Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LME.V ·

LAURION’s 2023 Drilling Campaign Successfully Defines the Sturgeon River Mineralized System Over A Strike Length of 1,600m And To Depth Of 600m

Exploration Programs

Page 1

LAURION’s 2023 Drilling Campaign Successfully Defines the Sturgeon

River Mineralized System Over A Strike Length of 1,600m And To Depth

Of 600m

TORONTO, ONTARIO – (February 2, 2024) – Laurion Mineral Exploration Inc. (TSX.V: LME

and OTCPINK: LMEFF) (“LAURION” or the “Corporation”) is pleased to announce that,

further to its news release s dated December 13, 2023, January 5, 2024 and January

12, 2024, the Corporation ’s 2023 drilling campaign was successful in confirming the

strike length of the Stu rgeon River mineralized system over 1,600m at its Ishkoday

project, located 220km Northeast of Thunder Bay, ON (the “Property”). The nine (9)

drill holes from 2023 intercept ed the seven (7) veins comprising the Stu rgeon River

mineralized system.

The Sturgeon River mineralized system is composed of seven (7) distinct quartz veins

and mineralized shear zones. The drilling intercepts var y in true widths between 0.5m

and 7.95m , with grade s ranging from 0.1 g/t Au and 7.78 g/t Au. The drilling

intercepted the No 3 vein , which was historically mined between 1936 and 1942

producing 73,438 ounces of Gold and 15,922 ounces of silver from 145,123 tonnes of

ore, milled grading an average 0.51 ounc es per ton gold (17.0 g/t) (Mackasey W.O.

1976 -Geology of Walters and Leduc Township, District of Thunder Bay, Ontario Div.

Mines, GR149, 58p.). This vein is part of a series of three (3) parallel veins striking roughly

N020° with a sub-vertical dip. A second vein system, consisting of 4 parallel sub-vertical

veins strike roughly at N030° was also intercepted during the drilling.

Highlights from the 2023 drilling program include:

• Confirmation of the extension of the Sturgeon River Mine mineralization by 600

metres to the northeast, with grade intercepts as high as 29.45 g/t Au over 3.5

metres (along core), including 186.00 g/t Au over 0.55 metres (along core);

and,

• Confirmation of the extension of the Sturgeon River Mine mineralization by 320

metres to the southeast, with grade intercepts as high as 3.088 g/t Au over 7.5

metres (along core), including 36.0 g/t Au over 0.5 metres (along core) and

including 9.0 g/t Au over 0.65 metres (along core).

The mineralized intervals identified in the drilling are mostly associated with the

massive Sturgeon River quartz-bearing diorite and exhibits characteristics typical of

orogenic gold deposits . These intervals are predominantly hosted within a massive,

quartz-bearing diorite, in association wit h shear zones and mafic volcanic dykes

indicative of a deep-seated and structurally controlled geological environment. The

Page 2

presence of quartz-carbonate veins, often accompanied by chlorite, points towards

significant hydrothermal alteration processes, a hallmark of orogenic gold systems.

The alteration is typically associated with the influx of mineral- rich fluids during

deformation and metamorphism. The vein types observed, particularly those rich in

quartz and carbonate with varying proportions of chlorite, suggest episodic fluid flow

and vein formation, commonly seen in orogenic gold settings.

It is interpreted that the veins are associated with a major shear zone trending NE that

stems from the Niish shear zone, bordering the s outh of the Property. The strong

structural control of the mineralization and association with the proximity of a mafic

dyke are key exploration features that will help in further exploration efforts. Laurion’s

team will be further refining the current 3D model of the vein system by systematically

reviewing mineralized intervals with core pictures and oriented core to improve in

further geometric prediction of the vein system.

LAURION’s team recognizes its ability to generate actionable insights from it s

significant exploration database by utilizing Artificial Intelligence ( “AI”) to analyze

data to refine targeting by using machine learning to map out alteration and

structural signatures from drilling. LAURION also recognizes that its significant database

is able to leverage the power of AI and other advanced technologies, and th us,

moving forward, expects to be better positioned to optimize it s advancement in

exploration efficiencies.

Qualified Person

The technical contents of this release were reviewed and approved by Jean-Philippe

Paiement, PGeo, MSc, a consultant to LAURION, and a qualified person as defined by

National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

About LAURION Mineral Exploration Inc.

The Corporation is a junior mineral exploration and development company listed on

the TSXV under the symbol LME and on the OTC under the symbol LMEFF. LAURION

now has 263,346,102 outstanding shares of which approximately 72% are owned and

controlled by Insiders who are eligible investors under the “ Friends and Family ”

categories.

LAURION's emphasis is on the exploration and development of its flagship project, the

100% owned mid- stage 57.43 km2 Ishkoday Project, and its gold -rich polymetallic

mineralization.

FOR FURTHER INFORMATION, CONTACT:

LAURION Mineral Exploration Inc.

Cynthia Le Sueur-Aquin – President and CEO

Tel: 1-705-788-9186

Fax: 1-705-805-9256

Steven Hunter - Investor Relations Consultant

Email: [email protected]

Website: http://www.LAURION .ca

Page 3

Caution Regarding Forward-Looking Information

This press release contains forward-looking statements, which reflect the Corporation’s current expectations regarding

future events, including with respect to LAURION's business, operations and condition, management's objectives,

strategies, beliefs and intentions, the Corporation’s ability to advance the Ishkoday Project, the drill results and

highlights described in this press release and the interpretation and expected impact of these results and highlights,

the nature, timing and potential results of the Corporation’s future exploration efforts and drill programs, including its

planned activities for the Ishkoday Project in 2024. The forward -looking statements involve risks and uncertainties.

Actual events and future results, performance or achievements expressed or implied by such forward -looking

statements could differ materially from those projected herein including as a result of a change in the trading price of

the common shares of LAURION, the interpretation and actual results of current exploration activities, changes in

project parameters as plans continue to be refined, future prices of go ld and/or other metals, possible variations in

grade or recovery rates, failure of equipment or processes to operate as anticipated, the failure of contracted parties

to perform, labor disputes and other risks of the mining industry, delays in obtaining governmental approvals or

financing or in the completion of exploration, as well as those factors disclosed in the Corporation’s publicly filed

documents. Investors should consult the Corporation’s ongoing quarterly and annual filings, as well as any other

additional documentation comprising the Corporation’s public disclosure record, for additional information on risks

and uncertainties relating to these forward-looking statements. The reader is cautioned not to rely on these forward-

looking statements. Subj ect to applicable law, the Corporation disclaims any obligation to update these forward-

looking statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED IN THE

POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS R ESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE

CONTENT OF THIS NEWS RELEASE.