Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LME.V ·

LAURION announces initial Phase 2 drill results, including 152 g/t gold over 1.00 m, at CRK Zone, Ishkoday Project, Ontario

Drill Results

1

LAURION announces initial Phase 2 drill results, including 152 g/t

gold over 1.00 m, at CRK Zone, Ishkoday Project, Ontario

THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT

INTENDED FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR

DISSEMINATION IN THE UNITED STATES.

TORONTO, ONTARIO (December 1, 2020) – LAURION Mineral Exploration Inc. (TSX.V:

LME and OTCPINK: LMEFF) (“LAURION” or the “Corporation”) is pleased to report

assay results for the first four (4) drill holes of the ten (10) hole, 2,962 m Phase 2 drill

campaign, completed on the CRK Zone, Ishkoday Project. Assay results are pending

on the remaining six (6) holes. The Ishkoday Project is located approximately 220 km

northeast of Thunder Bay, Ontario , near the town of Beardmore in the Onaman -

Tashota gold belt.

Highlights:

 LME20-025

o 14.25 m @ 10.98 g/t gold, including:

 1.00 m @ 152 g/t gold;

 1.00 m @ 3.90 g/t gold

 LME20-024

o 2.00 m @ 2.75 g/t gold, 17.7 g/t silver, 1.28 % copper

 LME20-022

o 1.69 m @ 7.56 g/t silver, 2.40 % zinc

 LME20-023

o 0.50 m @ 6.70 g/t silver, 3.46 % zinc

David Lewis, P.Geo., LAURION Exploration Manager, commented: “ Mineralization

has been intersected in each of the first four holes, showing good continuity of

surficial mineralization to depth. These first four drillholes targeted specific

mineralization at the main CRK zone, including the Azurite, A5, Akhi and Joe veins, in

areas with poor outcrop exposure.

Thus far, hole LME20-025, targeting the north-striking Joe structure, is our best result at

10.98 g/t gold over 14.25 m (2.42 g/t gold if capped to 30 g/t). On surface, channel

sampling returned 4.25 m at 5.98 g/t gold and 2.84 % zinc (see October 13, 2020

news release) . Now we are intersecting better gold grades, and across a much

wider interval, at 140 m depth. Although there is clearly a variation in gold values

across the structure, the increase in mineralized width with depth is very

encouraging.”

Cynthia Le Sueur -Aquin, President and CEO, commented: “ These are the initiatory

drill holes, testing a number of extensional zones to the north of the approximate 680

m by 380 m wide CRK Zone. The drill holes target these extensional zones where

2

channel sampling returned very encouraging results, but where exposure was

minimal.”

Significant assay data is presen ted in Table 1 and drill hole position and orientation

data is presented in Table 2. A plan m ap of mineralization and drill sections are

presented in Figure 1.

Table 1: Significant assay results, LME20-022 to LME20-025

Hole ID From

(m)

To (m) Length

(m)

Gold

(g/t)

Silver

(g/t)

Copper

(wt%)

Zinc

(wt%)

