Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LTNG.V ·

BeMetals Identifies Compelling Copper Exploration Targets from Shallow Aircore Drilling Results at Pangeni Project in Zambia

Drill Results Exploration Programs

TSXV – BMET

October 6, 2021 OTCQB – BMTLF

FRANKFURT – 1OI.F

BeMetals Identifies Compelling Copper Exploration Targets from Shallow Aircore

Drilling Results at Pangeni Project in Zambia

Vancouver, British Columbia – BeMetals Corp. (TSXV: BMET, OTCQB: BMTLF, Frankfurt: 1OI.F) (the

“Company” or “BeMetals”) is pleased to announce the results from a phase of some 4,350 metres of shallow

aircore drilling recently completed at the Pangeni Copper Project (“Project” or the “Property”) in Zambia. This

aircore program was designed to explore for extensions of copper mineralization discovered by the Company

under thin Kalahari sand cover at several prospects , including the D Prospect, and to test seve ral newly

generated copper targets. The Pangeni Project is located in an area representing westerly extensions to the

prolific Zambian Copperbelt.

HIGHLIGHTS OF THE 2021 PANGENI PROJECT AIRCORE PROGRAM

 D-Prospect returns highest tenor aircore copper target in hole D7-04 on the Property to date of 3,183

parts per million (ppm) over 2 metres with 1 metre at 4,363ppm

 Potential D-Prospect extension zone identified in aircore hole D3 -15 of 1, 217ppm copper over 3

metres with 1 metre at 1,344ppm some 1.4 kilometres southeast of previously drilled mineralization

 Newly identified F – Target

 Newly identified Q – Target some 3km southeast of the SW-Prospect

John Wilton, President and CEO of BeMetals stated, “We are encouraged with the results from the 2021 phase

of shallow aircore drilling below the thin sand cover that has delivered a number of robust bedrock copper

targets. These targets are potential extensions and/ or potential vectors to higher -grade zones of copper

mineralization we discovered in previous phases of drilling. In addition, a number of new standalone targets

well situated geologically within the Property have been identified . To follow -up on these recent aircore

results, w e have commenced a program of approximately 1,400 metres of core drilling to test the se

compelling copper targets. We look forward to the results of the core drilling program that has the potential

to both expand the footprint of the D-Prospect mineralization and test the exciting newly identified copper

targets.

This exploration program continues to be jointly funded by BeMetals and Japan, Oil, Gas and Metals National

Corporation (“JOGMEC”) that has allowed for acceleration of our exploration program. The Pangeni Project,

together with our recently acquired Kazan Gold Project in Japan and ongoing exploration at the high-grade

zinc-silver-gold-copper, South Mountain Project in Idaho, U.S.A., provides an excellent and building portfolio

of projects with exciting growth potential for the Company.”

2021 PANGENI PROJECT EXPLORATION AND AIRCORE PROGRAM

Early in June the Company commissioned New Resolution Geophysics (NRG™) to fly a n Xcite™ helicopter-

borne electromagnetic survey over the Property and the interpretation of this data was used to define targets

2

through improved stratigraphic and structural mapping for subsequent aircore testing . The Company has

successfully completed a program of 4,353 metres of shallow aircore drilling and returned a number of

significant bedrock copper geochemical targets beneath the Kalahari sand cover. These new bedrock copper

targets represent both potential extensions to prospects where the Company discovered copper

mineralization in pr evious phases of exploration and newly identified standalone targets in interpreted

favourable geological settings for the development of sediment hosted copper deposits.

Figure 1 illustrates the location of the D7-C1, D3-C2, F4-C1, and Q3-C1 targets within the Project area. It also

indicates the range of maximum copper values for each aircore hole from the recently completed 2021

program in blue circles with results from the previous phases of aircore drilling in the red circle s.

Figure 2 shows details of the 2021 aircore results plotted on a simplified cover regolith map of the D-Prospect

area. The circles and labels indicate the range of maximum bedrock copper results for each shallow aircore

hole in relation to the Company’s previous core drilled copper intersections at this prospect (aircore holes:

D2-C1, D2-C2 and D3-C1). The highly anomalous D7-04 aircore target is indicated as 3,183ppm copper over 2

metres with the supporting adjacent D7-4A aircore hole returning 1,802ppm copper over 2 metres. The wide

spacing of the D2, D7 and D3 aircore lines should be noted at some 400 metres along the interpreted strike of

the units indicating the significant footprint of the mineralization.

