LAURION Provides Corporate Update on Environmental Permitting and Ore Sorting Analysis
Page 1
LAURION Provides Corporate Update on Environmental Permitting and
Ore Sorting Analysis
TORONTO, ONTARIO ( April 21, 2023 ) – LAURION Mineral Exploration Inc. (TSX.V: LME and
OTCPINK: LMEFF) (“LAURION” or the “Corporation”) is very pleased to provide an update on
the progress o f environmental permitting and ore sorting analysis regarding LAURION’s 100%
wholly-owned 47km 2 Ishkoday p roperty (the “ Ishkoday Project ”). The Ishkoday Project is
located in northwestern Ontario, 56 kilometres west of Geraldton, and just 10 kilometres north
of the Trans-Canada highway No. 11 along Provincial Road 801.
LAURION is well funded and continues to advance the Ishkoday Project. LAURION will
commence its 2023 field work program at the end of May, which is expected to consist of
stripping and channel sampling existing (and new) gold bearing veins to outline wide gold
bearing stockworks, together with structural mapping to better define the mineralization
controls of orogenic type mineralization.
Environmental Permitting
LAURION has completed over 2 years of environmental baseline studies, including surface
water, groundwater and biological studies. The Corporation has initiated work required to
apply for environmental permits in support of the Advanced Exploration Ishkoday Shaft project,
which currently entails dewatering an existing shaft for access and exploration purposes, and
treating the dewatering output to acceptable limits prior to discharge. Permits will be required
from the provincial government of Ontario, and are anticipated to include a Mine Closure
Plan, Permit to Take Water and Envir onmental Compliance Approvals. The Mine Closure Plan
will require LAURION to describe rehabilitation measures t hat are to take place, and to post
Financial Assurance for the rehabilitation work prior to commencing Advanced Exploration.
The Permit to Take Water and Environmental Compliance Approvals, obtained through the
Ontatio Ministry of Environment, Conservation and Parks, are required to allow for dewatering
and treatment activities.
Consultation regarding LAURION’s plans and permits with its Indigenous partners and
stakeholders have been initiated and will be ongoing throughout the permitting, exploration
and closure phases.
Blue Heron Environmental (“Blue Heron”) has been coordinating the baseline studies, and will
lead the permitting efforts for Advanced Exploration. Linda Byron, Director at Blue Heron,
stated: “We are excited to be at the forefront of this project and continuing to work with
LAURION and their partners to initiate Advanced Exploration at the Ishkoday site!”
Ore Sorting Analysis
The Saskatchewan Research Council (“SRC”) recently completed test work in Q1 2023 using a
two-tonne sample of 20-60 mm sized material sourced from the stockpile to simulate a sensor-
Page 2
based sorting (“SBS”) operation and develop a sorting algorithm for future pilot plant work. A
table showing the results of the sorting tests conducted in 2022 and 2023 is provided below.
The results of the test work demonstrated that t he SBS laser and color sorting methods were
successful in removing a significant proportion of vein host rock rock while still efficiently
recovering small, fragmented quartz particles that are often associated with gold. Specifically,
the SBS laser threshold setting could remove an estimated 92.6% of host rock (compared to
vein material), while the SBS color and optical tests removed an estimated 89.6% of host rock,
with efficient recovery of the quartz fragments oftentime associated with gold.
SRC recommended that pilot plant testing be completed on Ishkoday material using the
sorting algorithm to economically v alidate the use of sorting technology. These promising
results suggest that SBS could be a valuable tool for improving the efficiency and profitability
of gold extraction processes.
The objective of ore sorting is to r educe handling costs and increase gold grades of ore sent
for processing.
Corporate Update
In light of its re -evaluation of the Ishkoday Project and consequent enhanced interpreted
potential of the Sturgeon River Mine area, in particular, management and the technical team
have decided to focus on completing additional surface work and drilling in the area of the
shaft and stockpiles associated with the historical Sturgeon mine , prior to committing the
capital necessary to p rocess the stockpile resources. Notwithstanding the foregoing,
environmental permitting will continue as planned.
