Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LMR.V ·

Lomiko announces the third round of analytical results from the infill and extension exploration drill program at La Loutre Graphite property, drilling wide high-grade intersections at 11.02% Cg over 120m at the northern end of

Drill Results

#439, 7184 120th Street, Surrey, BC, V3W 0M6● Ph: (778) 228- 1170 ● Fax: (604) 583-1932 ● Website: www.lomiko.com

Lomiko announces the third round of analytical results from the infill and

extension exploration drill program at La Loutre Graphite property, drilling

wide high-grade intersections at 11.02% Cg over 120m at the northern end of

EV Zone

Montreal, Quebec - September 28, 2022 - Lomiko Metals Inc. (TSX.V: LMR) (“Lomiko Metals”

or the “Company”) is pleased to announce the third round of analytical results from the infill and

extension exploration drill program at its wholly -owned La Loutre Graphite property, located

approximately 180 kilometres northwest of Montréal in the Laurentian region of Québec. The La

Loutre graphite project site is located within the Kitigan Zibi Anishinabeg (KZA) First Nations

territory. The drilling was supervised by Québec-based, independent geological consultant

Breakaway Exploration Management Inc. and was operated under ECOLOGO requirements and

compliance protocols, as Lomiko is ECOLOGO certified. Please see the press release issued on

March 23, 2022 for more details about Lomiko’s ECOLOGO certification.

Belinda Labatte, CEO and Director stated: “Our team is very excited to see that t he results from

the 1 4 holes drilled at the nor thern end of the EV Zone in 2022 demonstrate strong graphite

mineralization over significant widths. Many holes intersected high grades over 110-to-120-metre

intervals. The number of holes confirms the potential of this area for additional graphite resources.

We look forward to more results in the next 21 holes in the EV zone which will be released as

more assays are received. Our vision is to become a responsible operator and part of a climate

success story in Southern Quebec.”

Highlights

• First initial drill results from the northern part of EV Zone show very thick mineralization

zones with high grades in 8 out of 10 mineralized holes (please see table below).

• Several wide intervals of near- surface, high -grade flake graphite mineralization

including 11.02% Cg over 120.00m from 32.0 to 152.0m in hole LL -22-032 including

48.0m at 15.58% Cg from 50.0 to 98.0m.

• Second best result of 8.73% Cg over 110.5m from 81.5 to 192.0m in hole LL-22-019

Including 69.0m at 12.09% Cg from 102.5 to 171.5m

• Numerous intersections remain open; additional assay results pending including holes LL-

22-022, -024, 025, -026, -029, -030, -032 and -033

• Northeastern limit of graphite mineralization defined with holes LL-22-27& LL-22-028

• EV Zone shows a robust trend and remains open to the northwest in holes LL-22-019 &

LL-22-022

The drill program at La Loutre was initiated on May 15, 2022, with the goal to further define the

deposit, provide the data needed to increase confidence in the mineral resource and build on the

results of the positive Preliminary Economic Assessment for the La Loutre project as announced

in the Company’s July 29, 2021, press release (see link). Lomiko has retained InnovExplo Inc, a

Quebec-based independent consulting firm specializing in geology, resource estimation, mining

engineering and sustainable development, to prepare an updated NI 43- 101 compliant resource

estimate for the La Loutre project following the completion of the 2022 drill program.

The assay results reported in this press release are for the 14 holes drilled at the north end of the

EV Zone. These holes were drilled to determine the northern extent of the graphite mineralization,

confirm the results of the previous drilling, and provide better detail of the EV Zone in this part of

the deposit. Please refer to Table 1 for the weighted average graphitic carbon -bearing drill

intersections (not true thickness) and Table 2 and Figure 1 for the collar locations referred to in

this press release. These results are in addition to the assay results for eighteen holes announced in

Lomiko’s press releases dated September 6 and 20, 2022.

Table 1: Weight averaged graphitic carbon-bearing drill intersections (not true thickness)

