical work with the core samples processed at their accredited laboratory in Manila, Philippines 

(See details in QA/QA section below). Reported widths are drilled core lengths as true widths are unknown at this time. Based upon current data it is estimated 

true widths range between 55 to 65% of the drilled intersections. For the Stockwork Zone a nominal cut‐off grade of 0.30 g/t Au has been used to determine 

the boundaries of the intersections with no more than 1.20 metres of internal dilution of the intercept. For the Vein Zone a nominal cut‐off grade of 1 g/t Au 

has been used to determine the boundaries of the intersections with no internal dilution of the intercept.  *A nominal cut‐off grade of 3 g/t has been used to 

determine the boundaries of this intersection with no more than 2.08 metres of internal dilution. (1) Current interpretation  

Figure  2  is  a  simplified  geological  map  illustrating  the  location  of  Hole  KT22‐11  and  its  reported  drilled  gold 

intersections. It shows the approximate 60m extension of the high‐grade gold vein and the position of drill hole 

KT22‐12, which is currently in progress with its planned drill hole trace. The KT22‐12 drill hole is designed to test 

two vein targets. Based upon current interpretation, the immediate target zones for further high‐grade gold veins 

are indicated. It also shows the exploration potential with existing targets, to test the Kato gold system at significant 

distances to the southeast. 

Figure 2: Location Map of Hole KT22‐11 at Kato Gold Project   

4

The  Kato  Project  is  located  within  a  sparsely  populated  area  of  Hokkaido  yet  it  is  still  in  close  proximity  to 

infrastructure such as sealed roads and power lines, and has access to supplies and services at the nearby town of 

Kamishihoro. 

Table 2: Core Hole ID, Azimuth, Dip, End of Hole Depth and Collar Coordinates 

Drill Hole 

ID 

Azimuth 

Degree 

Dip 

Degree 

End of hole Depth 

(m) 

Easting 

(m) 

Northing   

(m) 

Elevation 

(m) 

KT22‐11  015 ‐ 53  253.20  683424  4796856  497 

THE KATO GOLD PROJECT   

The Kato Gold Project is BeMetals’ most advanced, of five exploration projects in Japan based on the amount of 

available historical drilling information, and the Property covers close to 2,000 hectares in central Hokkaido (See 

Figure 3). The Kato Project (historically referred to as the Seta River Prospect) is an example of a remarkably well‐

preserved epithermal gold system.   Outcropping of clay‐altered units are evidence of a high‐temperature steam‐

heated  zone  above  a  hydrothermal  gold  plumbing  system.  This  mineralization  style  is  an  example  of  a  low‐

sulphidation epithermal system and the classic analogy for this mineralization type in Japan is the Hishikari Gold 

Mine, on Kyushu Island.   Global examples of this type of mineralization include mines such as Lihir (Papua New 

Guinea), Kupol and Julietta (Russia), Waihi (New Zealand) and Masbate (Philippines).*  

The Property was previously drilled by the Japanese state agency MMAJ in the 1990s and during that time results 

included high‐grade intervals of gold such as 17.5 metres grading 8.15 g/t Au in hole 5MAHB‐2 and 18.65 metres 

grading 5.01 g/t Au in hole 7MAHB‐1.*  

From  2018‐2020,  Kazan  Resources  (“Kazan”),  acquired  by  BeMetals  in  2021,  drilled  several  holes  at  Kato  that 

intersected a zone of hydrothermal breccia near the adjacent main alteration target vein. Their results included 

hole KT19‐02A which returned a number of zones of gold mineralization such as 14 metres grading 2.10 g/t Au.*  In 

2020,  drilling  intersected  over  50  metres  of  clay  alteration,  hydrothermal  breccia,  vein  breccia,  stockwork,  and 

banded quartz‐adularia  low sulphidation epithermal veins in hole KT20‐010.   That  hole intersected 58.9 metres 

grading 0.76 g/t Au, including 7.4 metres at 2.99 g/t Au, and ended in 2.8 metres grading 3.1 g/t Au.* Due to a lack 

of inserted bore hole casing the hole was lost in a mineralized zone and is thought to have not intersected the high‐

grade vein target.   

*Please refer to technical report entitled, “Kato Gold Project Japan NI 43‐101 Technical Report” with an effective date of July 13, 2021. 

