Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LPK.V ·

US$1.25 for zinc (“Zn”), and US$1.05 for lead (“Pb”), with assumed mill recoveries of 85% for Au, 80% for Ag, 82 % for Cu and Pb, and 77% for Zn. Lupaka Samples 9.22 g/t Au-Eq. Over A Strike Length of 130 m from the Newly Developed 3430 Sublevel at Invicta

Drill Results Sampling & Geoscience Results

* Au-Eq. calculations are based on US$1250 for gold (“Au”), US$17.00 for silver (“Ag”), US$3.00 for copper (“Cu”),

US$1.25 for zinc (“Zn”), and US$1.05 for lead (“Pb”), with assumed mill recoveries of 85% for Au, 80% for Ag, 82 % for

Cu and Pb, and 77% for Zn.

Lupaka Samples 9.22 g/t Au-Eq. Over A Strike Length of 130 m

from the Newly Developed 3430 Sublevel at Invicta

VANCOUVER, BRITISH COLUMBIA, June 07, 2018 -- Lupaka Gold Corp. (" Lupaka

Gold" or the “ Company") (TSX-V: LPK, FRA: LQP) is pleased to announce the results

from a recent systematic underground sampling program on the newly developed 3430

production sublevel, located 30 metres up-dip of the 3400 Level, at the Company’s 100%

owned Invicta Gold Development Project (“Invicta Project” or “Invicta”).

Sampling Program Highlights:

• Sample assay values from the Atenea vein on the 3430 sublevel averaged

9.22 grams per tonne (“g/t”) gold equivalent1 (“Au-Eq.”) over a strike length

of 130 metres (“m”), with an average sample width of 4.2 m

• Average grade of 9.22 g/t Au-Eq. is higher than the estimated grade of 8.12

g/t Au-Eq. within the block model of the sampled area on the 3430 sublevel

and appears consistent with the 9.86 g/t Au-Eq. sampled on the 3400 Level

(see news release dated March 15, 2018)

• Geological mapping shows that the hanging wall split has merged with the

footwall zone on the 3430 sublevel, which could potentially result in more

efficient mining and lower dilution than the assumptions in the PEA

• Development on the 3430 sublevel, including the crosscuts, plus geological

mapping and sample assay values demonstrate horizontal widths ranging

from 4 m up to 12 m for the Atenea vein on the 3430 sublevel

Development Highlights:

• Approximately 235 m of horizontal development, including 5 cross-cuts, has

been completed on the 3430 sublevel, ending in mineralization on the

eastern face

• Vent raise from 3400 Level to 3430 sublevel has been completed ventilation

circuit established

“Results from the underground sampling program on the newly constructed 3430 sublevel

are very encouraging and demonstrates the continuity of the Atenea mineralization both

up-dip from the 3400 Level and along strike. Having learned the hanging wall split merges

with the footwall zone is an important geological discovery and provides an opportunity to

improve on our conceptual mine development costs and dilution assumptions in the PEA.

With sampled grades from the 3430 sublevel coming in higher than within our Mineral

Resource block model from the same area , we remain well positioned for the

commencement of mine production in the third quarter of this year.”

Will Ansley, President and CEO of Lupaka

2

Development of 3430 Sublevel & Sampling Program Results

Development on the newly constructed 3430 sublevel was initiated in preparation for the

first block of mining production (located between the 3400 Level and the 3430 sublevel),

scheduled to commence in the third quarter of 2018 (“ Q3 2018”). Subsequent to cross-

cutting the Atenea vein, lateral development preceded southeast and southwest over

approximately 235 m, including the creation of four additional cross-cuts (see plan in

Appendix A) , ending in mineralization on the eastern face. The 3430 sublevel

development also provided an opportunity to demonstrate the vertical and horizontal

continuity of the Atenea vein and to compare the sampled grades with the current Mineral

Resource block model, as well as the mineralization contained on the 3400 Level, located

30 metres below.

