Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LMS.V ·

Centenera Reports Positive Surface Sampling Results from the El Peñón Gold Project, San Juan Province, Argentina

Drill Results Exploration Programs Sampling & Geoscience Results

LC063404‐1  

NR‐17‐04  21 March 2017 

Centenera Reports Positive Surface Sampling Results 

from the El Peñón Gold Project, San Juan Province, Argentina 

Vancouver, British Columbia ‐ Centenera Mining Corporation ("Centenera" or the "Company") ‐ (TSXV: CT, OTCQB: CTMIF), 

reports that it has received positive assay results from initial surface sampling at the Company’s El Peñón Gold Project (the 

“Project” or “El Peñón”) defining anomalous geochemistry over approximately 10km strike length and defining 4 targets for 

follow‐up  exploration.   The  El  Peñón  Project  is  located  within  the  Argentinian  Precordillera  in  San  Juan  Province  and  the 

exploration  program  is  based  on  a  Nevada  (Carlin‐type)  exploration  analog.   The  prospective  Precordillera  is  in  a  typical 

basin‐and‐range setting similar to Nevada but despite potential host rocks and a favourable structural setting, the area is 

underexplored for Carlin‐type deposits.  

Details of Results at El Peñón 

Results from 110 stream sediment samples and 26 rock chip samples have been received.   In total, 35 of the 100 stream 

sediment samples (31.8%) are considered anomalous (Figure 1A).   Two samples assayed with grades of 2.3 g/t (2,300ppb) 

gold and 2.21 g/t (2,219ppb) gold, which is exceptionally high for stream sediment samples and suggests a proximal gold 

source,  whether  at  surface  or  below  surface.   In  addition  to  the  gold  anomalies  there  are  coincident  multi‐element  gold 

pathfinder anomalies, which consist of silver, arsenic, antimony and thallium, all of which are gridded with gold to create 

signature  “gold  factor”  anomalies  (Figure  1B).   These  elements  typically  enter  residual  stream  sediments  upon  oxidation 

and weathering of gold mineralization and related hydrothermal alteration.  Given that the dirty limestone of the San Juan 

Formation is a potential host rock and that the structural setting is favourable, the multi‐element gold pathfinder anomalies 

identified through the current work supports the interpretation of a potential Carlin‐type exploration target.  Rock sampling 

returned no anomalous results, supporting the interpretation that the primary source of gold mineralization may be below 

surface and that anomalies are coincident with the important structural features that control mineralization.   

Future Work at El Peñón 

This initial work has highlighted anomalous surface geochemistry over approximately 10km strike length and identified 4 

target areas for follow‐up exploration (Figure 2).   The Marble Canyon and K‐Zone targets are strongest in terms of multi‐

element support and are likely associated with the most intense hydrothermal alteration.   The Project is at a much earlier 

stage  than  the  Company’s  flagship  Huachi  copper‐gold  project,  but  forms  an  important  part  of  the  Company’s  project 

pipeline.   The Company anticipates that the next step in exploring El Peñón will be to undertake detailed mapping, aiming 

to  define  drill  targets.   Detailed  mapping  will  focus  on  understanding  the  structural  setting  and  defining  potential  drill 

targets.   

About El Peñón 

The  Project  was  first  explored  in  2004,  when  the  Project  was  acquired  by  Committee  Bay  Resources  ("CBR")  and  work 

continued sporadically through to 2006.  The exploration program was based on a Nevada (Carlin‐type) exploration analog. 

The  prospective  Precordillera  is  in  a  typical  basin‐and‐range  setting  similar  to  Nevada  and  is  underlain  by  a  sequence  of 

Centenera Mining Corporation  2  21 March 2017 

NR 17‐04 Continued    

LC063404‐1  

predominantly "dirty limestone" or calcareous argillite, arenite and debris flow which are thrust over more massive, micritic 

limestone.   

Figure 1.  A. (left) Plan view of El Peñón geology with stream sediment sample locations classified 

by gold (Au) assay results.   B. (right) Plan view of El Peñón with gridded Gold Factor values with 

stream sediment sample gold assay results superimposed. 

Centenera Mining Corporation  3  21 March 2017 

NR 17‐04 Continued    

LC063404‐1  

Figure 2. Target areas for follow‐up exploration.  

QA/QC 

Stream  sediment  samples  and  rock  chip  samples  from  the  surface  sampling  referred  to  herein  were  collected  under  the 

supervision of Company geologists in accordance with standard industry practice.  Samples were dispatched via commercial 

transport to the SGS laboratory in Callao, Peru, an ISO 9001:2000 accredited laboratory, for analysis.  Quality assurance and 

quality control procedures include systematic laboratory insertion of blanks, standards, and duplicates.   