3

Also indicated is the D-Prospect’s southeastern extension target some 1.4km from previous intersected

mineralization as defined by aircore target D3-15 of 1,217ppm copper over 3 metres and supported by the

adjacent D3-15B hole with 4 34ppm copper over 2 metres . Over much of these two D -Prospect targets the

cover of the Kalahari sand is less than approximately 25 metres in thickness (See Tables 1 and 2 for details of

these aircore holes).

Figure 2: D-Prospect Regolith Cover Map, 2021 Aircore Drilling Results as ppm Copper ( Blue Circles with

hole number, ppm Cu), Previous Aircore Results (Red Circles with ppm Cu) and Previous Drilled Core Hole

Copper Intersections.

NEWLY IDENTIFIED AND DEFINED COPPER TARGETS

The 2021 aircore program has also identified and defined several new standalone copper targets for core drill

testing. The F -Target represents a geological well- positioned bedrock copper geochemical anomaly with

potentially several kilometres in strike. This anomaly is best indicated at the F4-C1 target where aircore holes

F4-2A, F4-02 and F4-2B returned bedrock samples of 717 over 3 metres with 1,113 over 1 metre, 782 over 4

metres with 1,052 over 1 metre and 893 ppm copper over 1 metre respectively as adjacent holes over some

200 metres of lateral extent. The Q3-C1 Target, situated some 4km to the southeast of the SW-Prospect, has

been defined by aircore holes Q3 -09 and Q3 -12 with 884 over 1 metre and 502ppm over 1 metre copper

respectively. The centre of this target is mapped by aircore holes Q3-02 and Q3-03 with 1,260 over 3 metres

with 2,146 over 1 metre and 982 over 5 metres with 1,545ppm over 1 metre copper respectively that were

completed in the 2020 exploration program.

4

Table 1: 2021 Aircore Program Selected Hole Results

Aircore Hole ID From

(m)

To

(m)

Sample

Interval

(m)

Copper

(ppm)

Kalahari

Sand

Thickness

D7-04 27 28 1 4,363 -

D7-04 28 29 1 2,004 26

D7-4A 25 26 1 1,672 -

D7-4A 26 27 1 1,932 24

D3-15 36 37 1 1,266 -

D3-15 37 38 1 1,344 -

D3-15 38 39 1 1,041 34

D3-15B 27 28 1 447 -

D3-15B 28 29 1 422 25

F4-2A 27 28 1 508 -

F4-2A 28 29 1 531 -

F4-2A 29 30 1 1,113 26

F4-02 20 21 1 586 -

F4-02 21 22 1 580 -

F4-02 22 23 1 913 -

F4-02 23 24 1 1,051 20

F4-2B 26 27 1 893 23

Q3-09 70 71 1 884 69

Q3-12 62 63 1 502 60

Q3-02* 59 60 1 2,146 -

Q3-02 60 61 1 558 -

Q3-02 61 62 1 1,077 56

Q3-03* 56 57 1 753 -

Q3-03 57 58 1 824 -

Q3-03 58 59 1 977 -

Q3-03 59 60 1 1,545 -

Q3-03 60 61 1 814 56

*Results from 2020 Aircore Program Previously Reported

Note: Sample widths are drilled lengths as true widths are unknown at this time. The aircore drilling is intended to sample the bedrock and

saprolite material at the base of the Kalahari sand cover only and holes are stopped generally between 3-5m of this contact.

QUALITY ASSURANCE AND QUALITY CONTROL

On September 15, 2021, an independent laboratory, Intertek Genalysis of Australia, provided results from a

set of samples from the 2021 aircore program. These results were determined using multi- acid, near total

digest, and analysed by Inductively Coupled Plasma (“ICP”) Optical (Atomic) Emission Spectrometry (“OES”).

The sampling was conducted with a robust sampling protocol based upon sequential 1 metre samples that

included the appropriate insertion of standard refere nce material, duplicates, and blanks into the sample

stream in the field.

Field operations and management have been provided by Remote Exploration Services (“RES”) an

independent geological consulting and contracting company. The aircore drilling was conducted by Blurock

5

Mining Services, of Kitwe, Zambia. Details of the sampling protocol were provided in BeMetals news release

“BeMetals Returns Positive Results From Phase 1 Aircore Drilling Program At Pangeni Copper Project,” dated

November 15, 2018, available on www.bemetalscorp.com and SEDAR.

