Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LTH.V ·

Lithium Ionic Drills 1.77% Li₂O over 16m, including 2.36% Li₂O over 9m at Bandeira, Minas Gerais, Brazil

Drill Results

Lithium Ionic Drills 1.77% Li₂O over 16m, including 2.36% Li₂O over 9m at Bandeira,

Minas Gerais, Brazil

TORONTO, ON, December 3, 2024 – Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE:

H3N) (“Lithium Ionic” or the “Company”) is pleased to announce positive new drill results from its

flagship Bandeira Lithium Project (“Bandeira”, the “Project”) , located within the prolific “Lithium

Valley”, in northern Minas Gerais State, Brazil. These intercepts are part of an ongoing drill

program aimed at increasing mineral resource definition and expanding the mineralized footprint.

These latest results demonstrate strong potential for continued mineral resource growth ,

intersecting meaningful extensions of high-grade mineralized pegmatites.

Bandeira Drill Results Highlights:

Hole ITDD-24-280:

▪ 16.00m grading 1.77% Li₂O from 137.41m, incl. 9.00m grading 2.36% Li₂O

Hole ITDD-24-268:

▪ 19.60m grading 1.33% Li₂O from 83.74 meters, incl. 8.47m grading 1.81% Li₂O

Hole ITDD-24-283:

▪ 14.00m grading 1.81% Li₂O from 105.10m

Hole ITDD-24-285 (See section in Figures 2 and core photo in Figure 3):

▪ 14.00m grading 1.54% Li₂O from 157.87m

Hole ITDD-24-282:

▪ 14.00m grading 1.30% Li₂O from 138.05m

▪ 11.07m over 1.34% Li₂O from 200.75m

Hole ITDD-24-270:

▪ 6.67m grading 2.11% Li₂O from 70.65m

▪ 12.00m grading 1.09% Li₂O from 110.03m

Hole ITDD-24-290:

▪ 7.78m grading 1.58% Li₂O from 176.45m

Hole ITDD-24-275:

▪ 8.96m grading 1.32% Li₂O from 206.21m

Hole ITDD-24-269:

▪ 4.75m grading 2.28% Li₂O from 88.72m

Blake Hylands, P.Geo., CEO of Lithium Ionic, commented, “These latest results from Bandeira

underscore the continued growth potential of our flagship Project, with well-mineralized pegmatite

extensions and entirely new zones into previously untested areas. This new data not only

reinforces our confidence in the resource but increases our near surface resources which

presents optimization opportunities with strengthening and expanding the already robust

Bandeira mining plan . With key milestones on the horizon, we remain focused on advancing

Lithium Ionic toward becoming Brazil’s next major lithium producer.”

Bandeira Project Overview & Feasibility Study Highlights

The Bandeira property spans 175 hectares in northeastern Minas Gerais State, Brazil,

representing just ~1% of Lithium Ionic’s large ~17,000-hectare land package. Despite this

footprint, Bandeira accounts for ~70% of the 60.1Mt * global lithium mineral resource estimate,

making it the cornerstone of the Company’s development strategy (see press release dated April

12, 2024).

In May 2024, Lithium Ionic released a robust Feasibility Study for Bandeira, which outlined a 14-

year mine life producing an average of 178,000 tonnes of high -quality 5.5% Li ₂O spodumene

concentrate annually. The study demonstrated a low CAPEX of US$266 million, delivering a post-

tax NPV of US$1.3 billion and an IRR of 40%.

The Feasibility Study underscored the low-cost nature of Bandeira, with on-site operating costs

estimated at US$444/t, and an all-in delivered cost of approximately US$ 557/t (CIF, Shanghai),

positioning it as a competitive operation despite current lithium price environments. The spot price

for s podumene concentrate (min. 6% Li 2O; CIF China) is currently approximately 8 40$/t

(Fastmarkets’ Battery Raw Material Price Update , as of Dec. 2, 2024) . These figures not only

reflect the Project’s efficient design but also the cost efficiencies that result from the region’s

excellent infrastructure, including low -cost hydroelectric power, access to dependable water

resources, well-established transport infrastructure, and access to foreign markets via nearby

ports. These advantages collectively enhance the Project’s cost efficiency and its resilience to

fluctuating market conditions.

