Stratabound Increases Mineral Resource Estimate on Fremont Gold Project
Stratabound Increases Mineral Resource
Estimate on Fremont Gold Project
Toronto, Ontario--(Newsfile Corp. - August 18, 2022) - Stratabound Minerals Corp. (
TSXV: SB
)
(
OTCQB: SBMIF
)
("
Stratabound
" or the "
Company
") is pleased to announce the release of its
updated NI 43-101 Mineral Resource Estimate (the "updated MRE") for its wholly owned Fremont Gold
Project in California's Mother Lode Gold Belt resulting in increases in both Indicated and Inferred Mineral
Resource classifications.
Highlights of the 2022 updated MRE include:
Indicated Mineral Resource increased by 121% to 1,163,000 oz Au (19,011 kt at 1.90 g/t
Au)
Inferred Mineral Resource increased by 348% to 2,024,000 oz Au (28,323 kt at 2.22 g/t Au)
Pit Component (pit-constrained) consists of 1.15 M oz Au Indicated (18,891 kt at 1.90 g/t
Au) and 1.49 M oz Au Inferred (22,507 kt at 2.06 g/t Au) Mineral Resource classifications
Underground Component (out-of-pit) consists of 9 k oz Au Indicated (121 kt at 2.21 g/t Au)
and 536 k oz Au Inferred (5,816 kt at 2.87 g/t Au) Mineral Resource classifications
The updated MRE replaces the Company's previous mineral resource estimate dated Sept. 30, 2021
(the "previous estimate") which extended along 960 metres of strike, 350 metres below surface and
included only the Pine Tree/Josephine open pit component.
The updated MRE now extends along 1,400 metres of combined strike length and up to 600 metres
below surface as it additionally includes the satellite Queen Specimen open pit plus the Pine
Tree/Josephine underground components.
Historical mining commencing in 1849 subsequent to the
California Gold Rush at the Pine Tree/Josephine underground mines extended across 800 metres of
strike, 600 metres vertical depth and produced 126 k oz of gold in 540 k tons, (8.0 g/t gold) at the
historical gold price of US$35 per ounce before closing in 1944.
The updated MRE is based on 33,982 metres of drilling, 518 metres of trench sampling, and 5,760
metres of underground channel sampling.
R. Kim Tyler, Stratabound's President and CEO, commented: "This updated Fremont MRE provides a
solid foundation from which the Company can advance towards completing a Preliminary Economic
Assessment ("PEA") and developing this gold project towards a production decision. The project is
enhanced over the previous Mineral Resource Estimate by the inclusion of the Queen Specimen and
underground component of the Pine Tree/Josephine deposit; however, this only evaluates 1.4 km of the
entire 4-km strike length of the Fremont Property that features four gold-mineralized zones and a recently
announced 285-metre wide, 30-5,210 ppb gold averaging 412 ppb gold-in-soil anomaly connected over
all the zones across the full extent of the Property (press release Feb. 23, 2022)."
Updated Fremont Gold Project Mineral Resource Estimate
The updated Fremont Gold Project Mineral Resource Estimate was prepared by P&E Mining
Consultants Inc. ("P&E") with an effective date of June 30, 2022 in accordance with the Canadian
Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards on Mineral Resources and
Reserves (2014) and Best Practices Guidelines (2019).
Pit-constrained Mineral Resources are reported using a cut-off grade of 0.25 g/t Au for oxide material,
and 0.45 g/t Au for sulphide material. Out-of-Pit (underground) Mineral Resources are reported using a
cut-off grade of 1.45 g/t Au.
Underground Mineral Resources have been constrained within potentially
mineable longhole shapes based on block grade and continuity. Historical mining has been depleted
from the updated Mineral Resource Estimate by assigning a zero-volume percentage block inclusion for
known areas of mining and development.
A summary of the MRE is provided in Table 1. The economic assumptions used for the updated MRE
are provided in the notes to the table.
Table 1.
Summary of Mineral Resource Estimate
(1-1
2
)
INDICATED
TONNES
(k)
GRADE
(g/t Au)
OUNCES
(k)
PIT-CONSTRAINED
18,891
1.90
1,154
OUT-OF-PIT
121
2.21
9
TOTAL
19,011
1.90
1,163
INFERRED
PIT-CONSTRAINED
22,507
2.06
1,488
OUT-OF-PIT
5,816
2.87
536
TOTAL
28,323
2.22
2,024
Table notes:
1
.
Mineral Resources were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral
Resources and Reserves, Definitions (2014) and Best Practices Guidelines (2019) prepared by the CIM Standing Committee on Reserve
Definitions and adopted by CIM Council.
2
.
The Inferred Mineral Resource in this estimate has a lower level of confidence that that applied to an Indicated Mineral Resource and
must not be converted to a Mineral Reserve. It is reasonably expected that the majority of the Inferred Mineral Resource could be
upgraded to an Indicated Mineral Resource with continued exploration.
3
.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
4
.
Mineral Resources are reported within a constraining conceptual pit shell.
5
.
Inverse distance weighting of capped composite grades within domains was used for grade estimation.
6
.
Composite grade capping was implemented prior to grade estimation.
7
.
Bulk density was assigned by redox domain.
8
.
A gold price of US$1,700/oz was used.
9
.
A cut-off grade of 0.25 g/t Au for oxide material, 0.45 g/t Au for sulphide material and 1.45 g/t Au for underground material was used.
10
.
Pit-constrained Mineral Resources were determined to be potentially economic based on a mining cost of US$3/t mined, heap leach
processing of US$9.16/t, flotation processing of US$10.02/t and G&A costs of US$2.50/t, with metallurgical recoveries of 85% by heap
leach and 90% by flotation.
