Lithium Ionic Announces PEA and Expanded Mineral Resource Estimate for Bandeira; Post-tax NPV8% US$1.6 Billion & IRR of 121%

Resource Estimates Economic Studies

Lithium Ionic Announces PEA and Expanded Mineral Resource Estimate for

Bandeira; Post-tax NPV8% US$1.6 Billion & IRR of 121%

TORONTO, ON, October 19, 2023 – Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE:

H3N) (“Lithium Ionic” or the “Company ”) is pleased to report the results of the Preliminary

Economic Assessment (“PEA”) and the updated Mineral Resource Estimate ("MRE") for its wholly

owned Bandeira project (“Bandeira” or the “Project”) located in Minas Gerais, Brazil.

The PEA was completed by independent Brazilian consultancy, GE21 Consultoria Mineral Ltda

("GE21"), with support of SNC Lavalin, and indicates that Bandeira has the potential to be a viable

and highly economic mining project and a substantial and long-life producer of low- cost

spodumene concentrate.

Bandeira PEA - Production & Economic Highlights ($USD unless otherwise stated):

 Post-tax Net Present Value (“NPV”)8% of $1.6 billion (approximately C$2.2 billion)

 Post-tax Internal Rate of Return (“IRR”) of 121%

 Underground mine scenario processing 1.3Mtpa of ore over a 20-year mine life

 After-tax payback of 14 months

 Avg. LOM annual production of 217,700t of high-quality spodumene concentrate at

5.5% Li2O (“SC5.5”) equivalent (187,230 tpa SC5.5, in addition to 56,860 tpa of

spodumene tails concentrate at 3% Li2O, or “SC3”)

 Total capital expenditure (“CAPEX”) of $233 million (including a 25% contingency)

 Pre-tax annual average free cash flow of $243 million

 All-in LOM operating costs (“OPEX”) of $349/t of spodumene concentrate SC5.5

Bandeira Updated MRE Highlights:

 Measured & Indicated: 13 .72Mt at 1. 40% Li20 (474, 892t LCE) representing a 196%

increase in tonnes compared to the June 2023 MRE for Bandeira of 4.63Mt at 1.35%

Li20 (154,198t LCE)

 Inferred: 15.79Mt at 1.34% Li20 (523,118t LCE)

Commenting on the PEA, Blake Hylands, P.Geo, CEO of Lithium Ionic, “We congratulate our

team on advancing the Project to this stage in a short time span. As a Company, we are focused

on being the next significant Brazilian lithium producer and this is reflected in the approach we

have taken. Commencing with a highly attractive underground project will result in significantly

less surface disturbance and the experience of CBL on the adjacent mine site provides a proven

production model for developing the mining operation. The Company has a highly experienced

team in Brazil that has taken numerous projects through the permitting and development process

and as such the Project is well advanced in this regard. We believe the deliverables in this PEA

are achievable.”

Blake Hylands, P.Geo., continued, "The robust results of our PEA marks a major de -risking

milestone towards our goal of becoming a near -term supplier of high- quality spodumene

concentrate to the global lithium and electric vehicle supply chains. The Bandeira deposit has

demonstrated its technical simplicity and remarkable economic viability, placing it among the

lowest-cost spodumene concentrate producers globally. Furthermore, this PEA showcases an

impressive 20-year mine life from just one of our deposits . The Bandeira project will serve as a

solid foundation for further growth as we continue to expand both the mineral resources and

potential production scale through ongoing drilling an d exploration in the region. We are rapidly

advancing Bandeira through the next phases of development , with a Definitive Feasibility and

Environmental Impact Assessment expected by the end of 2023, paving the way for the initiation

of the environmental permitting process. As a proposed underground operation, Bandeira benefits

from a minimal environmental footprint and an expected accelerated permitting timeline.”

Helio Diniz, President of Lithium Ionic, stated, “We believe that the best approach for all of our

stakeholders is to develop a significant producing operation in the shortest possible time frame.

We will continue to expand the resources and develop our o ther targets, which will represent

future expansions to support what we believe will be a multi-generational production center.”

Bandeira Project PEA Overview

The Bandeira Project covers 175 hectares within Lithium Ionic’s large land package of 14,182

hectares and is located between the towns of Araçuaí and Itinga within Brazil’s “Lithium Valley” -

a hard rock lithium district that is quickly emerging as an important global lithium producer (see

Figure 1).