Permitting & Development Progress

The Company’s Licença Ambiental Concomitante (LAC) application, submitted in late 2023, is

currently in the final stages of review by the Minas Gerais State Secretariat for the Environment

and Sustainable Development (SEMAD). Final information requests have been submitted with an

approval review currently being scheduled.

On October 22, 2024 , Lithium Ionic announced the launch of Engineering, Procurement, and

Construction Management (“EPCM”) services in partnership with Hatch and Reta Engenharia, an

important milestone marking the transition to the construction and development phase of the

Project.

On November 27, 2024, the Company announced that it secured a non-binding Letter of Interest

(“LOI”) from the Export-Import Bank of the United States (“EXIM”) to provide up to US$266 million

in debt financing for Bandeira; a major achievement that provides a clear pathway to fund the

development of the Project.

*See NI 43-101 compliant technical report related to the Bandeira Bandeira MRE titled “NI 43 -101 Technical Report –

Mineral Resource Update on Bandeira Project, Araçuaí and Itinga, Minas Gerais State, Brazil” (effective date of March

5, 2024; QP: Leonardo Soares of GE21); See NI 43 -101 compliant technical report related to the Salinas MRE titled

“Independent Technical Report on Mineral Resources Estimate” (effective date of January 4, 2024; QP: Leonardo

Soares, P.Geo., M.Sc., of GE21); and the NI 43-101 compliant technical reports related to the Outro Lado deposit titled

“Mineral Resource Estimate for Lithium Ionic, Itinga Project” (effective date of June 24, 2023; authored by Maxime

Dupéré, B. Sc., P.Geo. and Faisal Sayeed, B. Sc., P.Geo).

Figure 1. Plan map of Bandeira showing new drill intercepts

Figure 2. Section LT 600 NE, Showing New Drill Holes ITDD-24-277, ITDD-24-283, ITDD-24-

285 and ITDD-24-290

Figure 3. Core Photos, Hole ITDD-24-285

Table 1. Bandeira Drill Results

Hole ID Az Dip From To Metres Li2O (%)