Hole From m To m Int. m % Cg Notes

LL-22-011 Not Sampled, abandoned hole, redrilled as LL-22-013

LL-22-013 3.0 6.0 3.0 1.23

LL-22-016 73.0 85.0 12.0 3.76

139.0 164.5 25.5 4.80

Including 154.0 163.0 9.0 8.16

LL-22-019 81.5 192.0 110.5 8.73

Including 102.5 171.5 69.0 12.09

LL-22-022 4.0 20.5 16.5 4.09 Open down-hole from 20.5m

Including 5.5 16.0 10.5 5.68

38.5 70.0 31.5 4.09

Including 43.0 47.5 4.5 16.07

93.0 132.0 39.0 4.39

Including 120.0 127.5 7.5 13.19

LL-22-024 42.0 67.5 25.5 2.31 Open up-hole from 42.0m & down-hole from 67.5m

90.0 109.5 19.5 2.99 Open up hole from 90.0m

LL-22-025 80.0 101.0 21.0 6.17

Including 87.5 95.0 7.5 13.50 Open up-hole from 87.5m & down-hole from 95.0m

140.0 185.0 45.0 15.07 Open down-hole from 185.0m

LL-22-026 121.0 125.5 4.5 3.59 Open up-hole from 121.0m

LL-22-027 No sampling, entirely quartzite

LL-22-028 No sampling, entirely quartzite

LL-22-029 83.7 89.7 6.0 5.74 Open up-hole from 83.7m & down-hole from 89.7m

LL-22-030 47.5 56.5 9.0 4.05 Open up-hole from 47.5m

LL-22-032 32.0 152.0 120.0 11.02 Open down-hole from 152.0m

Including 50.0 98.0 48.0 15.58

176.0 186.5 10.5 5.59 Open-up hole from 176.0m

LL-22-033 33.4 45.4 12.0 4.83 Open up-hole from 33.4m,

168.5 191 22.5 8.69 Stopped in graphite mineralization

Including 170.0 180.5 10.5 15.20

On the northeast side of the EV Zone, holes LL -22-011, -013, -026, -027 and - 28 were drilled

entirely or mostly in quartzite and encountered no or very narrow graphite mineralization within

narrow paragneiss bands within the quartzite. The lack of significant graphite in these holes

effectively defines the northeastern limit of the EV Zone.

Wide intervals of high- to moderate-grade graphite were encountered in holes LL-22-016, -019, -

022, -024, -025, -030, -032 and -033 and narrow, moderate-grade intervals in LL-22-029 and -30

within paragneiss. Exceptional intervals of near-surface, high-grade flake graphite mineralization

include 11.02% graphitic carbon (“% Cg”) over 120.0 metres (“m) from 32.0 to 152.0m in hole

LL-22-032 and 8.73% Cg over 110.5m from 81.5 to 192.0m in hole LL-22-019. These impressive

intersections define a strong graphite trend and indicate that the EV Zone has excelle nt potential

to continue to the northwest. Additional sampling has been done and assays are pending to fully

close these intervals.

Table 2: Drill Hole Collar Locations (UTM NAD 83, Zone 18)

Hole UTM_mE UTM_mE Elev._m Azimuth_° Dip_° Length_m

LL-22-011 499286 5098374 337 60 -50 24.2

LL-22-013 499286 5098374 337 60 -50 150.0

LL-22-016 499251 5098354 337 60 -49 174.0

LL-22-019 499239 5098319 340 60 -51 192.0

LL-22-022 499170 5098268 340 60 -55 141.5

LL-22-024 499206 5098245 334 65 -50 199.0

LL-22-025 499259 5098279 347 60 -51 200.0

LL-22-026 499338 5098419 344 60 -56 153.0

LL-22-027 499359 5098380 338 60 -55 96.0

LL-22-028 499327 5098340 339 60 -52 151.7

LL-22-029 499257 5098221 352 60 -53 174.0

LL-22-030 499261 5098189 351 60 -57 174.3

LL-22-032 499321 5098219 352 60 -52 189.3

LL-22-033 499316 5098195 353 60 -52 195.0

Figure 1: EV Zone Drill Hole Locations

Qualified Person

The technical content presented in this press release was reviewed by Mark Fekete, P.Geo. who

actively participated in the La Loutre drill program as an independent consultant to the Company

as the "Qualified Person" as that term is defined under National Instrument 43-101 – Standards of

Disclosure for Mineral Projects.

QAQC and Analytical Procedures

The drill core was logged and marked for sampling by a professional geologist. All the core was

photographed as part of the logging procedure. Core samples were collected by spli tting each

sample interval in half lengthwise with a hydraulic core splitter. One half of the interval was

returned to the core box, and the other half was placed in a plastic bag with a tag. The tag number

was marked in indelible ink on the outside of the bag, and the bag was sealed with a plastic tie-

wrap. One certified reference material standard and one blank were included in each batch of 21

samples. For shipping, samples were placed in rice bag s that were individually sealed with

numbered, tamper-proof security tags. The rice bags were then placed on wooden pallets, secured

with plastic wrapping, and delivered by truck to Manitoulin Transport Inc. for shipping to

Activation Laboratories Ltd. (“Actlabs”) in Ancaster, Ontario.

At Actlabs the samples were crushed to 80% passing 2mm and then riffle split to a 250g sub-

sample that was pulverized to pulp 95% passing 105μm (Actlabs Code RX1). The sample pulps

were then analyzed for graphitic carbon “Cg”) by mild hydrochloric acid digestion followed by

combustion in an infrared induction furnace (Actlabs Code 8Cg). Actlabs is accredited under ISO

9001:2015 registration and is independent of the Company.

About Lomiko Metals Inc.

