Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LTNG.V ·

BeMetals Discovers Extensive Copper Mineralization of Similar Style to Major Mines and Projects in the Domes Region of the Zambian Copperbelt

Drill Results

1

TSXV – BMET

May 22, 2024 OTCQB – BMTLF

FRANKFURT – 1OI.F

BeMetals Discovers Extensive Copper Mineralization of Similar Style to

Major Mines and Projects in the Domes Region of the Zambian Copperbelt

Vancouver, British Columbia – BeMetals Corp. (TSXV: BMET, OTCQB: BMTLF, Frankfurt: 1OI.F) (the “Company” or “BeMetals”)

is pleased to announce that three of four new core holes have intersected significant copper sulphide mineralization at the

Pangeni Copper Project in Zambia (the “Project” or the “Property”). Today’s new analytical results support and enlarge the

Company’s discovery of extensive zones of copper mineralization covering more than 1.7 kilometres of strike length under sand

cover. Importantly, the copper mineralization bears many of the hallmarks in terms of style, width, grade, and geology to deposits

that are mined in the Domes Region of the Zambian Copperbelt.

DRILLING HIGHLIGHTS FROM CURRENT 2024 PROGRAM AT THE D-PROSPECT:

• Hole D24-C1 intersected 16.16 metres grading 0.74% copper (“Cu”) with 533 parts per million “ppm” cobalt (“Co”),

including 5.50 metres grading 0.93% Cu with 701ppm Co.

• Hole D11-C3 intersected 23.20 metres grading 0.54% Cu with 263ppm Co, including 7.90 metres 0.92% Cu with 453ppm

Co.

• Hole D22-C2 intersected 14.78 metres grading 0.42% Cu, including 4.88 metres grading 0.65% Cu.

• The intercepts in Holes D24-C1, D11-C3 and D22-C2 have copper grades and mineralized widths that approximate or

exceed those of certain large-scale copper mines in the Domes Region of the Zambian Copperbelt (1) (2) (3).

• The D-Prospect copper mineralization demonstrates many of the same geological features of the large-scale Lumwana

Copper Mine deposits in the Domes Region of the Zambian Copperbelt.

• The total footprint of copper mineralization now extends for more than 1.7 kilometres along strike, with the

mineralized intervals present from immediately beneath the sand cover, at approximately 25 metres depth, to some

275 metres vertically.

• Mineralization remains open along strike in both the SW and NE directions as well as down dip to the SE.

Note: Table 1 below provides details of these 2024 drilling program results.

John Wilton, President and CEO of BeMetals, stated “We are very excited with these latest drilling results from our Pangeni

Copper Project and given continued positive results, our team is increasingly confident that, at this stage of the exploration, we

are on the verge of making the first new copper discovery in the Zambian Copperbelt in decades. So far this year three of four

drill holes from which results have been received have intersected significant zones of copper mineralization, which in several

intervals have associated cobalt values. We are pleased to see that our drilling success has improved with increasing

understanding of the geological controls of the copper mineralization . The Project continues to deliver compelling results,

indicating significant scale to the mineralization, and with ongoing drilling success, the potential for discovery of a tier one copper

deposit beneath the Kalahari sand cover.

These technical results are enhanced by the pedigree of the Zambian Copperbelt, the increasing copper mining and exploration

investments into Zambia, and the strong fundamentals for copper demand. The Company acknowledges the hard work of our

Project field team , Remote Exploration Services (“RES”) and BluRock Mining ( Drilling), and our project partners Japan

Organization for Metals and Energy Security (“JOGMEC”), Copper Cross Zambia Limited and Pangeni Mineral Resources Limited.

The Company also recognizes the Zambian Ministry of Mines and Mineral Development for its continued support of the

exploration Project, as well as strategic investor B2Gold Corp. (a 19% shareholder of the Company).”

