Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LTNG.V ·

BeMetals Intersects Further Encouraging Copper Results from the Pangeni Exploration Project in Zambia

Exploration Programs

TSXV – BMET  

January 25, 2022                                                          OTCQB – BMTLF 

            FRANKFURT – 1OI.F 

BeMetals Intersects Further Encouraging Copper Results from the Pangeni 

Exploration Project in Zambia 

Vancouver,  British  Columbia  –  BeMetals  Corp.  (TSXV:  BMET,  OTCQB:  BMTLF,  Frankfurt:  1OI.F)  (the 

“Company” or “BeMetals”) is pleased to announce results from its 2021 core drilling program at the Pangeni 

Copper  Exploration  Project  (“Pangeni  Project”  or  the  “Project”),  located  on  the  western  extension  of  the 

Central African Copperbelt in Zambia. This program comprised six drill holes to test aircore copper anomalies 

at  the  D‐Prospect  and  the  Q  and  F  targets.  The  Pangeni  Project  is  located  in  an  area  where  prospective 

extensions to the prolific Zambian Copperbelt (See Figure 1) are covered by a thin veneer of Kalahari sand 

units.     

HIGHLIGHTS OF THE 2021 PANGENI COPPER PROJECT CORE DRILLING 

  Q‐Target: Drill Hole Q3‐C1 intersected 4.14 metres grading 0.62% copper (“Cu”) 

o  Including: 1.30 metres grading 1.10% Cu 

  D‐Prospect: Drill Hole D7‐C1 intersected 5.00 metres grading 0.58% Cu 

  D‐Prospect: Drill Hole D7‐C2 intersected 3.37 metres grading 0.51% Cu 

o And also: intersected 6.00 metres grading 0.39% Cu 

Note: Intertek Genalysis completed the analytical work with the core samples processed at their preparation facility in Kitwe, Zambia. All analytical 

procedures were conducted in an Intertek Genalysis laboratory in Australia. Reported widths are drilled core lengths as true widths are unknown at this 

time. Based upon current data it is estimated true widths range between 80 to 90% of the drilled intersections. 

John Wilton, President and CEO of BeMetals commented, “The 2021 drilling program at the Pangeni Copper 

Project has delivered a new and exciting dimension to our copper exploration with drill hole Q3‐C1 returning 

a significant copper intersection hosted in siltstones at the Q‐Target. These siltstone units are interpreted to 

be part of the Katanga Supergroup.  Katanga lithologies near basement units are known to be the setting for 

many world class copper deposits in the Central African Copperbelt. This first Katanga sediment hosted copper 

intersection  adds considerable prospectivity to the Project. We  are now designing a follow‐up exploration 

campaign for the Q‐Target area to focus on its relatively close proximity to the SW‐Prospect and a number of 

untested shallow aircore copper anomalies to the west and north of the Q3‐C1 drill hole intersection.  

Including today’s results from the D‐Prospect, we are also encouraged that five of six core holes completed to 

date  have  returned  significant  copper  mineralization.  The  grades  of  these  intersections  are  similar  to 

producing  operations  in  the  Domes  Region,  such  as  First  Quantum  Minerals’  Sentinel  and  Barrick  Gold’s 

Lumwana copper mines in the Zambian Copperbelt. Further exploration to scope the scale potential of the D‐

Prospect mineralization is also being planned.”    

2

PANGENI COPPER PROJECT 

In 2021 the Company completed 1,382 metres of core drilling in six holes, 4,353 metres of shallow aircore, 

and a helicopter‐borne electromagnetic (“EM”) survey over the Project. The interpretation of the EM survey 

data was integrated with previous geophysical and geological interpretations of the Property. The EM data 

improved exploration target selection and mapping of the Kalahari sand cover units. Four priority targets were 

identified from the aircore program for testing with core drilling. These were related to both the D‐Prospect 

and  two  standalone  new  exploration  targets,  namely  the  Q  and  F  targets  (See  Figure  1).  The  core  drilling 

program was completed in early December and the analytical results were recently received. Table 1 provides 

details  of  the  drilled  copper  intersections  from  the  core  drilling  and  Table  2  provides  the  collar  location, 

azimuth and dip information. 

