Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LMS.V ·

Centenera Reports Positive Surface Sampling Results at El Quemado Lithium Project, Salta Province, Argentina Highlights include channel samples grading 1.41% Li2O over 6.0m and 0.73% Li2O over 10.0m

Drill Results Exploration Programs Sampling & Geoscience Results

NR‐17‐10  September 13, 2017 

Centenera Reports Positive Surface Sampling Results at 

El Quemado Lithium Project, Salta Province, Argentina 

Highlights include channel samples grading 

1.41% Li2O over 6.0m and 0.73% Li2O over 10.0m 

Vancouver,  British  Columbia  –  Centenera  Mining  Corporation  (“Cen t e n e r a ”  o r  t h e  “ C o m p a n y ” )  ‐  ( T S X V :  C T ,  O T C Q B :  

CTMIF), reports that it has received positive results from surface samplings at the El Quemado Lithium Pegmatite Project 

(the “El Quemado Project”), solidifying the Santa Elena target  ("Santa Elena") as the top priority going forward.  Santa 

Elena has returned multiple anomalous channel samples (see Table 1 and Figure 1 & Figure 2 below) demonstrating that 

the lithium mineralization is extensive in the outcropping pegmatite dikes.  In addition, the orientation soil sampling results 

are interpreted by the Company as demonstrating that lithium bearing pegmatites likely continue under soil cover to the 

north and the south of Santa Elena.  The Company intends to continue with additional soil sampling to establish the total 

potential strike length of the mineralized pegmatites. 

Santa Elena Rock Sampling Results 

Outcropping pegmatites were sampled by standard rock chip samples and channel samples taken using a mechanical rock 

saw to cut a channel across the pegmatites.  All samples were t aken perpendicular to the strike of the pegmatite veins 

and, as such, closely approximate their true width.  Channel sa mples are more time consuming and expensive to obtain, 

but result in superior quality samples as they remove subjectiv ity from the sampling process.  Highlights of the channel 

sampling results are included in Table 1 below.  

Table 1. Highlights of Rock Channel Sampling at Santa Elena Target. 

Channel ID  Length (m)  Li 2O (%)* 

ElQ‐0013  6  1.41 

ElQ‐14B  2.2  1.32 

ElQ‐14C  2  0.77 

ElQ‐0007  10  0.73 

ElQ‐0012  0.6  0.68 

ElQ‐0006  10  0.64 

ElQ‐0071  6.7  0.49 

ElQ‐0010  2.7  0.48 

ElQ‐0008  1.7  0.36 

*Li2O % values calculated using (Li ppm/10,000) x 2.153

Orientation soil samples were tak en northwest and southeast of  the outcropping pegmatite dikes.  The purpose of the 

orientation survey was to investigate whether soil sampling could be used to detect lithium mineralized pegmatites under 

soil cover. 

At Santa Elena, lithium was detec ted in soils directly along st rike from mineralized outcrops ( Figure 1), suggesting that 

mineralized pegmatites at Santa Elena can be detected using soil sampling.  These initial results provide the Company with 

Centenera Mining Corporation  2  September 13, 2017 

NR17‐10 Continued     

a cost‐effective tool with which to evaluate the remainder of the target area.  It is likely that systematic soil sampling will 

allow pegmatite mineralization to be traced under soil cover generating targets that can be tested by trenching or drilling 

as appropriate.  It should be possible to establish a total expected strike length and, potentially, the number of pegmatite 

dikes, before trenching or drill testing commences. 

Figure 1. Compilation of all surface sampling results at the Santa Elena target area, including rock chip samples, channel samples 

and orientation soil samples.  Channel samples labelled with sample numbers are described in Table 1 with both grade and 

sample width.  Note that the central claim is not held under option by the Company. 

Rock Sampling at Other El Quemado Project Targets 

Sampling at  the Las Pailas  target was severely curtailed by bad weather which resulted in  the exploration work being 

abandoned.  As a result, only 11 channel samples from approximately 75 planned channel samples were taken (Figure 3).  

No anomalous lithium was identified in the samples taken, but field reports indicate that the lithium mineral spodumene 

was identified in outcrop.  As a result, the Las Pailas target area remains a high priority for future work.   

Potential pegmatite dikes at the El Penon target were field checked and identified as un‐mineralized dacite porphyry dikes 

of no further interest.  Pegmatite dikes were located at the  Tres Cumbres target, but sampling did not locate anomalous 

lithium mineralization and no future work is planned for this target area.  

No sampling was undertaken at the  Leilita target, located at the far north end of the El Quemado Project.   This target 

remains open for future exploration. 

Centenera Mining Corporation  3  September 13, 2017 

NR17‐10 Continued     

Figure 2. Plot of rock sample grade versus sample length at Santa Elena target area. 

Figure 3. Map of the Las Pailas target area showing limited sampling and extensive areas of interpreted 

outcropping pegmatite, which has yet to be systematically sampled.  