2

PANGENI COPPER PROJECT: D-PROSPECT

At the beginning of March 2024, during the Zambian rainy season, BeMetals commenced the first phase of core drilling as part

of the 2024 exploration program planned to comprise six holes for approximately 2,000 metres at the D -Prospect area of the

Pangeni Property. This phase of drilling was successfully completed on the 20th of May with a total of 2,038 metres. Currently,

analytical results have been received for four of the six drill holes , with geological logging and sampling still in progress for the

last two holes.

The current exploration program is focused on identifying zones of higher grade s and extending zones of known copper

mineralization. In January 2024, the Company reported an intersection of 18.10 metres grading 0.70% Cu in Hole D22-C1 (see

BeMetals news release January 9, 2024). This zone is characterized by consistent copper sulphide mineralization, comprising

disseminated and veinlet chalcopyrite and subordinate bornite. It is generally hosted within a scapolite and kyanite bearing schist

unit. It has been named the Nkala Zone. The Nkala Zone is interpreted to extend for at least 1.1 kilometres along strike within

the overall 1.7 kilometres of known copper mineralization. In the southwest of the currently drilled prospect, it has increased

widths and copper grades in a lens or shoot currently termed the Ingwe Shoot (see Figure 1).

To-date, Hole D24 -C1 is the southwestern most hole to have encountered copper mineralization in the Nkala Zone , with an

intersection of 16.16 metres grading 0.74% Cu and 533 ppm Co, including 5.50 metres grading 0.93% Cu and 701 ppm Co (see

Figures 1 and 2 for location and cross section). Hole D22-C2 intersected 14.78 metres grading 0.42% Cu some 110 metres to the

northeast of D24-C1, and Hole D11-C3 intersected 23.20 metres grading 0.5 4% Cu with 26 3 ppm Co, including 7.90 metres at

0.92% Cu, a further 500 metres east-northeast of Hole D24-C1 (see Figure 1 for drill hole locations).

There are now four drill h oles D24-C1, D22-C2, D11-C3, and previously reported D22-C1 that all intersected the interpreted

Ingwe Shoot of the Nkala Zone (see Figure 1, yellow symbols) , with copper grades that approximate or exceed those of several

large-scale copper mines in the Domes Region of the Zambian Copperbelt (1) (2) (3) (see mines and locations in Figure 3). The Ingwe

Shoot, with higher-grade copper and associated cobalt mineralization, is interpreted to be structurally controlled, similar in style

to the Equinox, Chimiwungo Main and East Shoots at the Lumwana Mine (2).

As reported in April 2024, Dr. Richard Sillitoe, technical advisor to BeMetals , concluded from review of the drill core at the D-

Prospect that the copper mineralization is closely similar in geological setting, style and age to that of the large -scale Lumwana

Copper Mine operated by Barrick Gold Corporation. The Lumwana Mine is producing at grades of 0.51% Cu and has a Measured

and Indicated Resource of 1.36 billion tonnes grading 0.52% Cu, containing 7.1 million tonnes (15.5 billion pounds) of copper2.

Hole D14-C1, previously reported, intersected multiple zones of copper mineralization , including 12.64 metres grading 0.32%

Cu, 12.91 metres grading 0.37% Cu , and 5.89 metres grading 0.38% Cu (see BeMetals news release April 3, 2024 ). Importantly

the upper zones of mineralization in this drill hole are projected to extend to the base of the Kalahari sand cover at roughly 25

metres vertical depth.

Drill hole D11-C2 intersected 14.00 metres grading 0.13% Cu within the Nkala Zone, interpreted as a possible margin of the Ingwe

Shoot, whereas Hole D11-C3 appears to have intersected a more central portion of the Shoot, returning robust grades over

significant widths (see Figure 1).

Thus far, copper grades in the Ingwe Shoot appear to be improving to the southwest and southeast, and additional drilling will

be required to test for further extensions of the mineralization as well as to confirm grade continuity. There remains significant

potential to expand the copper mineralization, following identification of additional target zones to the northeast. Also of interest

is the association of the higher-grade copper intercepts in D24-C1 and D11-C3 with appreciable intervals of cobalt mineralization,

ranging from 263 ppm Co over 23.20 metres in D11-C3 to 701 ppm Co over 5.50 metres in D24-C1. Table 1 includes all the latest

available analytical results from the 2024 drilling campaign. Table 2 provides azimuth, dip, end of hole depth and collar

coordinates for all these new drill holes.