Centenera Mining Corporation  4  21 March 2017 

NR 17‐04 Continued    

LC063404‐1  

Qualified Person 

Tyler  Caswell,  P.Geo.,  the  Company's  Exploration  Manager  and  a  qualified  person  as  defined  by  National  Instrument  43‐

101, has reviewed the scientific and technical information that forms the basis of this news release, and has approved the 

disclosure herein. Mr. Caswell is not independent of the Company, as he is an employee and holds incentive stock options. 

On Behalf of the Board of Directors of 

CENTENERA MINING CORPORATION 

"Keith Henderson" 

President & CEO 

For further details on the  Company readers are referred to the Company's web site (www.centeneramining.com) and its 

Canadian regulatory filings on SEDAR at www.sedar.com. 

For further information, please contact:  Keith Henderson 

 Phone: 604‐638‐3456 

 E‐mail: [email protected] 

Neither  TSX  Venture  Exchange  nor  its  Regulation  Services  Provider  (as  that  term  is  defined  in  the  policies  of  the  TSX  Venture  Exchange)  accepts 

responsibility for the adequacy or accuracy of this press release, which has been prepared by management. 

Except  for  the  statements  of  historical  fact  contained  herein,  the  information  presented  in  this  news  release  and  the  information  incorporated  by 

reference  herein,  constitutes  “forward  looking  information”  within  the  meaning  of  applicable  Canadian  securities  laws  concerning  the  business, 

operations  and  financial  performance  and  condition  of  Centenera  Mining  Corporation  (the  “Company”).   All  statements,  other  than  statements  of 

historical  fact,  included  herein  including,  without  limitation,  statements  regarding  the  anticipated  content,  commencement,  timing  and  costs  of  the 

recommended  exploration  program  on  the  Project  and  exploration  program  results  from  same,  the  discovery  and  delineation  of  mineral 

deposits/resources/reserves  on  the  Project,  and  the  anticipated  business  plans  and  timing  of  future  activities  of  the  Company,  are  forward‐looking 

statements.  Often, but not always, forward looking information can be identified by words such as “pro forma”, “plans”, “expects”, “may”, “should”, 

“budget”,  “scheduled”,  “estimates”,  “forecasts”,  “intends”,  “anticipates”,  “believes”,  “potential”  or  variations  of  such  words  including  negative 

variations  thereof,  and  phrases  that  refer  to  certain  actions,  events  or  results  that  may,  could,  would,  might  or  will  occur  or  be  taken  or  achieved.  

Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or 

achievements of the Company to differ materially from any future results, performance or achievements expressed or implied by the forward looking 

information.   Such  risks  and  other  factors  include,  among  others,  operating  and  technical  difficulties  in  connection  with  mineral  exploration  and 

development  and  mine  development  activities  at  the  El  Peñón  Project,  including  the  geological  mapping,  prospecting  and  sampling  program  being 

proposed  for  the  Project,  actual  results  of  exploration  activities,  including  the  program,  estimation  or  realization  of  mineral  reserves  and  mineral 

resources, the timing and amount of estimated future production, costs of production, capital expenditures, the costs and timing of the development 

of  new  deposits,  the  availability  of  a  sufficient  supply  of  water  and  other  materials,  requirements  for  additional  capital,  future  prices  of  precious 

metals,  tantalum  and  lithium,  changes  in  general  economic  conditions,  changes  in  the  financial  markets  and  in  the  demand  and  market  price  for 

commodities,  possible  variations  in  ore  grade  or  recovery  rates,  possible  failures  of  plants,  equipment  or  processes  to  operate  as  anticipated, 

accidents, labour disputes and other risks of the mining industry, delays in obtaining governmental approvals, permits or financing or in the completion 

of  development  or  construction  activities,  changes  in  laws,  regulations  and  policies  affecting  mining  operations,  hedging  practices,  currency 

fluctuations, title disputes or claims limitations on insurance coverage and the timing and possible outcome of pending litigation, environmental issues 

and liabilities, risks related to joint venture operations, and risks related to the integration of acquisitions, as well as those factors discussed under the 

heading “Risk Factors” in the Company’s Management Information Circular (April 2016) and as discussed in the annual management’s discussion and 

analysis and other filings of the Company with the Canadian Securities Authorities, copies of which can be found under the Company's profile on the 

SEDAR website at www.sedar.com. 

Readers  are  cautioned  not  to  place  undue  reliance  on  forward  looking  information.   The  Company  undertakes  no  obligation  to  update  any  of  the 

forward looking information in this news release or incorporated by reference herein, except as otherwise required by law. 

‐30‐