LME20-022 31.71 33.40 1.69 0.10 7.56 0.15 2.40

LME20-023 38.50 39.00 0.50 0.13 6.70 0.18 3.46

LME20-023 50.26 50.87 0.61 0.48 0.25 0.00 0.02

LME20-023 74.50 75.00 0.50 0.40 0.25 0.00 0.01

LME20-023 147.85 148.35 0.50 0.13 11.00 0.24 0.03

LME20-023 177.59 181.10 3.51 0.25 0.33 0.00 0.02

LME20-024 14.00 16.00 2.00 2.75 17.70 1.28 0.26

LME20-024 52.50 53.00 0.50 0.73 0.50 0.00 0.02

LME20-024 113.70 114.86 1.16 0.55 0.25 0.00 0.01

LME20-024 158.50 159.00 0.50 2.22 0.80 0.00 0.02

LME20-024 167.50 168.84 1.34 0.13 7.30 0.18 2.03

LME20-024 202.50 210.50 8.00 0.26 0.45 0.01 0.02

LME20-024 227.00 228.00 1.00 0.65 1.30 0.03 0.02

LME20-025 4.40 5.25 0.85 0.31 1.00 0.09 1.86

LME20-025 25.00 33.03 8.03 0.02 0.75 0.01 0.28

LME20-025 89.50 90.20 0.70 1.22 0.50 0.00 0.02

LME20-025 191.55 205.80 14.25 10.98 3.07 0.08 0.24

Including 191.55 193.00 1.45 0.02 0.54 0.08 0.04

And 193.00 195.00 2.00 0.14 2.05 0.31 0.15

And 195.00 198.00 3.00 0.02 0.37 0.05 0.03

And 198.00 199.00 1.00 152.00 31.80 0.02 0.02

And 199.00 201.00 2.00 0.04 0.38 0.03 0.02

And 201.00 202.00 1.00 3.90 0.83 0.01 0.03

And 202.00 205.30 3.30 0.03 0.25 0.01 0.07

And 205.30 205.80 0.50 0.13 7.20 0.24 5.28

LME20-025 287.00 291.00 4.00 0.04 2.26 0.05 1.50

LME20-025 327.00 329.00 2.00 0.77 0.95 0.01 0.02

Note: Mineralization is subvertical and the true width of mineralization is estimated at >60% of the drill

hole interval.

Table 2: Collar position, orientation and depth of diamond drill holes

Hole ID Easting Northing Elevation

(m)

Depth

(m)

Azimuth

(°)

Dip (°)

LME20-022 445452 5512254 323 85 70 -50

LME20-023 445452 5512255 322 200 110 -50

LME20-024 445520 5512231 322 254 110 -50

LME20-025 445483 5512006 324 377 290 -50

3

Coordinates are presented in UTM NAD83 Zone 16N.

Technical discussion

The CRK Zone, which was trenched and exposed in 2019, two distinct styles of

mineralization: an early, likely syn -volcanic, zinc-dominant hydrothermal system,

termed the Ishkoday -style mineralization; and a later, gold -dominant event that is

linked primarily to later tectonic gold -silver bearing quartz veins, termed the

Sturgeon River -style mineralization. Magnetite is associat ed with the higher -grade

zinc mineralized zones.

Surficial mapping and channel sampling of the trenched CRK outcrop documented

two orientations of Ishkoday -style mineralization including N - and NE -striking.

Sturgeon River-style veins and shear zones cut these early structures and remobilize

and enrich the early Ishkoday-style mineralization.

These two mineralizing systems have been intersected in drill core and were oriented

using Boart/LongyearTM TruCoreTM. The orientation of structures, including veins and

shear zones, was validated with the relative position on drill core of a lower

reference line, measured using alpha and beta (α / ß) angles, and converted into

strike and dip measurements. These measurements, in conjunction with surficial

measurements, were used to plot structures in sections and in 3D.

Reclassification of the Joe and Akhi structures

Ishkoday-style mineralization is generally defined as early (synvolcanic ) polymetallic

veins associated with actinolite and magnetite, whereas Sturgeon River style veins

are late gold and silver -bearing quartz veins and shear zones that cut the earlier

mineralization. On surface, the north-trending Joe and northeast-trending Akhi veins

host gold, silver, copper and zinc ( Figure 1). At depth in hole LME20-025, gold and

zinc mineralization in the Joe vein do not occur together and gold mineralization

occurs in a shear zone. Along trend of the Akhi vein to the northeast, the styl e of

mineralization changes from sheared actinolite/magnetite to a rotated and shear -

hosted quartz vein at the Sturgeon granitoid contact . In both cases, these

mineralized structures, although likely initially formed as Ishkoday-style, synvolcanic,

polymetallic veins, are reclassified as shear zones.

