Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LOT.V ·

TomaGold's partner IAMGOLD intersects 357 g/t Au over 0.8 metres at Monster Lake, Quebec

Drill Results

TomaGold's partner IAMGOLD intersects 357

g/t Au over 0.8 metres at Monster Lake,

Quebec

MONTREAL

,

July 23, 2019

/CNW Telbec/ -

TOMAGOLD

CORPORATION

(TSXV: LOT)

("TomaGold" or the "Corporation") is pleased to report that IAMGOLD Corporation

("IAMGOLD") today announced assay results from the 2019 winter drilling program completed at its

Monster Lake joint venture project (IAMGOLD: 50%, TomaGold: 45%, Quinto Resources Inc.: 5%),

located 50 kilometres southwest of

Chibougamau, Quebec, Canada

. IAMGOLD is reporting the final

assay results from 16 drill holes, totaling 5,270 metres, completed as part of the 2019 exploration

program.

The assay results are provided in Table 1 below and include the following highlights:

(A drill hole plan map and longitudinal sections are attached to this news release)

Annie Shear Zone

system:

Drill hole ML19-244: 0.8 metres grading 357 g/t gold

Drill hole ML19-248: 6.8 metres grading 3.85 g/t gold

Includes: 1.67 metres grading 6.43 g/t gold

Drill hole ML19-249: 0.5 metres grading 133 g/t gold

Big Mama Shear Zone area:

Drill hole ML19-245: 13.0 metres grading 2.27 g/t gold

Includes: 1.39 metres grading 6.45 g/t gold

Includes: 1.47 metres grading 7.65 g/t gold

The Monster Lake joint venture project hosts an NI 43-101 compliant resource, effective as at

February 26, 2018

, comprising 1,109,700 tonnes of inferred resources averaging 12.14 grams of

gold per tonne for 433,300 ounces of contained gold assuming an underground mining scenario (see

news release dated

March 28, 2018

).

The objective of the 2019 drilling program was to test priority areas along the strike of the main

structural corridor, hosting the 325-Megane zone, for additional zones of mineralization with potential

to increase total mineral resources on the property. Three main target areas were tested along the

Monster Lake Mineralized Corridor and included: the southern extensions of the 325-Megane and

Lower Shear zones; the general area of the intersection of the Main Shear zone and the Big Mama

Shear zone to the northeast of the 325-Megane zone; and the Annie Shear zone system also to the

northeast along strike of the 325-Megance zone. All of the areas targeted in this program were best

accessed during the winter when the ground is frozen.

"The bonanza-type grades intersected in the Annie area once again demonstrate the solid high-

grade gold potential of the Monster Lake project," said

David Grondin

, President and CEO of

TomaGold. "What's even more interesting is that these holes were intercepted in the area of hole M-

12-60, which returned 236.60 g/t Au over 5.7 metres in 2012. We strongly believe that Monster

Lake's potential over the 4 km long corridor has yet to be revealed."

In a separate press release on the recent results,

Craig MacDougall

, Senior Vice President,

Exploration for IAMGOLD, stated: "This drilling program has yielded positive results from the Big

Mama and Annie areas, which included the intersection of some local high-grade intervals carrying

visible gold. These positive results continue to demonstrate the potential for the discovery of

additional mineralized shoots along the Monster Lake structural corridor."

Next Steps

These results will be incorporated into the structural and deposit model and used to guide the next

drilling programs. Ongoing field activities for the summer season includes geological, geochemical

and structural studies to support exploration targeting.

About the Monster Lake Project

The Monster Lake project is underlain by Archean volcanic rocks of the Obatogamau Formation and

is traversed by an important deformation corridor and associated gold-bearing mineralized

structures. Historical drilling and exploration by TomaGold have identified a four-kilometre long

structural corridor, along which most of the known gold occurrences discovered to date on the

property are associated, including the 325-Megane Zone.

The Monster Lake project is held under an earn-in option to joint venture agreement with IAMGOLD,

which holds an undivided 50% interest in the property, and holds an option to earn a further 25%

undivided interest, for a total 75% undivided interest in the project, should it spend a total of

C$10.0

million

on the project within a seven year period, beginning

January 1, 2015

. Should a development

decision be made by the joint venture, or should the joint venture declare commercial production,

TomaGold would be entitled to a further

C$1.0 million

payment for each of these events.

