Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LME.V ·

LAURION Confirms the Extension of the Sturgeon River Mine Mineralization by 600 Metres to the Northeast With Grade Intercepts as High as 29.45 g/t Au Over 3.5 Metres, Including 186.00 g/t Au Over 0.55 Metres

Drill Results

Page 1

LAURION Confirms the Extension of the Sturgeon River Mine

Mineralization by 600 Metres to the Northeast With Grade Intercepts as

High as 29.45 g/t Au Over 3.5 Metres, Including 186.00 g/t Au Over 0.55

Metres

TORONTO, ONTARIO - (January 5, 2024) – Laurion Mineral Exploration Inc. (TSX.V: LME

and OTCPINK: LMEFF) (“LAURION” or the “Corporation”) is pleased to announce the

assay results of the first five diamond drill holes from its Fall 2023 diamond drill program,

which was completed on the Corporation’s Ishkoday Project, located in Ontario, 220

km northeast of Thunder Bay and 28 km northeast of the town of Beardmore.

LAURION recently announced the completion of its Fall drill program of 3,636 metres

in nine diamond drill holes . The primary objective of the first five diamond drill holes

was to target the northeast extension of the Sturgeon River Mine structure . The

Sturgeon River Mine mineralization system comprises the Number 1, 2 and 3 (main)

quartz veins, as well as other quartz veins a nd shear structures encountered in the

historic mining of the Sturgeon River Mine. The Number 3 quartz v ein was mined

between 1936 and 1942.

The Number 3 quartz v ein (historically mined) consists of anastomosing quartz veins

oriented north-northeast and steeply dipping to the southeast. The mineralized system

also comprises other mineralized structures, such as the Numbers 1 and 2 quartz veins,

Coniagas and Numbers 1 8-11 quartz veins (the “3 Vein Quartz Vein System or 3QVS”)

along with additional secondary (for now) quartz veins and shears of different sizes

and trends. The original system was historically defined over a strike length of 450 m.

The drill program targeted the ext ension of the system to the northeast with the

intention of doubling the strike length of the mineralized structures. The results received

to date demonstrate that the system extends on significant strike length and is still

open at depth and along strike. Confirming the extensions of this known structure will

assist with updating the 2-D and 3-D geological mineralization model LAURION, which

should provide a solid technical base to initiate further diamond drilling programs in

this area.

Page 2

Drilling Highlights

The results for the five aforementioned diamond drill holes, LBX22-032 to LBX22 -036,

include the following intersection highlights:

Assay Results: Highlights of the Northeastern Sturgeon Rive Mine Drill Holes

Holes ID From

(m)

To

(m)

Core

Length

(m)

Au

(g/t)

LME23-032 172.50 176.00 3.50 29.5

including 172.50 173.05 0.55 186.00

LME23-032 233.75 234.28 0.53 7.78

LME23-032 240.4 240.96 0.56 1.05

LME23-032 243.1 244.76 1.66 3.11

including 243.1 243.72 0.62 8.11

LME23-033 80.5 81.0 0.5 1.64

LME23-033 210 212.55 2.55 1.23

including 210 210.6 0.6 4.35

including 210.6 212.55 1.95 0.27

LME23-033 338.0 338.7 0.7 4.49

LME23-034 70.8 71.4 0.6 1.36

LME23-034 127.8 128.3 0.5 3.26

LME23-034 175.75 177.75 2.0 12.89

LME23-034 176.35 177.75 1.4 17.63

LME23-034 176.35 177 0.65 18.25

LME23-034 227.2 228.2 1.0 0.54

LME23-034 245.5 247 1.5 5.10

LME23-034 245.5 246.4 0.9 7.87

LME23-034 458.3 459.1 0.8 2.71

LME23-035 25.5 26.0 0.5 3.58

LME23-035 289.9 290.4 0.5 1.05

LME23-035 314.25 315.05 0.8 1.38

LME23-035 343.4 344 0.6 1.38

LME23-036 123.75 124.25 0.5 1.79

LME23-036 171.1 172.0 0.9 1.44

LME23-036 214.35 214.9 0.55 1.68

LME23-036 219.05 220.25 1.2 7.38

including 219.75 220.25 0.5 17.5

LME23-036 400.8 401.35 0.55 4.19

Page 3

Coordinates for Drill Holes LME23-032 to LME23-036

Drill Hole

Number Azimuth Dip

Planned

(m)

Actual

(m)

LME23-032 150 -45 500 513

LME23-033 115 -45 350 342

LME23-034 115 -60 500 465

LME23-035 90 -45 350 354

LME23-036 90 -60 475 480

TOTAL 2,175 2,154

Sampling and QA/QC Protocols

All core was transported and stored inside the core facility located in Beardmore.