Consistent with the comprehensive sampling program undertaken on the 3400 Level (see

plan shown in Appendix B), underground channel sampling was systematically performed

on the 3430 sublevel over the width of the development (3.5 m wide by 3.0 metres wide)

at intervals of approximately every 5 m (consistent with the size of the Mineral Resource

block model), as well as over the five cross-cuts.

The polymetallic mineralization within the At enea vein is hosted by structurally defined

components which were mapped and sampled . Summarized assay sample results are

tabulated and presented in Table 1, and a detailed sampling map is provided in Appendix

A.

Table 1: Average Sampling Results from 3430 Sublevel Atenea Vein Sampling Program

3430 Level Length

Metres

Width

Metres

Au

g/t

Ag

g/t

Cu

%

Pb

%

Zn

%

Au-Eq.

g/t

Atenea Vein 130.00 4.2 4.31 59.21 1.68 1.33 1.26 9.22

Overall, the sample results were found to be consistent with sample results from

the 3400 Level located 30 m below, however, the average sampled grade of 9.22 g/t

Au-Eq. is higher than the estimated grade of 8. 12 g/t Au-Eq. contained within the

Mineral Resource block model from the sampled area. Importantly, the geological

mapping on the 3430 sublevel showed that the hanging wall split vein, as seen on

the 3400 Level, has merged with the footwall zone. The continuation of the hanging

wall split and the footwall zone through the 3430 sublevel was assumed in the

Mineral Resource model and in the PEA conceptual mine plan. The merger of these

zones cou ld potentially result in more efficient mining and lower dilution upon

extraction of the mineralized material (due to the absence of non -mineralized

material in between the two zones).

Although the average sampled width of the Atenea vein on the 3430 sublevel was 4.2 m,

compared to approximately 6.0 m on the 3400 Level, sampling on the 3430 sublevel was

restricted by smaller development headings (3.5 m wide), as well as fewer cross-cuts (5)

compared with the 3400 Level (7). Geological mapping and sampling over the 5 cross -

cuts on the 3430 sublevel demonstrates an estimated horizontal width of the Atenea vein

ranging from 4 m up to 12 m. It is anticipated that the average horizontal width on 3430

sublevel will be in-line, or possibly exceed, the average conceptual mining width of 8.0 m,

as estimated in the PEA conceptual mine plan.

Summary results obtained from 205 samples taken in the drift and crosscuts, over spacing

of approximately every 5 m, are tabulated in Table 2.

3

Table 2: Summary Assays from 3430 Level – Atenea Vein

Width

metres

Au Ag Cu Pb Zn Au-Eq.