Q‐TARGET 

The intersection of 4.14 metres grading 0.62% Cu (from 92.36 metres drilled depth) is of specific interest as 

this zone of observed copper oxide mineralization in drill hole Q3‐C1 is hosted within siltstones interpreted to 

be part of the Katanga Supergroup.  These siltstones have been intersected in relatively close proximity  to 

what is currently interpreted to be basement hosted copper mineralization at the SW‐Prospect (See Figure 2). 

Many of the world class, sediment‐hosted, copper deposits and mines of the Central African Copperbelt occur 

in  this  type  of  geological  setting  when  coupled  with  favourable  structural  feeders  for  the  copper 

mineralization.  

Figure 2 illustrates the location of the Q3‐C1 drill hole in relation to the 2021 and previous shallow aircore 

drilling  anomalies.  Based  upon  the  new  geological  results,  complemented  with  interpretation  of  the 

geophysics for the Project, we expect the prospective target area of the structural and/or stratigraphic contact 

zone between the basement and the Katangan Supergroup units to be located between the Q3‐Target and 

SW‐Prospect. Figure 2 also indicates a number of untested shallow aircore targets to the north and west of 

Q3‐C1 which now represent high follow‐up priority targets for 2022. 

D‐PROSPECT 

The Company first discovered copper mineralization at the D‐Prospect near the end of 2019 and this area 

remains an important target area for further exploration. Table 1 provides details of the mineralized zones 

intersected in drill holes D7‐C1, D7‐C2 and D3‐C2. These drill holes returned meaningful and multiple copper 

intersections ranging from 6.0 to 0.5 metres in width and 0.58% Cu to 0.32% Cu in grade (0.3% Cu cut‐off 

grade).  

Figure 3 shows the recent results from the 2021 core drilling program in context with the previous core and 

shallow aircore data. Thus far, copper mineralization extends for at least 1.2 kilometres along the interpreted 

strike of the host rocks and remains completely open to extension in the southwest direction and down‐dip. 

The aircore drilling to date to the northeast of the prospect has not identified drill targets in that direction but 

the relatively wide spaced drill centres at 400 metres does not rule out potential extensions in that area. Also, 

there is an untested aircore anomaly towards the northwestern end of the D2 line (See Figure 3). 

Significant copper mineralization has now been intersected in five of the six core drill holes completed at the 

D‐Prospect. The copper grades in many of the 2021 (D7‐C1 & D7‐C2) and previous drill holes are similar to 

those for operating large‐scale copper mines in the Domes Region of the Zambian Copperbelt (Examples: First 

Quantum  Minerals’  Sentinel  Mine  Reserves:  792.4  million  tonnes  grading  0.46%  Cu(1)  and  Barrick  Gold’s 

Lumwana Mine Reserves: 538.8 million tonnes grading 0.56% Cu(2)). 

(1) First Quantum Minerals Ltd. website, Mineral Reserves ‐ as at December 31, 2020, and reported based on a long‐term $3.00/lb Cu 

price. The current depleted in‐pit Mineral Reserve as at December 31, 2020 for Sentinel 

3

(2) Barrick Gold Corporation website, Mineral Reserves – December 31, 2013, Technical Report on the Lumwana Mine, North‐Western 

Province, Republic of Zambia, Barrick Gold Corporation, Report for NI 43‐101, March 27, 2014 

F‐TARGET 

Figure 1 shows the location of the F‐Prospect. Drill holes F4‐C1 and F4‐C2 encountered interpreted basement 

lithologies without significant width zones of copper mineralization above 0.3% Cu. 

Figure 1: Location of the Q‐TARGET, D‐PROSPECT and F‐TARGET

4

Figure 2: Map of Q‐TARGET, Q3‐C1 Drill Hole Results with SW‐PROSPECT Results and Aircore Anomalies (See 

Company’s previously reported news releases dated October 16, 2019 and October 6, 2021).

Figure 3: Map of D‐PROSPECT, D7‐C1, D7‐C2 and D3‐C2 with Core Results and Aircore Anomalies (See Company’s 

previously reported news releases dated October 16, 2019, April 14, 2021 and October 6, 2021).