This distinction is important for the following reasons:

 Reactivated structures are subject to metal enrichment

 Shear zones may increase in width or grade, especially at rock contacts

 Shear zones have the potential to intersect pre -existing veins, increasing total

width of mineralization

Qualified Person

Mr. David Lewis, P. Geo. (PGO), LAURION ’s Exploration Manager, is a Qualified

Person as defined by National Instrument 43 -101 and has reviewed and approved

the content of this news release.

4

Channel samples are individually cut, perpendicular to mineralization, using a

double-bladed saw to specific lengths. Samples are cut to approximately 5 cm

width and 10 cm depth, with individual samples weighing approximately 1.5 to 4 kg.

Channel samples are inserted into individual plastic bags, labelled and containing

unique sample tags, and sealed. Aluminum tags with the sample tag information are

inserted at the beginning of each channel sample cut. Collected field data includes

sample number, channel azimuth, sample length, rock type and GPS UTM

coordinates. Samples are catalogued and industry -standard Quality

Assurance/Quality Control (QA/QC) samples are added, including standards,

duplicates and blanks, in a pre -established order. Samples are then sealed in nylon

bags and shipped by LAURION personnel to the ALS facility in Thunder Bay, Ontario.

All core and channel samples have been assayed by ALS La boratories in Thunder

Bay, Ontario. Samples are processed by 4 -acid digestion and analyzed by fire assay

on 50 g pulps and ICP -AES (Inductively -Coupled-Plasma – Atomic-Element-

Spectroscopy). Over limit analyses are reprocessed with gravimetric finish.

About LAURION Mineral Exploration Inc.

The Corporation is a junior mineral exploration and development company listed on

the TSX-V under the symbol LME and on the OTCPINK under the symbol LMEFF. The

Corporation currently has 19 8,718,522 outstanding shares, of which approximately

71% of LAURION’s issued and outstanding shares are owned and controlled by

Insiders who are eligible investors under the “Friends and Family” categories.

LAURION's emphasis is on the development of its flagship project, the 100% own ed

mid-stage 47 km 2 Ishkoday Project, and its gold -silver and gold -rich polymetallic

mineralization with a significant upside poten tial. The mine ralization on Ishkoday is

open at depth beyond the current core -drilling limit of -200 m from surface, based

on the historical mining to a -685 m depth, in the past producing Sturgeon River

Mine. The recently acquired Brenbar Property, which is contiguous with the Ishkoday

Property, hosts the historic Brenbar Mine and LAURION believes that the

mineralization to be a direct extension of mineralization from the Ishkoday Property.

FOR FURTHER INFORMATION, CONTACT:

LAURION Mineral Exploration Inc.

Cynthia Le Sueur-Aquin – President and CEO

Tel: 1-705-788-9186

Fax: 1-705-805-9256

Website: http://www.LAURION .ca

Caution Regarding Forward-Looking Information

This press release contains forward -looking statements, which reflect the Corporation’s current

expectations regarding future events, including with respect to LAURION's business, operations and

condition, and managem ent's objectives, strategies, beliefs and intentions. The forward -looking

statements involve risks and uncertainties. Actual events and future results, performance or

achievements expressed or implied by such forward -looking statements could differ materia lly from

those projected herein including as a result of a change in the trading price of the common shares of

LAURION, the interpretation and actual results of current exploration activities, changes in project

5

parameters as plans continue to be refined, future prices of gold and/or other metals, possible

variations in grade or recovery rates, failure of equipment or processes to operate as anticipated, the

failure of contracted parties to perform, labor disputes and other risks of the mining industry, del ays in

obtaining governmental approvals or financing or in the completion of exploration, as well as those

factors disclosed in the Corporation’s publicly filed documents. Investors should consult the

Corporation’s ongoing quarterly and annual filings, as well as any other additional documentation

comprising the Corporation’s public disclosure record, for additional information on risks and

uncertainties relating to these forward -looking statements. The reader is cautioned not to rely on these

forward-looking statements. Subject to applicable law, the Corporation disclaims any obligation to

update these forward-looking statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED

IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR

ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.