Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LME.V ·

Laurion Updates Summer Exploration Program at Ishkoday

Exploration Programs

Page | 1 

LAURION UPDATES SUMMER EXPLORATION PROGRAM AT ISHKODAY

THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT INTENDED FOR

DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES.

TORONTO, ONTARIO (August 7, 2019) - Laurion Mineral Exploration Inc. (TSX.V: LME) and

(OTCPINK: LMEFF) (“LAURION” or the “Corporation”) is pleased to provide the Corporation’s

second update of the 2019 field exploration program (the “ Stage 2 Campaign ”) at the

Corporation’s wholly-owned Ishkoday Project (“Ishkoday”) located 220 km northeast of Thunder

Bay, Ontario. The Stage 2 Campaign forms part of the 2018-2019 exploration initiated in May

2018 as a three-staged 18-month program with the strategic objective of outlining the precious

and base metals upside potential at Ishkoday.

LAURION initiated mechanized outcrop stripping, power washing, channel sampling and

geological mapping of the M22-23-24-25 Quartz Veins at TR18-3, the Sturgeon Nos. 1-2-3 Quartz

Veins at TR19-1, the CRK Sulphide and A-2 Quartz Veins at TR19-2, and the Marge-“F”-“X” Quartz

Veins at TR19-3, all part of the 3 km by 1 km Target Area (the “ Target Area”) of the southern

claims block ( refer to the Corporation’s news releases dated June 14 and July 17, 2019 ).

Additional field mapping was also being done within the 2018 stripped areas at TR18-1 (85-A2

Quartz Veins system) and at TR18-2 (Bootleg Quartz Vein system). Refer to the Location Map on

LAURION’s website using the following link: http://laurion.ca/ishkoday-project/highlights/2019-

field-exploration-program/.

As a result of this work, LAURION now believes that the Loki Trend (as defined below) extends

from the historic Miron Showing to the northeast, then successively encompassing towards the

southwest the Garvey, “A” Zone, “D” Zone, McLeod, CRK, Joe and Tehya Showings, increasing

the size of the precious and base metals Target Area from the original 3 km by 1 km to 5 km by

1 km. The Loki Trend itself is 400 m wide.

Details of work completed as of this news release are as follows:

(1) Channel sampling (231 samples) at TR18-3 has been completed and assay results were

issued for the M24 Quartz Vein (“ M24”) (refer to the Corporation’s news release dated

August 1, 2019).

Significant composite interval results included 5.49 g/t gold over 1.70 m (Line 17), 6.20 g/t

gold over 1.35 m (Line 25), and 2.59 g/t gold over 5.76 m (Line 35P).

Page | 2 

Significant individual assay results above 1 g/t gold included from the M24:

 9.63 g/t gold over 0.59m (Line 2)

 9.27 g/t gold over 0.20m (Line 4)

 16.35 g/t gold over 0.55m (Line 17)

 10.60 g/t gold over 0.62m (Line 22)

 12.00 g/t gold over 0.29m (Line 31)

 9.81 g/t gold over 1.26m (Line 35P*)

From the altered, quartz veined and pyrite-bearing Porphyry surrounding the vein

(“Shear”), assay results showed 7.92 g/t gold over 0.35 m (Line 16) within shear and from

the “QFP”, where it is altered, quartz-veined and pyrite-bearing - 9.99 g/t gold over 0.83

m (Line 25) and 1.87 g/t gold over 1.65 m (Line 26).

* P suffix means samples were taken within and parallel to the M24, whereas other sample Lines

without the suffix P are taken within or outside and perpendicular to the M24 Quartz Vein.

(2) Channel sampling and detailed field mapping has also been completed at TR19-1. All

channel sample assay results are pending, including 393 channel samples from the

historic No 3 Quartz Vein (the “3 Vein”) and host rocks.

The surface exposed portion of the 3 Vein measures 150 m in length and varies between

a few centimeters to more than 30 cm wide. Historic work showed the 3 Vein as a single

vein rarely splitting into two veins (3B Quartz Vein as reported by Phoenix Gold Mines,

1988), but LAURION’s stripping at TR19-1 ha s established the 3 Vein as a package of

multiple, anastomosing, centimeter-wide quartz veins oriented in two main directions of

010° and 040°, as well as sub-horizontal m illimeter-wide quartz veinlets, all forming

stockworks in a minimum 20 m wide corridor within a disseminated and stringer sulphide-

bearing porphyry host at the south central end of the Sturgeon River Porphyry (the

“Porphyry”).