g/t g/t % % % g/t

1.70 0.47 12.53 0.34 1.56 1.01 2.64

2.50 34.79 42.40 0.92 1.94 2.22 39.19

2.40 1.11 16.96 0.79 0.52 0.38 3.09

3.35 0.87 9.51 0.58 0.21 0.28 2.19

3.45 2.02 12.57 0.60 0.22 0.46 3.54

3.30 2.57 18.52 0.91 0.06 0.08 4.34

3.40 1.46 73.82 1.90 0.15 0.25 5.65

3.30 1.36 17.50 0.87 0.16 0.06 3.09

5.90 2.57 37.47 1.78 0.14 0.09 6.01

5.12 2.96 22.36 0.75 1.00 1.51 5.89

4.40 0.92 38.95 1.11 0.70 0.94 4.12

4.00 0.72 47.38 1.94 3.07 2.41 7.56

3.90 0.60 55.05 1.66 4.02 3.64 8.33

4.00 2.87 37.50 1.55 1.17 1.03 7.06

3.50 6.46 42.29 1.21 1.02 0.51 9.80

10.50 4.62 47.24 1.56 1.80 1.95 9.86

3.30 1.52 25.73 0.83 0.60 0.66 3.90

3.50 1.16 39.77 1.39 2.12 3.49 7.13

3.20 1.64 62.88 1.94 3.45 3.41 9.47

5.75 3.78 59.04 1.93 2.93 4.10 11.68

3.50 2.15 55.60 1.78 3.29 2.69 9.12

7.30 4.24 48.38 1.49 1.58 1.78 9.16

3.42 4.89 42.19 1.61 1.56 2.26 10.21

4.40 5.21 39.09 1.04 1.68 1.83 9.39

3.40 3.81 63.06 1.90 1.17 0.78 8.76

3.46 4.15 54.99 2.47 0.97 0.85 9.82

3.50 5.06 46.74 0.93 0.70 1.17 8.21

9.30 5.45 95.27 2.41 0.35 0.26 10.85

3.30 10.40 149.88 3.56 1.00 0.56 18.86

9.40 3.85 97.96 2.74 1.39 0.74 10.66

4.10 3.45 76.80 1.38 1.10 0.58 7.59

3.80 7.99 146.11 3.31 1.61 0.84 16.51

3.80 3.25 50.39 1.41 1.02 0.62 7.07

3.35 5.17 77.46 2.04 1.16 1.13 10.72

3.30 3.34 149.27 2.67 2.09 1.17 11.35

2.40 19.81 94.92 2.25 0.84 0.29 25.23

3.50 7.93 105.64 2.36 1.10 0.35 13.86

3.30 1.06 56.58 0.66 0.52 0.02 3.14

Weighted

Averages 4.20 4.31 59.21 1.68 1.33 1.26 9.22

Total Length

(metres) 130

4

Project Background

Lupaka’s Invicta Gold Project is a polymetallic development project located approximately

120 kilometres north of Lima, Peru. On May 11, 2018 a PEA was completed on the project

by SRK Consulting (Canada) Inc. which evaluated the economic potential of the

underground extraction of the Indicated and Inferred Mineral Resources from the Atenea

Vein close to the existing 3400 Level adit (up to 130 m above the 3400 Level) utilizing a

sublevel long -hole, open stoping mining method supported by initial toll treatment

processing options. Highlights of the PEA are summarized below:

• Mineral Resource Statement of 3.0 million tonnes of Indicated Mineral

Resources at 5.78 g/t Au-Eq. using a 3. 0 g/t Au-Eq. cut-off, and 0.6 million

tonnes of Inferred Mineral Resources at 5.29 g/t Au-Eq.

• Initial 6-year mine plan (underground) designed on a portion of th e Mineral

Resource utilizing the existing infrastructure and minimizing capital start-up

costs

• Sublevel open stope mining producing ~ 670,000 tonnes of mineralized

material at 8.6 g/t Au -Eq.* with production of ~ 185,000 Au -Eq. oz (within

initial 6-year mine plan)

• Average annual pre-tax cash flows of US$10.2 million, average annual after-

tax cash flow of US$8.2 million

• Annual production of 33,700 Au-Eq. oz, during steady state

• Annual payable metal of 26,700 Au-Eq. oz, during steady state

• All-in Sustaining Costs of US$575 Au -Eq. oz over initial 6 -year mine life,

average annual pre-tax operating profit of US$12.3 million

• Pre-tax 5% NPV of US$53.6 million

• Low capital investment: US$4.3 million in pre -production capital with a

payback of less than one year

The PEA considers only part of the reported Mineral Resource (the Atenea Vein close to

existing infrastructure) with the objective of generating positive cash flow from a low-cost

operation while simultaneously re -investing in and further evaluating the deposit to

potentially expand production in the future.

Quality Control and Assurance

The analyses for this sampling campaign were carried out by ALS, an accredited

laboratory, in Lima, Peru, exercising a thorough Quality Assurance and Control program

(QA/QC). As part of QA/QC protocol, duplicates, standards and blanks were inserted into

the sample processing stream. The sample locations were mapp ed, surveyed and

photographed for reference. Individual sample channels vary between 0. 2 to 2.5 metres

wide. Samples were bagged, sealed and delivered to the ALS sample preparation facility

in Lima , Peru. Gold was assayed by a 50-gram fire assay and re -assayed for the

overlimits, with an AAS finish. All ALS labs are ISO 9000 registered.

