Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LTNG.V ·

BeMetals Returns Further Positive Drilling Results from Pangeni Copper Project

Drill Results

TSXV – BMET

OTCQB – BMTLF

April 14, 2021 FRANKFURT – 1OI.F

BeMetals Returns Further Positive Drilling Results from Pangeni Copper Project

VANCOUVER, CANADA - BeMetals Corp. (TSXV: BMET, OTCQB: BMTLF, Frankfurt: 1OI.F) (the “Company” or

“BeMetals) is pleased to announce it has received encouraging exploration drilling results from its 2020 field

program at the Pangeni Copper Project (“Pangeni” or the “Project” or the “Property”) in Zambia. The laboratory

results from the 2020 drilling campaign highlight both the compelling focused exploration potential at the D-

Prospect and generated additional priority targets for testing during this year’s field program.

The Pangeni Project is located on the prospective western extension of the Central African Copperbelt in Zambia

(the “Zambian Copperbelt”) where copper mineralization discovered on the Property is covered by a thin veneer

of Kalahari sand.

HIGHLIGHTS:

• Drill hole D3-C1: Interval 1: 3.98 metres grading 0.39% Copper (“Cu”) from 71.45 metres

Interval 2: 3.70 metres grading 0.37% Cu from 153.36 metres

• Strong motivation for follow-up aircore and core drilling at the D-Prospect

• Newly identified priority G2 and Q3 targets from 2020 aircore program

• Aircore drilling and field operations to commence in H1 2021

Note: See Table 1 below for drill intersection details and QA/QC section

BeMetals President and CEO, John Wilton stated, “ We are highly encouraged by the results from both our 2020

shallow aircore and follow-up core drilling programs. Core drill hole D3-C1 with intervals of 3.98 metres at 0.39%

Cu and 3.70 metres at 0.37% Cu are of specific interest. These two shallow copper intersections are meaningful,

as they occur some 850 metres along the same interpreted strike of mineralized zones intersected in holes D2-C1

and D2-C2 during the 2019 field season. D2-C1 intersected 5.50 metres grading 0.53% Cu, and D2-C2 intersected

5.56 metres grading 0.47% Cu. The combined results significantly expand the footprint and potential of the D -

Prospect underneath the shallow sand cover in this area.

In addition to the successful D-Prospect results, the 2020 aircore program generated two new targets for priority

exploration follow -up during the 2021 field se ason at the G2 and Q3 targets. The G2 target is located at an

interpreted formation contact and the Q3 target is a new standalone anomaly associated with a structural target

some four kilometres southeast of the SW-Prospect.

As recently reported, the Company has entered into a Joint Exploration and Option Agreement with Japan Oil,

Gas and Metals National Corporation (“JOGMEC”) that will allow for acceleration of planned 2021 exploration

with funding from both BeMetals and JOGMEC. We are currently completing the detailed design of this year’s

expanded exploration program and are excited to commence the campaign.”

- 2 -

2020 EXPLORATION DRILLING RESULTS

The 2020 exploration program included the completion of some 3,700 metres of shallow aircore drilling to test

both significant step outs from copper intersection s from the 2019 field work and to test other priority targets

generated from the interpretation of the airborne magnetics. Also approximately 770 metres of core drilling was

completed in five drill holes to test the copper anomalies below the Kalahari sand cover. The 2020 drilling program

was completed in mid -December. F ull laboratory results were received in late March 2021, and quality

assessments of the data completed.

D-PROSPECT

Figure 1 below illustrates the location and intersected copper mineralization grades in the drill hole D3 -C1 in

relation to the regolith cover map for the area. It shows the new copper intersections in drill hole D3-C1 (See Table

1 below) are some 850 metres from the previously discovered copper zones intersected in D2-C1 and D2-C2 (See

BeMetals’ news release dated October 16, 2019 ). A number of aircore drilling anomalies on line D2 remain

untested and there is currently no aircore drilling extending to the southeast on line D3. Within an approximate

500 metre radius of these copper intersections the average Kalahari sand cover is some 24 metres.

The Company intends to complete infill and step out lines of aircore drilling with the intention of generating more

core drilling targets at this exciting D-Prospect.