0.00

0.50

1.00

1.50

2.00

2.50

02468 1 0 1 2

Li2O (%)

WIDTH (m)

Channel Width (m) vs. Li 2O (%) 

2017 Channel Samples

2016 Channel Samples

Centenera Mining Corporation  4  September 13, 2017 

NR17‐10 Continued     

About Lithium  

Lithium is produced from both brines and hard‐rock sources (pegmatites).  Estimates from 2015 suggest that global lithium 

production from conventional hard‐rock mining of lithium minera ls may be as high as 44% (source: Macquarie research 

2016).   Lithium pegmatites are a  viable source of  the metal due   to their  high  concentration in ores relative  to brines.  

Production from these lithium pe gmatite deposits mitigates glob al concerns regarding  undue dependence on supplies 

from dominant brine producers in Chile and Argentina.  As a grade comparison, moderate to high brine grades of 400ppm 

lithium  equate  to  0.04%  lithium,  whereas  initial  sampling  at  the  El  Quemado  Project  has  returned  grades  as  high  as 

9,400ppm or 0.94% lithium.  Chemical‐grade lithium refers to spodumene that is converted to lithium carbonate or lithium 

hydroxide. Pegmatites are a source of technical‐grade lithium, where spodumene is used directly in the ceramics or glass 

industries without processing. 

About Pegmatites  

Pegmatites  are  igneous  rocks  that  form  during  the  final  stage  of  a  cooling  magma's  crystallization.    To  be  called  a 

pegmatite, a  rock should  be  composed almost entirely of crystal s that are at least one centimeter in diameter.  Most 

pegmatites have a composition that is similar to granite with an abundance of quartz, feldspar and mica.  Pegmatites can 

be sources of valuable minerals such as spodumene (a lithium‐bearing mineral) that are rarely found in economic amounts 

in other types of rocks.  In the initial stages of crystallizat ion, the ions that form high‐temperature minerals are depleted 

f r o m  t h e  m e l t .   R a r e  i o n s  t h a t  d o  n o t  p a r t i c i p a t e  i n  t h e  c r y s t allization  of  common  rock‐forming  minerals  become 

concentrated  in  the  melt  and  in  the  excluded  water.    These  ions c a n  f o r m  t h e  r a r e  m i n e r a l s  t h a t  a r e  o f t e n  f o u n d  i n  

pegmatites.    Examples  include  small  ions  such  as  lithium  and  beryllium  that  form  spodumene  or  large  ions  such  as 

tantalum that form tantalite.  Rare elements concentrated in large crystals make pegmatite a potential source of economic 

concentrations.  

Quality Assurance / Quality Control 

Quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into 

the channel, rock and soil sample sequences.  The results of the control samples are evaluated and results are re‐analysed 

and/or resubmitted as needed. All results stated in this news r elease have passed the Company’s quality assurance and 

quality control protocols.  

Channel samples were taken using a gas‐powered rock saw with a  diamond tipped saw blade to cut a channel across the 

outcropping pegmatite dikes.  The rock saw was used to prepare  a channel approximately 5 cm in width and depth, the 

rock was then broken out from the channel using a hammer and ch isel.  All rock samples were accompanied by a hand 

specimen, identified with the number of the sample for later pe trographic work if warranted. All samples were collected 

and  catalogued  under  the  supervision  of  Company  geologists  in  accordance  with  standard  industry  practice.    Samples 

were dispatched to the SGS laboratory in Callao, Peru, an ISO 9001:2000 accredited laboratory, for digestion using sodium 

peroxide fusion method and analysis using inductively coupled plasma atomic emission spectroscopy.   

Qualified Person 

Tyler Caswell, P.Geo., the Company's Exploration Manager and a  qualified person as defined by National Instrument 43‐

101, has reviewed the scientific and technical information that forms the basis for portions of this news release, and has 

approved the disclosure herein.  Mr. Caswell is not independent of the Company, as he is an employee and holds incentive 

stock options. 

About Centenera Mining Corporation 

Centenera is a mineral resource company trading on the TSX Venture Exchange, under the symbol "CT" and on the OTCQB 

exchange under the symbol "CTMIF".  The Company is focused 100% on prospects in Argentina.  The Company intends to 

focus  its  2017  exploration  activities  on  drill‐testing  its  flagship Huachi  copper‐gold  project.  The  Company  has  made 

application for a drilling permit through the underlying owner and is awaiting approval to begin exploration.  Other assets, 

such as the El Quemado lithium pegmatite project in Salta Province are intended with  be explored by the Company with 

Centenera Mining Corporation  5  September 13, 2017 

NR17‐10 Continued     

the aim of proving project potential and attracting a joint ven ture partner or a project sale. The Company also intends to 

seek a joint venture partner for its Organullo gold project, which has approximately 8,000 meters of historical drilling and 

assay results. The Organullo project has a geological target range from 19.8 million tonnes grading at 0.94 g/t gold (600,000 

ounces) to 31.6 million tonnes grading 0.92 g/t gold (940,000 ounces) using a 0.5 g/t gold cut‐off‐grade. It should be noted 

that these potential exploration target quantities and grades a re conceptual in nature, that insufficient exploration and 

geological modelling has been done to define a mineral resource , and that it is uncertain if further exploration will result 

in the delineation of a mineral resource. 