Technical Report

Further information about the PEA and the resource estimate referenced in this news

release, including data verification, key assumptions, parameters, risks and other factors,

are provided in the technical report prepared following Canadian Securities Administrators’

National Instrument (NI) 43-101 and Form 43 -101F1 guidelines for the Invicta Project

5

dated May 11, 2018 , and is available under the Company profile on SEDAR

(www.sedar.com).

Neither the TSX Venture Exchange nor its Regulation Service Provider (as the term

is defined in the policies of the TSX Venture Exchange) accepts responsibi lity for

the adequacy of this news release.

About Lupaka Gold

Lupaka is an active Canadian-based company focused on creating shareholder value

through discoveries and strategic development of its assets in some of the most prolific

mining regions of Peru.

Invicta Gold Development Project – 100% owned, the Company’s flagship project is an

advanced stage gold-copper polymetallic underground deposit located approximately 120

kilometres north of Lima. Over $12 million of capital has been spent by previous owners

on development and infrastructure at Invicta , and m anagement expects to commence

potential production in the second half of 2018 by using third-party mining contractors and

utilizing the existing adit and workings. The Invicta project is fully permitted and community

agreements are in place.

The potential underground operation will be focused on underground extraction of

Indicated Mineral Resources and Inferred Mineral Resources from the Atenea vein within

close proximity to the existing 3400 Level adit (up to 130 metres above the 3400 Level).

Invicta’s approved EIA allows for mine production of up to 1,000 tpd, although the current

conceptual mining plan is targeting 350 tpd.

Cautionary Note Regarding the Invicta Production Decision

The PEA is preliminary in nature and includes Inferred Mineral Resources that are

considered too speculative geologically to have the economic considerations applied to

them that would enable them to be categorized as mineral reserves and there is no

certainty that the PEA will be realized. Mineral resources that are not mineral reserves do

not have demonstrated economic viability. The estimate of mineral resources may be

materially affected by envi ronmental, permitting, legal, title, taxation, socio -political,

marketing, or other relevant issues. The quantity and grade of reported inferred resources

referred to in the PEA are uncertain in nature and there has been insufficient exploration

to define these inferred resources as an indicated or measured mineral resource category.

It is important to note while a mine production decision has been made by the Company,

that the information provided in this news release is preliminary in nature. There is no

certainty that a potential mine will be realized. A mine production decision that is not based

on a feasibility study demonstrating economic and technical viability does not provide

adequate disclosure of the increased uncertainty and specific economic an d technical

risks of failure associated with such a production decision.

About SRK Consulting (Canada) Inc.

SRK Consulting (Canada) Inc. form part of the SRK Consulting Group which is an

independent, international consulting company that provides focused advice and solutions

to clients, mainly from earth and water resource industries. Formed in 1974, SRK now

employs more than 1,400 professionals in over 40 offices on 6 continents. Among SRK's

6

1,500 clients are most of the world's major- and medium-sized metal and industrial mineral

mining houses, exploration companies, banks, petroleum exploration companies,

construction firms and government departments.

FOR FURTHER INFORMATION PLEASE CONTACT:

Will Ansley, President & C.E.O.

[email protected]

Tel: (416) 862-5257

or visit the Company’s profile at www.sedar.com or its website at www.lupakagold.com

Qualified Person

The technical information in this document has been reviewed and approved by Julio

Castañeda Mondragón - MAIG, the President of Lupaka Gold Peru S.A.C. , a Peruvian

subsidiary of the Company, and a Qualified Person as defined by National Instrument 43-

101. Mr. Castañeda has verified the scientific and technical information, including

sampling, analytical and test data underlying the information or opinions contained in this

news release.