In addition, geology maps from the underground drifts and crosscuts of the historic Mine

(past production from 1935 to1942) indicate a similar pattern of veining to -685 m below

surface (L. Koskitalo, Phoenix Gold Mines, 1988), also validated by the presence of

significant quartz veinlets (with gold) in Porphyry “waste rock” from the Mine’s stockpile.

LAURION’s 2010 diamond drilling (LME-10-008, 008Wedge, 009, 009Wedge and 010) that

undercut the 3 Vein and other major quartz veins confirm the widespread extent of these

stockworks to not only below -700 m vertical depth, but also greater than 500 m in width.

(3) Channel sampling is progressing on schedule at TR19-2 along the CRK Sulphide Veins

(“CRK”), and the A2 Quartz Vein. Sampling is slated to be completed in August.

Outcrop stripping uncovered the full extent of combined gold-silver bearing sulphide

(iron, zinc and copper sulphides) and oxide (iron oxide or magnetite), actinolite (calcium,

magnesium, and iron silicate) and chlorite (magnesium and iron alumino-silicate) veining

in a heavily bleached, brecciated, silicified host forming a series of 040° to 050° trending

meter-wide corridors (the “Loki Trend”).

Page | 3 

The A-2 Quartz Vein (the “A-2 Vein”) was observed over at CRK as it pinches and swells,

forms beads or boudins, locally split in two, as it meanders its way over a 500 m stripped

length.

(4) Outcrop stripping at the Marge, “X” and “F” Quartz Veins (the “Marge”) in the north and

central portion of the Porphyry at TR19-3 has been completed, covering 1,760 m of total

stripped lines.

As observed at the M24, 3 Vein and A-2 Vein, the veins of the Marge are shear-veins, with

metric wide highly schistose wall rocks containing millimeter to centimeter wide quartz

veinlets, iron carbonate, sulphides (iron and copper sulphides for now) and chlorite

streaks similar to what is observed at CRK. The Marge meanders across the Porphyry

between 005° to 055°, and anastomoses with a series of smaller centimeter veins and

fractures or shears. The sector also host numerous north-south trending centimeter wide

extension veins. A major 100 m wide 045° shear zone exhibiting steep foliations, some

sulphide development and fine millimeter- wide quartz veins was observed at the

northwest extremity of the Marge.

(5) Pending outcrop stripping will cover the M25 Quartz Vein at TR19-4 (8.40 g/t gold over a

245 m length and average 0.23 m width), located 50 m southeast of M24, and the Nos.

8-11 (4.61 g/t over 30.49 m and average 0.05 m width) and A9 Quartz Veins (29.89 g/t

over 67.68 m and average 0.09 m width), adjacent Highway #801 at TR19-5, as well as

the Tehya or A-18 Sulphide Veins (“ Tehya”). The above gold assay interval results are

historical, reported in the 1986 Exploration Program Report, Sturgeon River Gold Mines

Property, 34 pages, by L.O. Koskitalo, February 1988.

At Tehya, diamond drill holes LME-10-006: 0.15 g/t gold, 19.4 g/t silver, 0.70% copper and

0.72% zinc over 0.66 m (from 31.50 m to 32.2 m), roughly 20-25 m below the surface

channel sample #14 which yielded 0.19 g/t gold, 14.70 g/t silver, 0.32% copper and 3.07%

zinc over 4.05 m; and LME-10-007 (located 50 m southwest of LME-10-006): 0.45 g/t gold,

27.78 g/t silver, 0.94% copper and 3.91% zinc over 4.08 m (from 35.50 m to 39.58 m) (refer

to the Corporation’s news release dated September 8, 2010).

(6) Additional field mapping of 2018 stripped areas TR18-1 and 2 has been completed.

(7) Core re-logging continues in respect of key previous LAURION drill holes from across

Ishkoday to re-evaluate the rock units, structures, alteration and mineralization, and

eventually complete additional core sampling to ensure continuous assaying of the

entire drill core for the evaluation of the bulk gold potential.

(8) An airborne magnetic survey will be completed in August to further refine Rock Units,

structures and sulphide-magnetite veins in 3D and help in the definition of litho-structural

domains.