FIGURE 1: LOCATION OF D3 -C1 DRILL HOLE AT D-PROSPECT WITH AIRCORE DRILLING ANOMALIES AND

REGOLITH COVER MAP

- 3 -

TABLE 1: 2020 CORE DRILLING PROGRAM SIGNIFICANT RESULTS

Borehole ID & Zone From

(m)

To

(m)

Core Interval

(m)

Cu

%

D2 PROSPECT

D3-C1

Interval 1: 71.45 75.43 3.98* 0.39

Interval 2: 153.36 157.06 3.70‡ 0.37

CT PROSPECT

B2-C2

34.23 34.72 0.49† 0.67

136.09 136.59 0.50† 0.47

168.00 168.50 0.50† 1.00

Note: Intertek Genalysis completed the analytical work with the core samples processed at their preparation facility in Kitwe,

Zambia. All analytical procedures were conducted in an Intertek Genalysis laboratory in Australia. Reported widths are drilled

core lengths as true widths are unknown at this time. Based upon current data it is estimated true widths range between 80

to 90% of the drilled intersections. *A nominal cut -off grade of 0.40% Cu has been used to determine the boundaries of the

intersection with internal dilution at 0.30% Cu not exceeding 1 metre of the intercept. ‡ denotes intersection where a cut -off

grade of 0.25% Cu has been used with no internal dilution. † denotes single sample.

C4, C5 TARGETS AND CT-PROSPECT

Figure 2 below shows the location of the five 2020 field program core drill hole collars plotted on a satellite image

of the Property. Also indicated are the aircore anomalies for the P roject to date based upon laboratory results.

Drill holes C4-C1 and C5-C1 intersected interpreted basement units with no significant mineralization.

At the CT-Prospect drill hole B2-C2 returned three approximately 0.50 metres length samples with copper grades

of 0.67, 0.47 and 1.00% Cu respectively. These mineralized zones are related to chalcopyrite and minor amounts

of bornite copper sulphides and associated with observed kyanite, an alteration mineral. Kyanite has an important

association with the mineralization at the Sentinel Copper Mine some 130 kilometres from the Pangeni Project.

The thickness of Kalahari cover units at the CT-Prospect ranges from 1 to 7 metres. Detailed structural logging will

be completed for the five core drill holes to allow for an updated interpretatio n of local controls on the

mineralization and to revise targets where aircore anomalies were not fully explained.

NEWLY GENERATED G2 AND Q3 TARGETS

The location of the newly identified G2 and Q3 targets from the aircore drilling that will be followed up in the

planned 2021 exploration program are also indicated on Figure 2. Table 2 below provides drill hole, azimuth, dip,

end of hole depth, and collar co-ordinates for the 2020 core drilling.

- 4 -

FIGURE 2: LOCATION OF CORE DRILL HOLES D3-C1, B2-C1, B2-C2, C4-C1, C5-C1 AIRCORE DRILLING ANOMALIES

AND SATELLITE IMAGE

TABLE 2: 2020 DRILL HOLE, AZIMUTH, DIP, EOH DEPTH, COLLAR CO-ORDINATES

Drill

Hole ID

Azimuth

Degree

Dip

Degree

End of hole Depth

(m)

Easting

(m)

Northing

(m)

Elevation

(m)

Geological

Results

D3-C1 310 -65 165.90 178056 8601638 1178 See Table 1 above

B2-C1

340

-60

141.60 183841 8598480 1197

Did not intersect

significant

mineralization

B2-C2 025 -75 194.90 183677 8598423 1189 See Table 1 above

C4-C1

310

-75

100.70 177916 8596266 1229

Did not intersect

significant

mineralization

C5-C1

312

-60

167.40 177416 8597587 1213

Did not intersect

significant

mineralization

QUALITY ASSURANCE AND QUALITY CONTROL

The results reported here for these core and aircore drilling programs were analyzed by Intertek Genalysis, an

independent and accredited laboratory. Samples were prepared at their facility in Kitwe, Zambia and analytical

work conducted in Australia. The results were determined using multi -acid, near total digest, and analyzed by

Inductively Coupled Plasma (“ICP”) Optical (Atomic) Emission Spectrometry (“OES”). The core and aircore

sampling was conducted with a robust sampling protocol that included the appropriate insertion of standard

reference material, duplicates, and blanks into the sample stream. The aircore ICP results compare consistently

with the pXRF results conducted in the field and support the robust sampling protocol implemented for the field

operations.

- 5 -

Field operations and management have been provide d by Remote Exploration Services (“RES”) an independent

geological consulting and contracting company. The core and aircore drilling was conducted by Blurock Mining

Services, of Kitwe, Zambia.

THE PANGENI COPPER PROJECT

The Pangeni Project is located on the western extension of the Zambian Copperbelt, within the Lufilian Arc,

underlain by Katangan Supergroup metasediments situated unconformably on basement schists and gneisses,

which are covered by a thin veneer of Kalahari sands. The open pit Sentinel Co pper Mine is operated by First

Quantum Minerals Ltd. some 130 kilometres to the northeast of the Pangeni Project. A number of major

international mining companies have identified this region of the Zambian Copperbelt to be prospective for the

discovery of tier one copper mines and are also conducting extensive exploration work in this area.