11
.
Out-of-Pit Mineral Resources were determined to be potentially economic with the longhole mining method based on an underground
mining cost of US$40/t mined, processing of US$10.02/t and G&A costs of US$2.50/t, with a metallurgical recovery of 90%. Out-of-Pit
grade blocks that did not demonstrate potentially mineable configurations were removed from the Resource Estimate.
12
.
Totals may not sum due to rounding.
Next Steps
The advancement of the Fremont Gold Project includes ongoing technical studies and economic
analyses for a Preliminary Economic Assessment ("PEA"), mine permitting, and engagement with the
community and all stakeholders.
The PEA will provide an evaluation of preliminary Project components and alternatives, including an
economic analysis of the potential viability of the updated Mineral Resource Estimate. The ongoing
studies that lead to Stratabound's PEA will evaluate various mining scenarios that will consider the
environmental and socioeconomic impact of the Project for all stakeholders. The PEA will allow
Stratabound to explore and reveal the potential of this Project.
The Company continues to work with its environmental consultants to develop a plan for permitting the
Project. The Company reports that its baseline environmental program is progressing including
biological studies, surface water and monitoring groundwater wells for routine sampling. Other planned
evaluations for the permitting strategy will necessarily consider mine design, processing, and
reclamation plan development.
Meanwhile, Stratabound views this development in terms of its benefits to the California economy, as
well as the local Mariposa community through re-invigorating the production of California's mineral
wealth under modern regulatory requirements and environmental awareness.
In this regard R. Kim Tyler also stated: "We look forward to our continued work with community
members, elected officials and other stakeholders in Mariposa County as this project progresses.
Stratabound is committed to being a responsible and welcome corporate citizen, to protecting the
environment while developing a project that provides sustainable social and economic benefits that go
beyond the life of a mining enterprise, and of which the County and community can be proud. Our team
on the ground in Mariposa are actively meeting with community leaders to provide project planning
updates so that Fremont Mine can be an asset to the County through increasing economic diversity."
Qualified Persons
All Mineral Resource estimation work reported herein was carried out by Fred Brown, P.Geo., and
Eugene Puritch, P.Eng., FEC, CET both of P&E and Independent Qualified Persons in terms of NI 43-
101.
A Technical Report in support of this updated 2022 Mineral Resource Estimate for the Fremont Gold
Project will be prepared in accordance with NI 43-101 and filed on SEDAR (
www.sedar.com
) within 45
days of this news release.
ABOUT STRATABOUND
Stratabound Minerals Corp. is a Canadian mineral exploration and development company that is
developing its advanced-stage flagship Fremont Gold Project in the Mother Lode Gold Belt of California.
Additionally, Fremont also hosts three undeveloped gold occurrences across four kilometres of strike
length along the prolific Mother Lode Gold Belt.
The Company is also advancing its pipeline of other early-stage gold exploration projects including the
Golden Culvert, YT and McIntyre Brook, NB in Canada. Additionally, the Company holds two other
projects both of which feature NI 43-101 Mineral Resource Estimates.
These include a significant land
position in the Bathurst Camp of New Brunswick including the Captain Cobalt-Copper-Gold Deposit.
Mr. R. Kim Tyler, P.Geo., President and CEO of Stratabound, a "Qualified Person" and Eugene Puritch,
P. Eng., FEC, CET an "Independent Qualified Person" as defined in NI 43-101, have reviewed and
approved the contents and technical information of this news release.
For more information, please visit the company's website at
www.stratabound.com
or contact: R. Kim
Tyler, President and CEO 416-915-4157
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
WARNING: The Company relies upon litigation protection for "forward-looking" statements. The
information in this release may contain forward-looking information under applicable securities laws.
This forward-looking information is subject to known and unknown risks, uncertainties and other factors
that may cause actual results to differ materially from those implied by the forward-looking information.
Factors that may cause actual results to vary materially include, but are not limited to, inaccurate
assumptions concerning the exploration for and development of mineral deposits, currency fluctuations,
unanticipated operational or technical difficulties, changes in laws or regulations, failure to obtain
regulatory, exchange or shareholder approval, the risks of obtaining necessary licenses and permits,
changes in general economic conditions or conditions in the financial markets and the inability to raise
additional financing. Readers are cautioned not to place undue reliance on this forward-looking
information. The Company does not assume the obligation to revise or update this forward-looking
information after the date of this release or to revise such information to reflect the occurrence of future
unanticipated events, except as may be required under applicable securities laws.
This press release uses the terms Indicated and Inferred Mineral Resources as a relative measure of the
level of confidence in the Mineral Resource Estimate. Readers are cautioned that Mineral Resources
that are not Mineral Reserves do not have demonstrated economic viability. It cannot be assumed that all
or any part of an Inferred Mineral Resource will ever be upgraded to an Indicated or Measured Mineral
Resource category; however, it is reasonably expected that the majority of Inferred Mineral Resources
could be upgraded to Indicated Mineral Resources with continued exploration. The potential
development of the Mineral Resource Estimate disclosed in this press release may be materially
affected by legal, political, environmental or other risks. The Mineral Resource Estimate is classified in
accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards
on Mineral Resources and Mineral Reserves (2014) and Best Practices Guidelines (2019). Under NI 43-
101, estimates of inferred mineral resources may not form the basis of Feasibility or Pre-Feasibility
Studies or economic studies except for Preliminary Economic Assessments. Readers are cautioned not
to assume that further work on the stated Mineral Resources will lead to Mineral Reserves that can be
mined economically.
To view the source version of this press release, please visit