Lomiko Metals has a new vision and a new strategy in new energy. Lomiko represents a company

with purpose: a people -first company where we can manifest a world of abundant renewable

energy with Canadian and Quebec critical minerals for a solution in North America. Our goal is

to create a new energy future in Canada where we will grow the critical minerals workforce,

become a valued partner and neighbour with the communities in which we operate, and provide a

secure and responsibly sourced supply of critical minerals.

In addition to La Loutre, Lomiko is working with Critical Elements Lithium Corporation towards

earning its 70% stake in the Bourier Project as per the option agreement announced on April 27th,

2021. The Bourier project site is located near Nemaska Lithium and Critical Elements south -east

of the Eeyou Istchee James Bay territory in Quebec which consists of 203 claims, for a total ground

position of 10,252.20 hectares (102.52 km2), in Canada’s lithium triangle near the James Bay

region of Quebec that has historically housed lithium deposits and mineralization trends.

About the La Loutre Graphite Project

The Company holds a 100% interest in its La Loutre graphite development project in southern

Quebec. The La Loutre project site is located within the Kitigan Zibi Anishinabeg (KZA) First

Nations territory. The KZA First Nations are part of the Algonquin Na tion and the KZA territory

is situated within the Outaouais and Laurentides regions. Located 180 kilometres northwest of

Montreal, the property consists of one large, continuous block with 76 mineral claims totalling

4,528 hectares (45.3 km2).

The Property is underlain by rocks belonging to the Grenville Province of the Precambrian

Canadian Shield. The Grenville was formed under conditions that were very favourable for the

development of coarse- grained, flake-type graphite mineralization from organic -rich material

during high-temperature metamorphism.

Lomiko Metals published a July 29, 2021 Preliminary Economic Estimate (PEA) which indicated

the project had a 1 5-year mine life producing per year 100,000 tonnes of graphite concentrate at

95% Cg or a total of 1.5Mt of graphite concentrate. This report was prepared as National

Instrument 43-101 Technical Report for Lomiko Metals Inc. by Ausenco Engineering Canada Inc.,

Hemmera Envirochem Inc., Moose Mountain Technical Services, and Metpro Management Inc.,

collectively the Report Authors.

On behalf of the Board,

Belinda Labatte

CEO and Director, Lomiko Metals Inc.

For more information on Lomiko Metals, review the website at www.lomiko.com or

please contact:

Kimberly Darlington

[email protected]

514-771-3398

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the applicable Canadian

securities legislation that is based on expectations, estimates, projections and interpretations as at the date

of this news release. The information in this news release about the Company; and any other information

herein that is not a historical fact may be "forward-looking information" (“FLI”). All statements, other than

statements of historical fact, are FLI and can be identified by the use of statements that include words such

as "anticipates", "plans", "continues", "estimates", "expects", "may", "will", "projects", "predicts",

“proposes”, "potential", "target", "implement", “scheduled”, "intends", "could", "might ", "should",

"believe" and similar words or expressions. FLI in this new release includes, but is not limited to: the

Company’s objective to become a responsible supplier of critical minerals, exploration of the Company’s

projects, including expected costs of exploration and timing to achieve certain milestones, including timing

for completion of exploration programs; the Company’s ability to successfully fund, or remain fully funded

for the implementation of its business strategy and for exploration of any of its projects (including from the

capital markets); any anticipated impacts of COVID-19 on the Company’s business objectives or projects,

the Company's financial position or operations, and the expected timing of announcements in this regard.

FLI involves known and unknown risks, assumptions and other factors that may cause actual results or

performance to differ materially. This FLI reflects the Company’s current views about future events, and

while considered reasonable by the Company at this time, are inherently subject to significant uncertainties

and contingencies. Accordingly, there can be no certainty that they will accurately reflect actual results.

Assumptions upon which such FLI is based include, without limitation: current market for critical minerals;

current technological trends; the business relationship between the Company and its business partners;

ability to implement its business strategy and to fund, explore, advance and develop each of its projects,

including results therefrom and timin g thereof; the ability to operate in a safe and effective manner;

uncertainties related to receiving and maintaining exploration, environmental and other permits or

approvals in Quebec; any unforeseen impacts of COVID -19; impact of increasing competition i n the

mineral exploration business, including the Company’s competitive position in the industry; general

economic conditions, including in relation to currency controls and interest rate fluctuations.

The FLI contained in this news release are expressly qualified in their entirety by this cautionary statement,

the “Forward -Looking Statements” section contained in the Company’s most recent management’s

discussion and analysis (MD&A), which is available o n SEDAR at www.sedar.com, and on the investor

presentation on its website. All FLI in this news release are made as of the date of this news release. There

can be no assurance that such statements will prove to be accurate, as actual results and future events could

differ materially from those anticipated in such statements. Accordingly, readers should not place undue

reliance on forward-looking information. The Company does not undertake to update or revise any such

forward-looking statements or forward- looking information contained herein to reflect new events or

circumstances, except as may be required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news

release. No stock exchange, securities commission or other regulatory authority has approved or

disapproved the information contained herein.