The Pangeni property is geologically prospective for the following deposit types; Basement-hosted Cu (analogues:

the Lumwana Deposit, Nyungu Prospect), Sediment -hosted s tratiform Cu -Co (analogues: Nchanga, Konkola,

Nkana, and Mufulira Deposits), other Domes Region Deposits e.g. Sentinel, and Kansanshi and DRC Copperbelt

Deposits e.g. Lonshi, Frontier, Kamoa-Kakula).

UPDATE ON THE COMPANY’S ENTRY INTO THE GOLD SECTOR WITH ACQUISITIONS IN JAPAN

On February 17, 2021, the Company reported the proposed transaction to acquire privately owned Kronk

Resources Inc. (“Kronk”) and its wholly o wned subsidiary Kazan Resources, which holds the rights to a highly

prospective portfolio of gold exploration projects in Japan (the “Transaction”).

BeMetals is pleased to report that at its Special General Meeting of shareholders held on March 31, 2021,

shareholders of the C ompany approved the T ransaction with 100% of shareholders that cast their vote having

voted in favour of the T ransaction. The Company has further been advised that shareholders of Kronk have also

approved the T ransaction with 100% of shareholders that cast their vote having voted in favour. Additionally,

BeMetals received conditional approval for the Transaction from the TSX Venture Exchange (“TSXV”) on March

11, 2021 and now waits final approval to proceed with closing. The Company intends to close the transaction and

concurrent private placement from B2Gold Corp., of C$7,500,000 as soon as possible following final approval from

TSXV.

ABOUT BEMETALS CORP.

BeMetals is a precious and base metals exploration and development company focused on becoming a leading

metal producer through the acquisition of quality exploration, development and potentially production stage

projects. The Company is establishing itself in the gold sector with the acquisition of certain exploration projects

in Japan, subject to final TSXV approval to close the transaction. BeMetals is also progressing both its advanced

high-grade, zinc-silver-gold-copper polymetallic underground exploration at the South Mountain Project in Idaho

through a preliminary economic assessment , and its tier- one targeted, Pangeni Copper Exploration Project in

Zambia. Leading BeMetals’ growth strategy is a strong board and management team, founders and si gnificant

shareholders of the Company, who have an extensive proven record of delivering considerable value in the mining

sector through the discovery, construction and operation of mines around the world.

- 6 -

QUALIFIED PERSON

The technical information i n this news release for BeMetals has been reviewed and approved by John Wilton,

CGeol FGS, CEO and President of BeMetals, and a “Qualified Person” as defined under National Instrument 43 -

101.

ON BEHALF OF BEMETALS CORP.

"John Wilton"

John Wilton

President, CEO and Director

For further information about BeMetals please visit our website at www.bemetalscorp.com and sign-up to our

email list to receive timely updates, or contact:

Derek Iwanaka

Vice President, Investor Relations & Corporate Development

Telephone: 604-609-6141

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward -looking statements" and “forward looking information” (as defined under applicable

securities laws), based on management’s best estimates, assumptions and current expectations. Such statements include but

are not limited to, statements with respect to plans for completion of the Transaction and private placement; plans for an

accelerated exploration program in 2021 at the Pangeni Project ; future exploration and development of the South Mountain

Project, the Pangeni project and the Japan properties; and the acquisition of additional base and/or precious metal projects.

Generally, these forward-looking statements can be identified by the use of forward- looking terminology such as "expects",

"expected", "budgeted", "fo recasts", "anticipates" , "plans", "anticipates", "believes", "intends", "estimates", "projects",

"aims", "potential", "goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would",

"may", "can", "could" or "should" occur. These statements should not be read as guarantees of future performance or results.

Such statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance

or achievements to be materially dif ferent from those expressed or implied by such statements, including but not limited to:

receipt of required TSXV approval for the Transaction and fulfilment of all conditions precedent to completion of the

Transaction including closing of the private plac ement, JOGMEC funding its pro -rata portion of exploration programs at the

Pangeni Project, the actual results of exploration activities, the availability of financing and/or cash flow to fund the current

and future plans and expenditures, the ability of the Company to satisfy the conditions of the option agreements for the South

Mountain Project and/or the Pangeni Project, and changes in the world commodity markets or equity markets. Although the

Company has attempted to identify important factors that could cause actual results to differ materially from those contained

in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.

There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. The forward- looking statements and forward looking information are

made as of the date hereof and are qualified in their entirety by this cauti onary statement. The Company disclaims any

obligation to revise or update any such factors or to publicly announce the result of any revisions to any forward- looking

statements or forward looking information contained herein to reflect future results, events or developments, except as

require by law. Accordingly, readers should not place undue reliance on forward- looking statements and information. Please

refer to the Company’s most recent filings under its profile at www.sedar.com for further information respecting the risks

affecting the Company and its business.