As a result of the success of the ongoing exploration campaign, BeMetals intends to conduct a second and larger phase of core

and aircore drilling later this year to accelerate expansion of the mineralized footprint at the D-Prospect.

(1) First Quantum Minerals Ltd. website, Mineral Reserves - as at December 31, 2022, and reported based on a long-term $3.00/lb Cu price. The

current depleted in-pit Mineral Reserve as at December 31, 2022 for Sentinel.

(2) Barrick Gold Corporation website, Mineral Reserves – December 31, 2013, Technical Report on the Lumwana Mine, North-Western Province,

Republic of Zambia, Barrick Gold Corporation, Report for NI 43-101, March 27, 2014.

3

(3) Bernau, R., Roberts, S., Richards, M., Nisbet, B., Boyce, A., Nowecki, J. (2013) The geology and geochemistry of the Lumwana Cu (± Co ± U)

deposits, NW Zambia. Mineralium Deposita, 48:137–153.

Figure 1: Pangeni Copper Project: D-Prospect: 2024 Drilling Program Results to Date: D24-C1, D11-C3, D22-C2 and

D11-C2: Results, Plan Map with Previous Core Drill Holes, and Air Core Results (Inset Map Showing Project Licence Area of 575km2)

Figure 2: 2024 Drill Program: Simplified Cross Section Through Drill Hole D24-C1 (Looking Northeast)

4

Table 1: 2024 Drill Program First Phase: D-Prospect: D24-C1, D11-C3, D22-C2 and D11-C2 Drill Hole Intersection Results

Table 1 Notes : Intertek Genalysis completed the analytical work with the core samples processed at their preparation facility in Kitwe, Zambia. All analytical

procedures were conducted in an Intertek Genalysis laboratory in Perth, Australia. Reported widths are drilled core lengths a s true widths are unknown at this

time. Based upon current data it is estimated true widths range between 85 and 90% of the drilled intersections. A nominal cut-off grade of 0.30% Cu has been

used to determine the boundaries of these intersections with no more than 6.02 metres of internal dilution of the intercepts. *A nominal cut-off grade of 0.10%

Cu has been used to determine the boundaries of these intersections with no more than 6.91 metres of internal dilution of the intercept.

Prospect, Borehole ID & Interval From

(m)

To

(m) Core Interval (m) Cu % Co

ppm

D-Prospect

D24-C1

Interval 302.21 325.00 22.79 0.59 423

Including (Nkala Zone) 302.21 318.37 16.16 0.74 533

including 312.00 317.50 5.50 0.93 701

Interval 320.55 325.00 4.45* 0.31 163

D11-C3

Interval (Nkala Zone) 275.80 299.00 23.20 0.54 263

Including 275.80 283.70 7.90 0.92 453

Including 275.80 281.70 5.90 1.03 507

D22-C2 181.70 183.70 2.00 0.37 78

Interval 200.00 227.16 27.16* 0.35 51

Interval (Nkala Zone) 200.00 214.78 14.78 0.42 62

including 200.00 204.09 4.09 0.49 64

also Including 208.03 212.91 4.88 0.65 63

also Including 211.86 212.91 1.05 1.62 76

Interval 222.16 227.16 5.00 0.50 51

including 222.16 223.16 1.00 1.71 84

D11-C2 (Nkala Zone) 188.00 202.00 14.00* 0.13 67

5

Figure 3: Map Showing Selected Large Scale Copper Mines and Projects in Zambia and DRC

Source: Modified after MacIntyre, T., Gysi, A., Hitzman, M., (2018). Geology and Geochemistry of the Kansanshi Cu-Au deposit, Zambia.