LAURION’s 2023 field work will focus on those areas where there is potential for a sufficient
concentration/density of the several well- mineralized veins. Given insights derived from the
recent breakthrough e xploration work, the area within the western sector of the Ishkoday
Project, and particularly the area between the historical Sturgeon River and Brenbar Mines, is
of marked interest. The historic Sturgeon River Mine data further suggests that mineralizatio n
may be more extensive at depth and along strike, which could potentially generate feed for
future operations.
It is anticipated that processing of the surface ore-bearing stockpiles will facilitate the mineral
characterization representative of the hos t rock mineralized trends, simultaneous with
evaluation and development of the 'proximal mine' gold mineralization within 1 km of the
stockpiles.
For further information, please see the Corporation’s National Instrument 43 -101-compliant
Technical Report entitled “Technical Report on the Resource Estimate on the Sturgeon River
Mine Waste Pile and Tailings, Ishkoday Property, Northern Ontario”, dated June 7, 2013, which
is available on SEDAR, as well as the Corporation’s news release dated April 23, 2013.
Page 3
Qualified Person
The technical contents of this release were reviewed and approved by Jean-Philippe
Paiement, PGeo, MSc, a consultant to LAURION, and a qualified person as defined by National
Instrument 43-101 – Standards of Disclosure for Mineral Projects.
About LAURION Mineral Exploration Inc.
The Corporation is a junior mineral exploration and development company listed on the TSXV
under the symbol LME and on the OTCPINK under the symbol LMEFF. LAURION now has
256,909,855 outstanding shares of which approximately 80% are owned and controlled by
Insiders who are eligible investors under the “Friends and Family” categories.
LAURION's emphasis is on the development of its flagship project, the 100% owned mid -stage
47 km2 Ishkoday Project, and its gold-silver and gold-rich polymetallic mineralization.
FOR FURTHER INFORMATION, CONTACT:
LAURION Mineral Exploration Inc.
Cynthia Le Sueur-Aquin – President and CEO
Tel: 1-705-788-9186
Fax: 1-705-805-9256
Website: http://www.LAURION.ca
Caution Regarding Forward-Looking Information
This news release contains forward-looking statements, which reflect the Corporation’s current expectations
regarding future events including with r espect to LAURION's business, operations and condition,
management's objectives, strategies, beliefs and intentions, the Corporation’s ability to advance the Ishkoday
Project, the Corporation’s ability to obtain all environmental permits and approvals required to advance the
Ishkoday Project and complete the activities and programs contemplated in this news release, the ability of
SBS laser, color and other sorting technologies to improve the efficiency and profitability of gold extraction
processes, and its future impact on LAURION’s business and operations, and the nature, focus , timing and
potential results of the Corporation’s future exploration efforts, including its planned activities for Ishkoday i n
2023. The forward -looking statements involve risks and uncertainties. Actual events and future results,
performance or achievements expressed or implied by such forward-looking statements could differ materially
from those projected herein including as a result of a change in the trading price of the common shares of
LAURION, the interpretation and actual results of current and future exploration activities, changes in project
parameters as plans continue to be refined, future prices of gold and/or other metals, possible variations in
grade or recovery rates, failures and/or delays in obtaining governmental approvals and permits, any issues
and/or disagreements arising between LAURION and its Indigenous partners and stakeholders in regards to
permitting, exploration and closure phases, failure of equipment or processes to operate as anticipated, the
failure of contracted parties to perform, labor disputes and other risks of the mining industry, delays in obtaining
governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in
the Corporation’s publicly filed documents. Investors should consult the Corporation’s ongoing quarterly and
annual filings, as well as any other additional documentation comprising the Co rporation’s public disclosure
record, for additional information on risks and uncertainties relating to these forward -looking statements. The
reader is cautioned not to rely on these forward -looking statements. Subject to applicable law, the
Corporation disclaims any obligation to update these forward-looking statements.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED IN THE
POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCUR ACY OF
THE CONTENT OF THIS NEWS RELEASE.