Table 1. Bandeira Project PEA Highlights ($USD unless otherwise stated)

Project Economics

Post - Ta x NPV8 $1.6 billion

Post - Ta x I RR 121%

Pre - Ta x NPV8 $2.3 billion

Pre - Ta x I RR 163%

Annual Revenue – Average $337 million

Annual Free Cash Flow $243 million

Payback 14 months

Economic Assumptions & Parameters

SPO 5.5% Li2O Price, CIF China $1,859/t

SPO 3.0% Li2O Price, CIF China $865/t

Exchange rate US$5.00 /R$

Discount Rate 8%

Production Profile

T otal Project Life (LOM) 20 years

T otal LOM production (ore mined) 22.9 Mt

Nominal Plant Capacity 1.3 Mtpa

Average plant throughput 1.26 Mtpa

Run-of-Mine grade, Li2O (ore diluted) 1.23%

Run-of-Mine underground mine dilution 16.8%

Waste generation Average 439 ktpa

SPO Annual Production @ 5,5% Li2O 187 ktpa

SPO Annual Production @ 3,0% Li2O 56 ktpa

SPO Annual Production @ 5.5% Li2O Equivalent 218 ktpa

SPO 5,5% Li2O metallurgical recovery 67.0%

SPO 3,0% Li2O metallurgical recovery 10.7%

SPO 5,5% Li2O mass recovery 15.2%

SPO 3,0% Li2O mass recovery 4.5%

Project Capital Costs

Mine (Development + Equipment’s + Pre-Production) $72.5 million

Plant $80.5 million

Environmental $2.9 million

Engineering Services $20.0 million

General Infrastructure & Others $10.3 million

Contingency (25%) $46.6 million

T otal Capital Cost Estimate $232.8 million

SUDENE Incentive tax benefit over first 10 years 75%

Operating Costs (OPEX)

Operating costs (based on ore processed) $61/t ore

Mining $45/ t ore

Processing + Tailings handling $12/ t ore

SG&A $4/t ore

Operating costs (based on SPO 5.5 concentrate produced) $349/t SPO 5.5E

Mining $258/t SPO 5.5E

Processing + Tailings handling $68/t SPO 5.5E

SG&A $23/t SPO 5.5E

Transportation costs to customer destination

(Mine in Itinga - Araçuaí to Shanghai Port, China) $120/t SPO

Figure 1. Bandeira Project Location

Figure 2. Post-Tax NPV8% Price Sensitivity Analysis

Mining

The Bandeira project engineering design contemplates dual underground mining operations. The

primary orebodies, accounting for approximately 90% of the deposit, are proposed to be extracted

using a bottom-up “sublevel stoping” method (Bandeira Sublevel M ine, “ BSL mine”).

Simultaneously, the secondary southeast orebody, comprising approximately 1.5 million tonnes,

is expected to be mined using “room -and-pillar” technique (Bandeira Room and Pillar , “BRP

mine”).

The BSL mine has been planned with two declines, extending along a NE/SW mineralized trend

spanning 1.0 km. It is divided into 12 panels, each measuring 55 meters, and consists of two

sublevels (see Figure 3).

The BRP mine features a single panel with approximate dimensions of 380 meters in length, 330

meters in width, and 10 meters in height. Access to the ore chamber will be provided through five

crosscuts originating from the southern decline. Once fully operational, the BSL and BRP mines

are expected to achieve a combined production of approximately 1.3 million tonnes per annum.

Figure 4 shows the annual plant feed along with Li2O grade.

Figure 3. Proposed Project Layout and Infrastructure

Figure 4. PEA Mine Plan and Schedule with Li2O, %

Mineral Processing

The mineral processing flowsheet is structured around a two-stage crushing circuit (comprising a

Jaw crusher and Gyratory Cone crusher), ore size classification, the implementation of an ore

sorter for coarse and medium materials, and the utilization of DMS (Dense Media Separation) for

coarse and medium materials. Additionally, fines are subjected to gravity concentration with

spirals. For a visual representation of the process, please refer to Figure 5, while Table 1 provides

the specific design criteria for mineral processing.