Cautionary Statements Regarding Forward Looking Information

This press release contains forward -looking statements which constitute "forward -looking

information" within the meaning of applicable securities laws, including all statements, trend

analysis and other information relative to anticipated future events or results. All statements, other

than statements of historical fact, included herein are considered forward -looking statements,

including, without limitation, statements relating to: any benefit to development costs and

improvement in mine dilution from the merger of the hanging wall split and the footwall zone; the

commencement of potential production from the Invicta Project in Q3 2018, the targeted mining

rate of 350 tpd, anticipated methods of production and the generation of cash therefrom.

Forward-looking statements are based on assumptions, estimates and opinions of management at

the date the statements are made and which the Company believes are reasonable. Such

information involves risks and uncertainties, and undue reliance should not be placed on s uch

information, as unknown or unpredictable factors could have material adverse effects on future

results, performance or achievements of the Company. Among the key factors that could cause

actual results to differ materially from those projected in the f orward-looking information are the

following: that the repayment of the PLI Financing is consummated on the anticipated terms; that

the Company will not experience any material accident, labour dispute, shortage of skilled and

professional staff, changes in project plans, equipment availability and failures, process failures,

the ability of third party service providers to deliver services on reasonable terms and in a timely

manner; future exploration activities planned at the Invicta Gold Project, and the timing and results

thereof; market conditions and general business, economic, competitive, political and social

conditions and with respect to the planned mining operations at Invicta; that pre -production mine

development can be completed in the time and for the cost projected; that the Company will be

able to obtain funding for planned production expenses; that mineralization at Invicta will be of the

grades and in the locations expected; that the Company will be able to extract and transport

mineralized rock efficiently and sell the mineralized rock at the prices and in the manner recoveries

and quantities expected; that permits will be received on the terms and timeline expected and that

other regulatory or permitting issues will not arise; that mining methods and reclamation can be

employed in the manner and at the costs expected and that such methods yield the results the

Company expects them to. Forward-looking information involves known and unknown risks,

uncertainties and other factors which may cau se the actual results, performance or achievements

of the Company to be materially different from any future results, performance or achievements

expressed or implied by the forward-looking information. Such risks, uncertainties and other factors

include, among others: all of the risks described in this news release; that the Company will not be

able to comply with the delivery or other obligations in the PLI Financing Agreement and the risk

that PLI will enforce its security over the Company’s assets, inc luding its mineral properties;

7

changes in commodity prices; currency exchange rates (such as the Canadian dollar versus the

United States dollar); risks associated with dilution; labour and employment matters; risks in the

event of a potential conflict of interest; changes in general economic, business and political

conditions, including changes in the financial markets; changes in applicable laws; and compliance

with extensive government regulation; and other risks generally associated with mineral

exploration. This forward -looking information may be affected by risks and uncertainties in the

regular course of business and due to market conditions. Additional risks are described in the

Company’s annual information form, which is available on SEDAR at www.sedar.com.

Although the Company has attempted to identify important factors that could cause actual actions,

events or results to differ materially from those described in forward-looking information, there may

be other factors that cause actions, events or results to not be as anticipated, estimated or intended.

There can be no assurance that forward -looking information will prove to be accurate, as actual

results and future events could differ materially from those anticipated in such statements. Readers

are cautioned not to place undue reliance on forward -looking information due to the inherent

uncertainty thereof. Lupaka Gold does not undertake any obligation to update forward -looking

statements except as required by applicable securities laws. Investor s should not place undue

reliance on forward-looking statements.

* Au-Eq. calculations are based on US$1250 for gold (“Au”), US$17.00 for silver (“Ag”), US$3.00 for copper (“Cu”), US$1.25 for zinc (“Zn”), and US$1.05 for lead (“Pb”), with assumed mill recoveries

of 85% for Au, 80% for Ag, 82 % for Cu and Pb, and 77% for Zn.

APPENDIX A

Summarized Assay Results from Underground Channel Sampling of the Atenea Vein on 3430 Sublevel, Invicta Gold Mine