5

Table 1: Selected Core Drill Hole Results from 2021 Exploration Program: Q3‐C1, D7‐C1, D7‐C2 and D3‐C2 

Prospect, Target, 

Borehole ID & Interval 

From 

(m) 

To 

(m) 

Core Interval 

(m)  Cu % 

Q‐TARGET       

Q3‐C1  92.36  96.50  4.14      0.62*  

Including:  94.70  96.00  1.30  1.10 

D‐PROSPECT       

D7‐C1       

Interval 1:  43.00  48.00  5.00     0.58* 

Interval 2:  99.76  103.26  3.50  0.38 

Interval 3:  111.50  112.00    0.50†  0.50 

 Interval 4:  127.05  132.05  5.00  0.32 

Including:  127.05  129.05  2.00  0.46 

And Including:  131.05  132.05  1.00  0.53 

D7‐C2       

Interval 1:  118.09  121.46  3.37  0.51 

Interval 2:  158.00  160.12  2.12  0.56 

Interval 3:  178.42  184.42  6.00  0.39 

Including:  178.42  180.80  2.38  0.45 

And Including:  182.90  184.42  1.52  0.59 

D3‐C2  124.89  125.40  0.51  0.42 

Note: Intertek Genalysis completed the analytical work with the core samples processed at their preparation facility in Kitwe, Zambia. All analytical 

procedures were conducted in an Intertek Genalysis laboratory in Perth, Australia. Reported widths are drilled core lengths as true widths are 

unknown at this time. Based upon current data it is estimated true widths range between 80 to 90% of the drilled intersections. A nominal cut‐off 

grade of 0.30% Cu has been used to determine the boundaries of the intersections with no more than 2 metres of internal dilution of the intercept.

† denotes single sample. *Copper Oxide mineralization observed. 

QUALITY ASSURANCE AND QUALITY CONTROL 

The results reported here for this core drilling program were analyzed by Intertek Genalysis, an independent 

and  accredited  laboratory.  Samples  were  prepared  at  their  facility  in  Kitwe,  Zambia  and  analytical  work 

conducted  in  Australia.  The  results  were  determined  using  multi‐acid,  near  total  digest,  and  analyzed  by 

Inductively Coupled Plasma (“ICP”) Optical (Atomic) Emission Spectrometry (“OES”). The core sampling was 

conducted  with  a  robust  sampling  protocol  that  included  the  appropriate  insertion  of  standard  reference 

material, duplicates, and blanks into the sample stream. 

Field  operations  and  management  have  been  provided  by  Remote  Exploration  Services  (“RES”)  an 

independent  geological  consulting  and  contracting  company.  The  core  drilling  was  conducted  by  Blurock 

Mining Services, of Kitwe, Zambia. 

6

Table 2: 2021 Core Hole ID, Azimuth, Dip, End of Hole Depth and Collar Coordinates and Comments 

Drill 

Hole ID 

Azimuth 

Degree 

Dip 

Degree 

End of hole 

Depth (m) 

Easting 

(m) 

Northing 

(m) 

Elevation 

(m) 

Comments 

Q3‐C1  290  70  272.55  173085  8584343  1163  Results in Table 1 

D7‐C1  310  60  249.70  177684  8601474  1305  Results in Table 1 

D7‐C2  290  60  286.32  177765  8601424  1304  Results in Table 1 

D3‐C2  310  60  175.55  179315  8600940  1259  Results in Table 1 

F4‐C1  310  60  191.80  175000  8600979  1313  Did not intersect significant 

mineralization 

F4‐C2  080  70  206.43  174789  8601057  1301  Did not intersect significant 

mineralization 

THE PANGENI COPPER EXPLORATION PROJECT   

The Pangeni Project is located on the western extension of the Zambian Copperbelt, within the Lufilian Arc, 

underlain by Katangan Supergroup metasediments situated unconformably on basement schists and gneisses, 

which are covered by a thin veneer of Kalahari sands. The open pit Sentinel Copper Mine is operated by First 

Quantum  Minerals  Ltd.  some  130  kilometres  to  the  northeast  of  the  Pangeni  Project.  A  number  of  major 

international mining companies have identified this region of the Zambian Copperbelt to be prospective for 

the discovery of tier one copper mines and are also conducting extensive exploration work in this area.