On Behalf of the Board of Directors of 

CENTENERA MINING CORPORATION 

"Keith Henderson" 

President & CEO 

For further details on the Company readers are referred to the  Company's web site (www.centeneramining.com) and its 

Canadian regulatory filings on SEDAR at www.sedar.com. 

For further information, please contact:   

Keith Henderson 

Phone: 604‐638‐3456 

E‐mail: [email protected] 

Neither TSX Venture Exchange nor its Regulation Services Provid er  ( as t hat  t er m i s d efi ned  i n t he pol i c i es of t he TSX  Vent ur e  Exchange) accepts 

responsibility for the adequacy or accuracy of this news release. 

This  news  release  contains  forward‐looking  statements  and  forward‐looking  information  (collectively,  “forward‐looking  statements”)  within  the 

meaning  of  applicable  Canadian  and  U.S.  securities  legislation,  including  the United  States  Private  Securities  Litigation  Reform  Act  of  1995.   A l l  

statements, except for statements of historical fact, that addr ess activities, events or develo pments that management of the C ompany expects or 

anticipates  will  or  may  occur  in  the  future  including  such  things  as  the  anticipated  exploration  program  results  from  exploration  activities,  the 

discovery and delineation of mineral deposits and rock sampling results from the El Quemado lithium pegmatite project, Huachi copper‐gold project 

and Organullo gold project, the Company’s ability to enter into  a joint venture agreement or sale agreement for the El Quemand o an Organullo 

projects, the anticipated conten t, commencement, and cost of ex ploration programs in respect of the Company's projects and min eral properties, 

the anticipated business plans and timing of future activities of the Company, future capital expenditures (including the amount and nature thereof), 

business strategies and measures to implement strategies, competitive strengths, goals, expansion and growth of the business and operations, plans 

and references to the future success of the Company, and such o ther matters, are forward‐lookin g statements.  Often, but not a lways, forward‐

l o o k i n g  s t a t e m e n t s  c a n  b e  i d e n t i f i e d  b y  w o r d s  s u c h  a s  “ p r o  f o r ma”,  “plans”,  “expects”,  “may”,  “should”,  “budget”,  “scheduled”,  “estimates”, 

“forecasts”, “intends”, “anticipates”, “believes”, “potential” or variations of such words including negative variations thereof, and phrases that refer 

to certain actions, events or results that may, could, would, might or will occur or be taken or achieved.  Forward‐looking statements involve known 

and  unknown  risks,  uncertainties  and  other  factors  which  may  cause  the  actual  results,  performance  or  achievements  of  the  Company  to  differ 

materially from any future resul ts, performance or achievements  expressed or implied by the forward‐looking statements.  Such  risks and other 

factors  include,  among  others,  the  ability  of  the  Company  to  obtain  sufficient  financing  to  fund  its  business  activities  and  plans,  operating  and 

technical difficulties in connection with mineral exploration a nd development and mine development activities for Company's pr ojects generally 

(including geological mapping, prospecting and sampling programs), actual results of exploration activities (including the estimation or realization of 

mineral reserves and mineral resources), the timing and amount of estimated future production, costs of production, capital expenditures, the costs 

and  timing  of  the  development of  new  deposits,  the  availability  of  a sufficient  supply  of  water and  other  materials,  requirements  for  additional 

capital, future prices of precious metals, tantalum and lithium, changes in general economic conditions, changes in the financ ial markets and in the 

demand and market price for commodities, possible variations in ore grade or recovery rates, possible failures of plants, equipment or processes to 

operate as anticipated, accidents, labour disputes and other risks of the mining industry, delays in obtaining governmental and regulatory approvals 

(including  of  the  TSX  Venture  Exc h a n g e ) ,  p e r m i t s  o r  f i n a n c i n g  or  in  the  completion  of  development  or  construction  activities, changes  in  laws, 

regulations  and  policies  affecting  mining  operations,  hedging  practices,  currency  fluctuations,  title  disputes  or  claims  limitations  on  insurance 

coverage and the timing and possi ble outcome of pending litigat ion, environmental issues and liabilities, risks related to joi nt venture operations, 

and risks related to the integration of acquisitions, as well as those factors discussed under the heading “Risk Factors” in the Company’s most recent 

annual management’s discussion a nd analysis and other filings o f the Company with the Canadian Securities Authorities, copies  of which can be 

found under the Company's profile on the SEDAR website at www.sedar.com. 

Centenera Mining Corporation  6  September 13, 2017 

NR17‐10 Continued     

Readers are cautioned not to place undue reliance on forward‐lo oking statements.  The Company undertakes no obligation to upda te any of the 

forward‐looking statements in this news release or incorporated by reference herein, except as otherwise required by law. 

‐ 30 ‐