On

August 14, 2017

, IAMGOLD subscribed for 27.7 million common shares of TomaGold from

treasury representing 19.98% of the outstanding common shares of TomaGold. The common shares

were purchased at a price of

C$0.09

per common share, for an aggregate purchase price of

C$2.5

million

. Prior to the acquisition, IAMGOLD did not hold any common shares of TomaGold.

Technical Information and Quality Control Notes

The drilling results contained in this news release have been prepared in accordance with National

Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101").

Work at IAMGOLD is carried out under the supervision of

Marie-France Bugnon

, P. Geo., General

Manager Exploration. Marie-France is considered a "Qualified Person" for the purposes of National

Instrument 43-101 with respect to the technical information being reported on. The technical

information has been included herein with the consent and prior review of the above noted Qualified

Person. The Qualified person has verified the data disclosed, and data underlying the information or

opinions contained herein.

The design of the drilling program and interpretation of results is under the control of IAMGOLD's

geological staff, including qualified persons employing strict protocols consistent with NI 43-101 and

industry best practices. The sampling of, and assay data from, the drill core is monitored through the

implementation of a quality assurance - quality control (QA-QC) program. Drill core (NQ size) is

logged and samples are selected by the IAMGOLD geologists and sawn in half with a diamond saw

at the project site. Half of the core is retained at the site for reference purposes. Sample intervals

may vary from half a metre to one and a half metres in length depending on the geological

observations.

Half-core samples are packaged and transported in sealed bags to ALS Minerals Laboratory

("ALS") located in

Val-d'Or

, Québec. Samples are coarse crushed to a -10 mesh and then a 1,000-

gram split is pulverized to 95% passing -150 mesh. ALS processes analytical pulps directly at their

facilities located in

Val-d'Or

which is ISO / IEC 17025 certified by the Standards Council of

Canada

.

Samples are analyzed using a standard fire assay with a 50-gram charge with an Atomic Absorption

(AA) finish. For samples that return assay values over 5.0 grams per tonne, another pulp is taken

and fire assayed with a gravimetric finish. Core samples showing visible gold or samples which have

returned values greater than 10.0 grams per tonne are re-analyzed by pulp metallic analysis.

IAMGOLD inserts blanks and certified reference standards in the sample sequence for quality

control.

The technical content of this press release has been reviewed and approved by Claude P.

Larouche

,

Eng., a qualified person under National Instrument 43-101.

About TomaGold Corporation

TomaGold Corporation is a Canadian mineral exploration Corporation engaged in the acquisition,

assessment, exploration and development of gold mineral properties. It currently has joint venture

agreements with IAMGOLD Corporation for the Monster Lake project, with Goldcorp Inc. for the

Sidace Lake property, and with Goldcorp Inc. and New Gold Inc. for the Baird property. TomaGold

has interests in seven gold properties near the

Chibougamau

mining camp in northern

Quebec

:

Monster Lake, Winchester, Lac à l'eau jaune, Monster Lake East, Monster Lake West, Obalski and

Lac Doda. It also holds interests of 39.5% in the Sidace Lake property and 24.5% in the Baird

property near the

Red Lake

mining camp in

Ontario

, and has a 70% interest in the Hazeur property,

at the southern edge of the Monster Lake group of properties.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this news release. The statements in this news release that are not historical facts are "forward-

looking statements". Readers are cautioned that any such statements are not guarantees of future

performance, and that actual developments or results may vary materially from those described in

such "forward-looking" statements.

Table 1 Monster Lake Project Drilling Results - 2019 Program. Notes: 1. Drill hole intercepts are

calculated using a 0.50 g/t Au assay cut-off. 2. True widths of intersections are approximately 50 to

80% of the core interval. 3. Assays are reported uncut but high grade sub-intervals are highlighted.

(CNW Group/Corporation TomaGold)

Drill Hole Plan Map - Monster Lake Project (CNW Group/Corporation TomaGold)

Monster Lake Structural Corridor - Longitudinal Sections (CNW Group/Corporation TomaGold)

SOURCE

Corporation TomaGold

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/July2019/23/c6448.html

%SEDAR: 00025917E

For further information:

David Grondin, President and Chief Executive Officer, (514) 583-3490,

www.tomagoldcorp.com

CO: Corporation TomaGold

CNW 07:00e 23-JUL-19