(9) In excess than 2,200 m2 of stripped outcrop from TR18-3 has been rehabilitated.

Page | 4 

Work at this time on the regional 1:250,000 and 1:50,000 map scales geological modelling by

Mira Geoscience, and the geological analysis and block modelling at the local 1:50,000 and

1:15,000 map scales by The Nordmin Group of Co mpanies, has sufficiently advanced until the

end of the field season. Both their work will pick up in Q4-2019.

Confirming the extensions of known and new gold bearing quartz and polymetallic sulphide

veins remains a priority for the Stage 2 Campaign and will ultimately help in completing the

construction of the 2-D and 3-D geological-mineralization model (the “ Model”). This Model will

provide LAURION with a solid technical base to initiate diamond drilling to prove the upside

potential as part of the Stage 3 program to start later in 2019-2020. LAURION’s work continues

confirming the extensive quartz and sulphide veining across the Target Area. The field portion of

the Stage 2 Campaign is slated for completion by the end of Q3-2019.

Qualified Person

Mr. Jean Lafleur, P. Geo. (PGO, OGQ), LAURION’s Technical Advisor to the Board of Directors, is

a Qualified Person as defined by National Instrument 43-101 guidelines and has reviewed and

approved the content of this news release. Assay samples from the Stage 2 Campaign are being

processed by ALS Global Geochemistry in Thunder Bay, Ontario, and analyzed by ALS Global

Analytical Lab in North Vancouver, BC, using the Fire Assay method of analysis. LAURION

employs an industry standard system of external standards, blanks and duplicates for all its

sampling in addition to the QA/QC protocol employed by the laboratory. For further details on

LAURION’S QA/QC protocols are outlined in the news release dated August 1, 2019.

About Laurion

The Corporation is a junior mineral exploration and development company listed on the TSX-V

under the symbol LME and on the OTCPINK under the symbol LMEFF. LAURION now has

155,739,759 outstanding shares of which 62% are owned and controlled by Insiders who are

eligible investors under the “Friends and Family” categories.

LAURION’s emphasis is on the development of it s flagship project, the 100% owned mid-stage

44 km 2 Ishkoday Project, and its gold-silver and go ld-rich polymetallic mineralization with a

significant upside potential. The Ishkoday Proj ect has a project-wide database (2008 to 2018)

that includes 283 diamond drill holes totaling 40,729m, geological mapping, ground geophysics,

and 14,992 individual samples with assays and geochemical analysis. The mineralization on the

Ishkoday is open at depth beyond the current core-drilling limit of -200 m from surface, based

on the historical mining to a -685 m depth, as evidenced in the past producing Sturgeon River

Mine.

FOR FURTHER INFORMATION, CONTACT:

Laurion Mineral Exploration Inc.

Cynthia Le Sueur-Aquin – President and CEO

Tel: 1-705-788-9186

Fax: 1-705-805-9256

Website: http://www.laurion.ca

Page | 5 

Caution Regarding Forward-Looking Information

This news release contains forward-looking statements, which reflect the Corporation’s current expectations regarding future events,

including with respect to LAURION's business, operations and condition, future plans for the development of the Corporation and/or

the Ishkoday Gold Project, and management's objectives, strategies, beliefs and intentions.

The forward-looking statements involve risks and uncertainties. Actual events and future results, performance or achievements

expressed or implied by such forward-looking statements could differ materially from those projected herein including as a result of

a change in the trading price of the Common Shares, the interpretation and actual results of current exploration activities, changes

in project parameters as plans continue to be refined, future prices of gold and/or other metals, possible variations in grade or

recovery rates, failure of equipment or processes to operate as anticipated, the failure of contracted parties to perform, labo r

disputes and other risks of the mining industry, delays in obtain ing governmental approvals or financing or in the completion o f

exploration, as well as those factors disclosed in the Corporat ion’s publicly filed documents. Investors should consult the

Corporation’s ongoing quarterly and annual filings, as well as any other additional documentat ion comprising the Corporation’s

public disclosure record, for additional information on risks and uncertainties relating to these forward-looking statements. The reader

is cautioned not to rely on these forward-looking statements. Su bject to applicable law, the Corporation disclaims any obligati on

to update these forward-looking statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX

VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.