Table 2: 2021 Aircore Program Selec ted Hole Results, Hole ID, Azimuth, Dip, E nd of Hole Depth, Collar co -

ordinates

Aircore Hole

ID

Azimuth

Degree

Dip

Degree

End of hole

Depth (m) UTM_X UTM_Y Elevation

D7-04 Vertical -90 29 177549 8601553 1314

D7-4A Vertical -90 27 177646 8601502 1304

D3-15 Vertical -90 39 179148 8601021 1249

D3-15B Vertical -90 30 179260 8600964 1242

F4-2A Vertical -90 30 174964 8601003 1314

F4-02 Vertical -90 24 174883 8601077 1290

F4-2B Vertical -90 27 174823 8601142 1309

Q3-09 Vertical -90 71 172890 8584552 1164

Q3-12 Vertical -90 64 173108 8583998 1155

Q3-02 Vertical -90 64 173036 8584357 1159

Q3-03 Vertical -90 61 173077 8584280 1162

ABOUT THE PANGENI COPPER PROJECT

The Pangeni Project is located on the western extension of the Zambian Copperbelt, within the Lufilian Arc,

underlain by Katangan Supergroup metasediments situated unconformably on basement schists and gneisses,

which are covered by a thin veneer of Kalahari sands. The open pit Sentinel Copper Mine is operated by First

Quantum Minerals Ltd. some 130 kilometres to the northeast of the Pangeni Project (See Figure 3). A number

of major international mining companies have identified this region of the Zambian C opperbelt to be

prospective for the discovery of tier one copper mines and are also conducting extensive exploration work in

this area. The Pangeni Project property is geologically prospective for the following deposit types; Basement-

hosted Cu (analogues: the Lumwana Deposit, Nyungu Prospect), Sediment -hosted stratiform Cu -Co

(analogues: Nchanga, Konkola, Nkana, and Mufulira Deposits), other Domes Region Deposits e.g. Sentinel, and

Kansanshi and DRC Copperbelt Deposits e.g. Lonshi, Frontier, Kamoa-Kakula).

6

Figure 3: Regional Location of the Pangeni Copper Exploration Project

ABOUT BEMETALS CORP.

BeMetals is a precious and base metals exploration and development company focused on becoming a leading

metal producer through the acquisition of quality exploration, development and potentially production stage

projects. The Company has recently established itself in the gold sector with the acquisition of certain wholly

owned exploration projects in Japan. BeMetals is also progressing both its advanced high -grade, zinc-silver-

gold-copper polymetallic underground exploration at the South Mountain Project in Idaho through a

preliminary economic assessment, and its tier- one targeted, Pangeni Copper Exploration Project in Zambia.

Guiding and leadin g BeMetals’ growth strategy is a strong board and management team, founders and

significant shareholders of the Company, who have an extensive proven record of delivering considerable

value in the mining sector through the discovery, construction and operation of mines around the world.

The technical information in this news release for BeMetals has been reviewed and approved by John Wilton,

CGeol FGS, CEO and President of BeMetals, and a “Qualified Person” as defined under National Instrument

43-101.1

ON BEHALF OF BEMETALS CORP.

“John Wilton”

John Wilton

President, CEO and Director

7

For further information about BeMetals please visit our website at bemetalscorp.com and sign-up to our email

list to receive timely updates, or contact:

Derek Iwanaka

Vice President, Investor Relations & Corporate Development

Telephone: 604-609-6141

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward- looking statements" and “forward looking information” (as defined under applicable

securities laws), based on management’s best estimates, assumptions and current expectations. Such statements include but

are not limited to, statements with respect to future exploration, development and advancement of the South Mountain

Project, the Pangeni project and the Japan properties, and the acquisition of additional base and/or precious metal projects.

Generally, these forward-looking statements can be identified by the use of forward- looking terminology such as "expects",

"expected", "budgeted", "forecasts", "anticipates", "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims",

"potential", "goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may",

"can", "could" or "should" occur. These statements should not be read as guarantees of future performance or results. Such

statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or

achievements to be materially different from those expressed or implied by such statements, including but not limited to: the

actual results of exploration activities, the availability of financing and/or cash flow to fund the current and future plans and

expenditures, the ability of the Company to satisfy the conditions of the option agreements for the South Mountain Project

and/or the Pangeni Project, and changes in the world commodity markets or equity markets. Although the Company has

attempted to identify important factors that could cause actual results to differ materially from those contained in forward-

looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can

be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from

those anticipated in such statements. The forward- looking statements and forward looking information are made as of the

date hereof and are qualified in their entirety by this cautionary statement. The Company disclaims any obligation to revise or

update any such factors or to publicly announce the resul t of any revisions to any forward- looking statements or forward

looking information contained herein to reflect future results, events or developments, except as require by law. Accordingly ,

readers should not place undue reliance on forward- looking statements and information. Please refer to the Company’s most

recent filings under its profile at www.sedar.com for further information respecting the risks affecting the Company and its

business.