LAURION employs an industry standard system of external standards, blanks and

duplicates for all of its sampling, in addition to the QA/QC protocol employed by the

laboratory.

After logging, core samples were identified and then cut in half along core axis in the

same building, and then zip tied individually in plastic sample bags with a bar code.

Approximately five or six of these individual bags were then stacked into a “rice” white

material bag and stored on a skid for final shipment to the laboratory.

All core samples were shipped to the ALS facility in Thunder Bay , which were then

prepared by ALS Global Geochemistry in Thunder Bay , and analyzed by ALS Global

Analytical Lab in North Vancouver, British Columbia.

Samples are processed by 4-acid digestion and analyzed by fire assay on 50 g pulps

and ICP -AES (Inductively -Coupled-Plasma – Atomic-Element-Spectroscopy). Over

limit analyses are reprocessed with gravimetric finish. A total of 5% blanks and 5%

standard are inserted randomly within al l samples. 5% of the best assay result pulps

were sent for re-assays. A total of 8.7% blanks and 9.5% standard were randomly

inserted during the pXRF analyse of the soil sampling. 2.8% we re-analyzed. All QAQC

were verified, and no contamination or bias have been observed.

The remaining half of the core, as well as the unsampled core, were stacked on a skid

outside in Beardmore and then transferred to the Sturgeon Mine site core farm for final

storage.

Qualified Person

The technical contents of this release were reviewed and approved by Jean-Philippe

Paiement, PGeo, MSc, a consultant to LAURION, and a qualified person as defined by

National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

About LAURION Mineral Exploration Inc.

The Corporation is a junior mineral exploration and development company listed on

the TSXV under the symbol LME and on the OTC under the symbol LMEFF. LAURION

now has 263,346,102 outstanding shares of which approximately 72% are owned and

controlled by Ins iders who are eligible investors under the “Friends and Family ”

Page 4

categories.

LAURION's emphasis is on the exploration and development of its flagship project, the

100% owned mid -stage 57.43 km2 Ishkoday Project, and its gold -rich polymetallic

mineralization.

FOR FURTHER INFORMATION, CONTACT:

LAURION Mineral Exploration Inc.

Cynthia Le Sueur-Aquin – President and CEO

Tel: 1-705-788-9186

Fax: 1-705-805-9256

Steven Hunter - Investor Relations Consultant

Email: [email protected]

Website: http://www.LAURION .ca

Caution Regarding Forward-Looking Information

This press release contains forward-looking statements, which reflect the Corporation’s current

expectations regarding future events, including with respect to LAURION's business, operations

and condition, management's objectives, strategies, beliefs and intentions, the Corporation’s

ability to advance the Ishkoday Project, the drill results and highlights described in this press

release and the interpretation and expected impact of these results and highlights, the nature,

timing and potential results of the Corporation’s future exploration efforts and drill programs,

including its planned activities for the Ishkoday Project in 2024. The forward-looking statements

involve risks and uncertainties. Actual events and future results, performance or achievements

expressed or implied by such forward -looking statements could differ materially from those

projected herein including as a result of a change in the trading price of the common shares

of LAURION, the interpretation and actual results of current exploration activit ies, changes in

project parameters as plans continue to be refined, future prices of gold and/or other metals,

possible variations in grade or recovery rates, failure of equipment or processes to operate as

anticipated, the failure of contracted parties to perform, labor disputes and other risks of the

mining industry, delays in obtaining governmental approvals or financing or in the completion

of exploration, as well as those factors disclosed in the Corporation’s publicly filed documents.

Investors should consult the Corporation’s ongoing quarterly and annual filings, as well as any

other additional documentation comprisin g the Corporation’s public disclosure record, for

additional information on risks and uncertainties relating to these forward -looking statements.

The reader is cautioned not to rely on these forward-looking statements. Subject to applicable

law, the Corporation disclaims any obligation to update these forward-looking statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM

IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE

ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.