The Pangeni Project property is geologically prospective for the following deposit types; Basement‐hosted Cu 

(analogues:  the  Lumwana  Deposit,  Nyungu  Prospect),  Sediment‐hosted  stratiform  Cu‐Co  (analogues: 

Nchanga, Konkola, Nkana, and Mufulira Deposits), other Domes Region Deposits e.g. Sentinel, and Kansanshi 

and DRC Copperbelt Deposits e.g. Lonshi, Frontier, Kamoa‐Kakula). 

ABOUT BEMETALS CORP. 

BeMetals is a precious and base metals exploration and development company focused on becoming a leading 

metal producer through the acquisition of quality exploration, development and potentially production stage 

projects. The Company has recently established itself in the gold sector with the acquisition of certain wholly 

owned exploration projects in Japan. BeMetals is also progressing both its advanced high‐grade, zinc‐silver‐

gold‐copper  polymetallic  underground  exploration  at  the  South  Mountain  Project  in  Idaho  through  a 

preliminary economic assessment, and its tier‐one targeted, Pangeni Copper Exploration Project in Zambia.  

Guiding  and  leading  BeMetals’  growth  strategy  is  a  strong  board  and  management  team,  founders  and 

significant  shareholders  of  the  Company,  who  have  an  extensive  proven  record  of  delivering  considerable 

value in the mining sector through the discovery, construction and operation of mines around the world. 

The technical information in this news release for BeMetals has been reviewed and approved by John Wilton, 

CGeol FGS, CEO and President of BeMetals, and a “Qualified Person” as defined under National Instrument 

43‐101.1 

ON BEHALF OF BEMETALS CORP. 

“John Wilton” 

John Wilton 

President, CEO and Director 

For further information about BeMetals please visit our website at bemetalscorp.com and sign‐up to our email 

list to receive timely updates, or contact: 

7

Derek Iwanaka 

Vice President, Investor Relations & Corporate Development 

Telephone: 604‐609‐6141 

Email:   [email protected]    

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies 

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release 

Cautionary Note Regarding Forward‐Looking Statements 

This  news  release  contains  "forward‐looking  statements"  and  “forward  looking  information”  (as  defined  under  applicable 

securities laws), based on management’s best estimates, assumptions and current expectations. Such statements include but 

are  not  limited  to,  statements  with  respect  to  future  exploration,  development  and  advancement  of  the  South  Mountain 

Project, the Pangeni project and the Japan properties, and the acquisition of additional base and/or precious metal projects.  

Generally, these forward‐looking statements can be identified by the use of forward‐looking terminology such as "expects", 

"expected", "budgeted", "forecasts", "anticipates", "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims", 

"potential",  "goal",  "objective",  "prospective",  and  similar  expressions,  or  that  events  or  conditions  "will",  "would",  "may", 

"can", "could" or "should" occur.  These statements should not be read as guarantees of future performance or results.  Such 

statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or 

achievements to be materially different from those expressed or implied by such statements, including but not limited to: the 

actual results of exploration activities, the availability of financing and/or cash flow to fund the current and future plans and 

expenditures, the ability of the Company to satisfy the conditions of the option agreements for the South Mountain Project 

and/or  the  Pangeni  Project,  and  changes  in  the  world  commodity  markets  or  equity  markets.  Although  the  Company  has 

attempted to identify important factors that could cause actual results to differ materially from those contained in forward‐

looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can 

be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from 

those anticipated in such statements. The forward‐looking statements and forward looking information are made as of the 

date hereof and are qualified in their entirety by this cautionary statement.  The Company disclaims any obligation to revise or 

update  any  such  factors  or  to  publicly  announce  the  result  of  any  revisions  to  any  forward‐looking  statements  or  forward 

looking information contained herein to reflect future results, events or developments, except as require by law. Accordingly, 

readers should not place undue reliance on forward‐looking statements and information. Please refer to the Company’s most 

recent filings under its profile at www.sedar.com for further information respecting the risks affecting the Company and its 

business.