The underground mine is anticipated to yield ore with an average Li 2O grade of 1.23% over the

Life of Mine (LOM), accounting for dilution at 16.8%. The ore sorting process will effectively purify

the ore by removing undesirable dilution and non- lithium-bearing minerals like albite, feldspar,

and quartz. This enrichment process will improve the lithium oxide grade to approximately 1.50%,

ensuring a higher feed for the DMS I and II units. Based on the preliminary testwork program,

Li2O recovery is projected to reach 67%, with an additional 10.7% achieved through gravity

concentration in the fines fraction.

Figure 5. Block diagram for the Bandeira Process Flowsheet

Updated Mineral Resource Estimate for Bandeira

The PEA is based on a n updated MRE for the Bandeira project summarized in Table 2. The

Bandeira MRE contains Measured and Indicated (“M&I”) resources of 13.72Mt grading 1.40%

Li2O, containing 474, 892 tonnes of Lithium Carbonate Equivalent (“LCE”), the benchmark

equivalent raw material used in the lithium industry, in addition to Inferred resources of 15.79Mt

grading 1.34% Li2O, or 523,118 tonnes of LCE.

The updated MRE for Bandeira is based on 204 diamond drill holes conducted on the Bandeira

property until August 30, 2023. This compares to drill data from 120 holes in the previous MRE

for Bandeira announced on June 27, 2023. This additional drilling significantly expanded the MRE,

with the tonnes in the Indicated category increasing by 196% compared to the previous estimate.

Table 2. Bandeira Mineral Resource Estimates (base case cut-off grade of 0.5 % Li2O)

Category Resource (tonnes) Grade

(% Li2O) Contained LCE (t)

Measured 2,000,000 1.40 69,226

Indicated 11,720,000 1.40 405,666

Measured + Indicated 13,720,000 1.40 474,892

Inferred 15,790,000 1.34 523,118

Notes related to the Mineral Resource Estimate:

1. The spodumene pegmatite domains were modeled using composites with Li2O grades greater than

0.3%

2. The mineral resource estimates were prepared in accordance with the CIM Standards, and the CIM

Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters

appropriate to the deposit.

3. Mineral Resources are not ore reserves and are not demonstrably economically recoverable.

4. Grades reported using dry density.

5. The effective date of the MRE was October 11, 2023.

6. The MRE numbers provided have been rounded to the estimate relative precision. Values cannot

be added due to rounding.

7. The MRE is delimited by Lithium Ionic Bandeira Target Claims (ANM).

8. The MRE was estimated using ordinary kriging in 12m x 12m x 4m blocks.

9. The MRE report table was produced in Leapfrog Geo software.

10. The reported MRE only contains fresh rock domains.

11. The MRE was restricted by grade shell using 0.5% Li2O cut-off.

The complete NI 43 -101 technical report associated with the PEA and updated MRE (the

“Technical Report”) will be available on SEDAR+ at www.sedarplus.ca under the Company’s

issuer profile, as well as the Company’s website at www.lithiumionic.com within 45 calendar days.

The Preliminary Economic Assessment is considered preliminary in nature and includes Inferred

Mineral Resources that are considered too speculative, geologically, to have the economic

considerations applied that would enable classification as Mineral Reserves. There is no certainty

that the conclusions within the PEA will be realized. The PEA is based on the material

assumptions outlined in this document. These include assumptions about the availability of

funding. While the Company considers all of the material assumptions to be based on reasonable

grounds, there is no certainty that they will prove to be correct or that the range of outcomes

indicated by the PEA can be achieved.

No mineral reserves have been estimated for the Project. Mineral Resources are not Mineral

Reserves and do not have demonstrated economic viability.

About Lithium Ionic Corp.

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in

Brazil. Its flagship Itinga and Salinas projects cover 14,182 hectares in the northeastern part of

Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world- class hard-

rock lithium district. The Itinga Project is situated in the same region as CBL’s Cachoeira lithium

mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo

project, which hosts the largest hard-rock lithium deposit in the Americas.

Qualified Persons

The Technical information in this news release has been reviewed and approved by Independent

Qualified Persons as defined in NI 43- 101, Carlos José Evangelista Silva (MAIG Membership

Number 7868) for the MRE, and Guilherme Gomides Ferreira (MAIG Membership Number: 7586)

for the PEA, both from GE21.