Table 2: Pangeni Project: 2024 Program First Phase: Drill Hole ID, Azimuth, Dip, End of Hole Depth and Collar

Coordinates

Drill Hole ID Azimuth

degree

Dip

Degree

End of hole

Depth (m)

Easting

(m)

Northing

(m)

Elevation

(m) Status

D24-C1 300 -70 372.40 176762 8600991 1318 Priority zone results received

D22-C2 300 -65 300.00 176817 8601084 1321 Results received

D11-C3 300 -60 333.00 177270 8601036 1307 Priority zone results received

D11-C2 300 -60 303.00 177100 8601134 1313 Priority zone results received

D2-C3 310 -60 382.10 177525 8601062 1288 Logging and sampling in progress

D14-C2 300 -60 347.54 177726 8601231 1292 Logging and sampling in progress

QUALITY ASSURANCE AND QUALITY CONTROL

The results reported here for this core drilling program were analyzed by Intertek Genalysis, an independent and accredited

laboratory. Samples were prepared at their facility in Kitwe, Zambia and analytical work conducted in Perth, Australia. The results

were determined using multi -acid, near total digest, and analyzed by Inductively Coupled Plasma (“ICP”) Optical (Atomic)

Emission Spectrometry (“OES”). The core sampling was conducted with a robust sampling protocol that included the appropriate

insertion of standard reference material, duplicates and blanks into the sample stream. Field operations and management have

been provided by Remote Exploration Services (“RES”) an independent geological consulting and contracting company. The core

drilling was conducted by BluRock Mining (Drilling) Services of Kitwe, Zambia.

6

QUALIFIED PERSON STATEMENT

The technical information in this news release for BeMetals has been reviewed and approved by John Wilton, CGeol FGS, CEO

and President of BeMetals, and a “Qualified Person” as defined under National Instrument 43 -101.

ON BEHALF OF BEMETALS CORP.

“John Wilton”

John Wilton

President, CEO and Director

For further information about BeMetals please visit our website at bemetalscorp.com and sign-up to our email list to receive

timely updates, or contact:

Derek Iwanaka

Vice President, Investor Relations & Corporate Development

Telephone: 604-928-2797

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Ven ture

Exchange) accepts responsibility for the adequacy or accuracy of this news release .

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward -looking statements" and “forward looking information” (as defined under applicable securities laws), based on

management’s best estimates, assumptions and current expectations. Such statements include but are not limited to, statements with respect to future

exploration, development and advancement of the Kazan Projects in Japan and the Pangeni Project in Zambia, and the acquisition of additional base

and/or precious metal projects. Generally, these forward -looking statements can be identified by the use of forward -looking terminology such as

"expects", "expected", "budgeted", "forecasts", "anticipates", "plans", "anticipates", "believes", "intends", "estimates", "p rojects", "aims", "potential",

"goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or "should" occur. Th ese

statements should not be read as guarantees of future performance or results. Such statements involve known and unknown risk s, uncertainties and

other factors that may cause actual results, performance or achievements to be materially different from those expressed or implied by such statements,

including but not limited to: the actual results of exploration activities, the availability of financing and/or cash flow to fund the current and future plans

and expenditures, the ability of the Company to satisfy the conditions of the option agreement for the Pangeni Project, and changes in the world

commodity markets or equity markets. Although the Company has attempted to identify important factors that could cause actual results to differ

materially from those contained in forward -looking statements, there may be other factors that cause results not to be as anticipated, estimated or

intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated in such statements. The forward -looking statements and forward looking information are ma de as of the date hereof and are qualified in

their entirety by this cautionary statement. The Company disclaims any obligation to revise or update any such factors or to publicly announce the result

of any revisions to any forward -looking statements or forward looking information contained herein to reflect future results, events or developments,

except as require by law. Accordingly, readers should not place undue reliance on forward -looking statements and information. Please refer to the

Company’s most recent filings under its profile at www.sedarplus.ca for further information respecting the risks affecting the Company and its business.