5

Figure 3. Location of BeMetals Gold Projects in Hokkaido, Japan 

QUALITY ASSURANCE AND QUALITY CONTROL 

The  new  results  reported  here  for  this  core  drilling  program  were  analyzed  by  Intertek  Testing  Services,  an 

independent  and  accredited  laboratory.  Samples  were  prepared  and  analytical  work  conducted  in  Manila, 

Philippines. The results were obtained using the following analytical methods as appropriate to determine the gold 

grades; FA50N/AA of 50g fire assay, with Atomic Absorption Spectrometry (“AAS”) finish and FA50GR/GR of 50g 

fire assay with Gravimetric finish for over limit samples exceeding 10 g/t Au. The core sampling was conducted with 

a robust sampling protocol that included the appropriate insertion of standard reference material, duplicates, and 

blanks into the sample stream. 

Field operations and management have been conducted by BeMetals’ personnel. The core drilling was conducted 

by Energold Drilling. 

ABOUT BEMETALS CORP. 

BeMetals is a precious and base metals exploration and development company focused on becoming a leading 

metal producer through the acquisition of quality exploration, development and potentially production stage 

projects. The Company has established itself in the gold sector with the acquisition of a portfolio of wholly owned 

exploration projects in Japan. BeMetals is also progressing both its tier‐one targeted, Pangeni Copper Exploration 

Project in the prolific Zambian Copperbelt, and advancing its high‐grade, zinc‐silver‐gold‐copper exploration at the 

South Mountain Project in Idaho.  Guiding and leading BeMetals’ growth strategy is a strong board and 

management team, founders and significant shareholders of the Company, who have an extensive proven record 

of delivering exceptional value in the mining sector, over many decades, through the discovery, construction and 

operation of mines around the world. 

6

QUALIFIED PERSON STATEMENT 

The technical information in this news release for BeMetals has been reviewed and approved by John Wilton, CGeol 

FGS, CEO and President of BeMetals, and a “Qualified Person” as defined under National Instrument 43‐101. 

ON BEHALF OF BEMETALS CORP. 

“John Wilton” 

John Wilton 

President, CEO and Director 

For further information about BeMetals please visit our website at bemetalscorp.com and sign‐up to our email list 

to receive timely updates, or contact: 

Derek Iwanaka 

Vice President, Investor Relations & Corporate Development 

Telephone: 604‐928‐2797 

Email:   [email protected]    

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the 

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release 

Cautionary Note Regarding Forward‐Looking Statements 

This news release contains "forward‐looking statements" and “forward looking information” (as defined under applicable securities laws), based on 

management’s best estimates, assumptions  and current expectations. Such statements include but are not limited to, statements with respect to 

future exploration, development and advancement of the South Mountain Project, the Pangeni project and the Japan properties, and the acquisition 

of  additional  base  and/or  precious  metal  projects.   Generally,  these  forward‐looking  statements  can  be  identified  by  the  use  of  forward‐looking 

terminology such as "expects", "expected", "budgeted", "forecasts", "anticipates", "plans", "anticipates", "believes", "intends", "estimates", "projects", 

"aims", "potential", "goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or 

"should" occur.  These statements should not be read as guarantees of future performance or results.  Such statements involve known and unknown 

risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from those expressed or 

implied by such statements, including but not limited to: the actual results of exploration activities, the availability of financing and/or cash flow to 

fund  the  current  and  future  plans  and  expenditures,  the  ability  of  the  Company  to  satisfy  the  conditions  of  the  option  agreements  for  the  South 

Mountain Project and/or the Pangeni Project, and changes in the world commodity markets or equity markets. Although the Company has attempted 

to identify important factors that could cause actual results to differ materially from those contained in forward‐looking statements, there may be 

other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be 

accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward‐looking statements and 

forward looking information are made as of the date hereof and are qualified in their entirety by this cautionary statement.  The Company disclaims 

any obligation to revise or update any such factors or to publicly announce the result of any revisions to any forward‐looking statements or forward 

looking information contained herein to reflect future results, events or developments, except as require by law. Accordingly, readers should not place 

undue reliance on forward‐looking statements and information. Please refer to the Company’s most recent filings under its profile at www.sedar.com 

for further information respecting the risks affecting the Company and its business.