Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LTH.V ·

Lithium Ionic Files NI 43-101 Technical Report for Mineral Resource Estimate at Bandeira and Outro Lado, Minas Gerais, Brazil

Resource Estimates Technical Reports (NI 43-101)

Lithium Ionic Files NI 43-101 Technical Report for Mineral Resource Estimate at

Bandeira and Outro Lado, Minas Gerais, Brazil

TORONTO, ON, August 11, 2023 – Lithium Ionic Corp. (TSXV: LTH; OTCQB: LTHCF; FSE:

H3N) (“Lithium Ionic” or the “Company”) reports that it has filed a technical report, in accordance

with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), with

respect to an NI 43-101 mineral resource estimate (the “MRE”) for the 100%-owned Itinga Lithium

Project ( Bandeira and Outro Lado deposits ), located in Minas Gerais, Brazil, titled “Mineral

Resource Estimate for Lithium Ionic, Itinga Project, near Araçuai Village, Minas Gerais State,

Brazil” (the "Technical Report") and dated August 10, 2023 ( with an effective date of June 24,

2023).

On June 27, 2023, the Company announced a maiden NI 43 -101 compliant mineral resource

estimate on its Itinga Lithium Project (the “Project”) in Minas Gerais, Brazil, of 7.57 million tonnes

(“Mt”) grading 1.40% lithium oxide (“Li2O”) of Measured and Indicat ed (“M&I”) and 11.86Mt

grading 1.44% Li2O of Inferred resources. Please refer to the Company’s press release dated

June 27, 2023 and the Technical Report for additional information regarding the MRE and the

Project.

The Technical Report was prepared for Lithium Ionic by SGS Geological Services (“SGS”). The

Qualified Persons responsible for preparing the MRE and the Technical Report are Maxime

Dupéré, P. Geo, and Faisal Sayeed, P. Geo.

The Technical Report can be found on SEDAR (ww w.sedar.com) under Lithium Ionic’s issuer

profile and on the Company's website at www.lithiumionic.com.

About Lithium Ionic Corp.

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in

Brazil. Its flagship Itinga and Salinas projects cover 14,182 hectares in the northeastern part of

Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world- class hard-

rock lithium district. The Itinga Project is situated in the same region as CBL’s Cachoeira lithium

mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo

project, which hosts the largest hard-rock lithium deposit in the Americas.

Qualified Persons

Each of Maxime Dupéré , P. Geo , and Faisal Sayeed, P.Geo, of SGS is a Qualified Person as

defined by NI 43 -101 and has reviewed and approved the technical information and data

regarding the MRE included in this news release. Each of Mr. Dupéré and Mr. Sayeed is

independent of Lithium Ionic. All other scientific and technical information in this news release has

been prepared by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands,

CEO and director of Lithium Ionic, and both are Qualified Persons.

Investor and Media Inquiries:

Blake Hylands

+1 647.316.2500

[email protected]

Cautionary Note Regarding Forward-Looking Statements

This press release contains statements that constitute “forward- statements.” Such forward

looking statements involve known and unknown risks, uncertainties and other factors that may

cause the Company’s actual results, performance or achievements, or developments to differ

materially from the anticipated results, performance or achievements expressed or implied by

such forward-looking statements. Although the Company believes, in light of the experience of its

officers and directors, current conditions and expected future developments and other factors that

have been considered appropriate that the expectations reflected in this forward -looking

information are reasonable, undue reliance should not be placed on them because the Company

can give no assurance that they will prove to be correct. When used in this press release, the

words “estimate”, “project”, “belief”, “anticipate”, “intend”, “expect”, “plan”, “predict”, “may” or

“should” and the negative of these words or such variations thereon or comparable terminology

are intended to identify forward- looking statements and information. The forward -looking

statements and information in this press release include information relating to the prospectivity

of the Company’s mineral properties, the MRE, the Technical Report and the Company’s future

plans. Such statements and information reflect the current view of the Company. Risks and

uncertainties that may cause actual results to differ materially from those contemplated in those

forward-looking statements and information. By their nature, forward-looking statements involve

known and unknown risks, uncertainties and other factors which may cause our actual results,

performance or achievements, or other future events, to be materially different from any future

results, performance or achievements expressed or implied by such forward-looking statements.

The forward-looking information contained in this news release represents the expectations of the

Company as of the date of this news release and, accordingly, is subject to change after such

date. Readers should not place undue importance on forward-looking information and should not

rely upon this information as of any other date. The Company undertakes no obligation to update

these forward-looking statements in the event that management’s beliefs, estimates or opinions,

or other factors, should change.

Information and links in this press release relating to other mineral resource companies are from

their sources believed to be reliable, but that have not been independently verified by the

Company.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the

policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press

release.