ITDD-24-267 150 -62 35.48 39.00 3.52 0.97

ITDD-24-268

0 -90

83.74 103.34 19.60 1.33

including 83.74 90.63 6.89 1.37

including 94.87 103.34 8.47 1.81

and 124.62 126.57 1.95 2.37

and 155.94 159.57 3.63 0.91

and 165.32 167.32 2.00 1.10

and 176.52 179.57 3.05 0.73

ITDD-24-269 150 -64 88.72 93.47 4.75 2.28

ITDD-24-270

0 -90

70.65 77.32 6.67 2.11

and 110.03 122.03 12.00 1.09

including 110.03 115.03 5.00 1.59

and 142.75 146.48 3.73 2.01

ITDD-24-271 0 -90 70.38 73.38 3.00 0.89

ITDD-24-272 150 -60 67.38 70.00 2.62 1.62

ITDD-24-273 0 -90 141.35 142.71 1.36 0.86

ITDD-24-274 150 -85 185.82 188.21 2.39 0.74

ITDD-24-275 150 -65 156.38 159.55 3.17 0.74

and 206.21 215.17 8.96 1.32

including 206.21 210.09 3.88 1.07

including 213.70 215.17 1.47 2.49

ITDD-24-277

0 -90

26.73 33.73 7.00 0.83

and 193.17 194.64 1.47 0.77

and 206.04 211.57 5.53 0.99

ITDD-24-278 330 -55 101.24 104.96 3.72 1.83

ITDD-24-279 330 -55 96.09 99.46 3.37 0.94

ITDD-24-280 330 -70 137.41 153.41 16.00 1.77

including 140.41 149.41 9.00 2.36

ITDD-24-281 0 -90 NSR

ITDD-24-282

0 -90

85.72 89.24 3.52 1.60

and 138.05 152.05 14.00 1.30

and 187.84 189.40 1.56 1.25

and 200.75 211.82 11.07 1.34

and 250.50 252.56 2.06 0.50

and 264.64 269.20 4.56 1.79

and 283.28 286.21 2.93 0.98

ITDD-24-283

330 -75

105.10 119.10 14.00 1.81

and 135.79 138.79 3.00 1.80

and 146.03 149.28 3.25 1.35

and 193.34 200.02 6.68 0.62

and 209.93 211.33 1.40 1.28

and 218.85 222.81 3.96 0.79

ITDD-24-285 0 -90 115.78 119.50 3.72 0.81

and 157.87 171.87 14.00 1.54

ITDD-24-286 330 -75 25.25 31.25 6.00 1.11

ITDD-24-287 150 -55 124.47 127.47 3.00 1.31

ITDD-24-289 0 -90 77.14 79.77 2.63 1.42

ITDD-24-290 150 -80 108.26 110.26 2.00 0.96

and 176.45 184.23 7.78 1.58

*Assays for ITDD-24-276 reported in October; ITDD-24-281 returned no significant results; ITDD-24-284

and ITDD-24-288 were not sampled.

On behalf of the Board of Directors of Lithium Ionic Corp.

Blake Hylands

Chief Executive Officer, Director

About Lithium Ionic Corp.

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in

Brazil. Its Itinga and Salinas group of properties cover ~17,000 hectares in the northeastern part

of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-

rock lithium district. Its Feasibility-stage Bandeira Project is situated in the same region as CBL’s

Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium

Corp.’s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

Quality Assurance and Control

During the drill program, assay samples were taken from NQ core and sawed in half. One -half

was sent for assaying at SGS Laboratory, a certified independent commercial laboratory, and the

other half was retained for results, cross checks, and future reference. A strict QA/QC program

was applied to all samples. Every sample was processed with Drying, crushing from 75% to 3

mm, homogenization, quartering in Jones, spraying 250 to 300 g of sample in steel mill 95% to

150. SGS laboratory carried out multi-element analysis for ICP90A analysis.

Qualified Persons

The technical information in this news release has been prepared by Carlos Costa, Vice President

Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, who are both

“qualified person s” as defined in NI 43 -101. Mr. Costa and Mr. Hylands have both read and

approved the content in this news release.

Investor and Media Inquiries:

+1 647.316.2500

[email protected]

Cautionary Note Regarding Forward-Looking Statements

This press release contains statements that constitute “forward -statements.” Such forward

looking statements involve known and unknown risks, uncertainties and other factors that may

cause the Company’s actual results, performance or achievements, or devel opments to differ

materially from the anticipated results, performance or achievements expressed or implied by

such forward-looking statements. Although the Company believes, in light of the experience of its

officers and directors, current conditions and expected future developments and other factors that

have been considered appropriate that the expectations reflected in this forward -looking

information are reasonable, undue reliance should not be placed on them because the Company

can give no assurance t hat they will prove to be correct. When used in this press release, the

words “estimate”, “project”, “belief”, “anticipate”, “intend”, “expect”, “plan”, “predict”, “may” or

“should” and the negative of these words or such variations thereon or comparable t erminology

are intended to identify forward -looking statements and information. The forward -looking

statements and information in this press release include information relating to the mineralization

and prospectivity of the Company’s mineral properties, the economic viability of Bandeira, the

financing of the Project, the development of the Company’s mineral properties, the Company’s

exploration program and other mining projects and prospects thereof , the Company’s ability to

obtain the requisite permitting and approvals and the timing thereof, the Company’s ability to

increase the mineral resource estimates at its projects and the Company’s future plans . Such

statements and information reflect the current view of the Company. Risks and uncertainties that

may cause actual results to differ materially from those contempl ated in those forward -looking

statements and information. By their nature, forward -looking statements involve known and

unknown risks, uncertainties and other factors which may cause our actual results, performance

or achievements, or other future events, to be materially different from any future results,

performance or achievements expressed or implied by such forward -looking statements. The

forward-looking information contained in this news release represents the expectations of the

Company as of the dat e of this news release and, accordingly, is subject to change after such

date. Readers should not place undue importance on forward-looking information and should not

rely upon this information as of any other date. The Company undertakes no obligation to update

these forward-looking statements in the event that management’s beliefs, estimates or opinions,

or other factors, should change.

Information and links in this press release relating to other mineral resource companies are from

their sources believed to be reliable, but that have not been independently verified by the

Company.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the

policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press

release.