Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LME.V ·

LAURION Announces High-Grade Gold Intercepts of 5.25 m grading 7.29 g/t Au, including 0.50 m grading 68.50 g/t Au, and 1.95 m grading

Drill Results

1

LAURION Announces High-Grade Gold Intercepts of 5.25 m grading

7.29 g/t Au, including 0.50 m grading 68.50 g/t Au, and 1.95 m grading

2.370 g/t Au, including 0.95 m @ 4.50 g/t Au in the 2024 Fall Drill

Campaign at Ishkõday Project

Toronto, Ontario – January 8, 2025 – LAURION Mineral Exploration Inc. (TSX-V: LME) (OTC: LMEFF)

("LAURION" or the "Corporation") is pleased to announce the results from the last three drill holes

from the Corporation’s previously-announced 2024 Fall drilling campaign, totaling 3,291 metres

(7 holes), at the Ishkõday Project, which is located 220 km northeast of Thunder Bay, in

Greenstone, Ontario.

“The latest results confirm significant mineralization, including high -grade gold intercepts,

underscoring the Ishkõday Project's potential. The Ishkõday Project covers an extensive and

highly promising area of 57 square kilometres. Our latest drill results from the Ishkõday Project

are a testament to the continuity and consistency of gold mineralization within structurally

controlled quartz vein systems,” stated Cynthia Le Sueur -Aquin, President and CEO of

LAURION. “Notable highlights include 17.47 g/t Au over 1.20 m, including 37.70 g/t Au over 0.50

m in LME24-055, as well as 6.60 g/t Au over 1.00 m within a broader interval of 3.50 m grading

2.08 g/t Au in LME24-049. We believe that these results underscore the high-grade potential of

our mineralized veins and provide further insight into the complex structural framework at

Ishkõday. We remain committed to advancing this project wit h a strategic and systematic

approach, refining our geological models and working to identify additional high-grade zones

to unlock the full potential of the Ishkõday Project.”

Highlights of Drill Results:

LME24-050

• 675.80 - 676.30 m: 0.50 m grading 11.25 g/t Au.

• 57.00 - 58.00 m: 0.95 m grading 3.02 g/t Au.

• 175.20 - 175.70 m: 0.50 m grading 3.30 g/t Au.

• 649.05 - 651.00 m: 1.95 m grading 2.37 g/t Au, including 0.95 m @ 4.50 g/t Au.

• 505.00 - 506.20 m: 1.20 m grading 1.67 g/t Au, including 0.65 m @ 2.97 g/t Au.

LME24-052

• 32.00 - 37.25 m: 5.25 m grading 7.2 9 g/t Au, including 32.50 - 33.00 m: 0.50 m grading

68.50 g/t Au.

• 131.35 - 132.35 m: 1.00 m grading 0.69 g/t Au, including 31.35 - 131.85 m: 0.50 m grading

0.96 g/t Au.

• 155.30 - 156.80 m: 1.50 m grading 0.54 g/t Au, i ncluding 155.30 - 155.80 m : 0.50 m

grading 0.84 g/t Au.

• 230.20 - 230.70 m: 0.50 m grading 0.67 g/t Au.

LME24-054

• 64.50 - 65.00 m: 0.50 m grading 0.95 g/t Au.

• 608.00 - 608.50 m: 0.50 m grading 1.34 g/t Au.

2

• 725.20 - 726.40 m: 1.20 m grading 3. 11 g/t Au, including 725.70 - 725.70 m: 0.50 m

grading 6.67 g/t Au.

• 801.00 - 802.00 m: 1.00 m grading 0.23 g/t Au.

The Fall 2024 drilling program at the Ishkõday Project expanded the strike length of the

Sturgeon River Mine Corridor from 900 m to 1,100 m , targeting 12 distinct gold -bearing veins.

Drill hole LME24-050 tested the northern extents of the No. 1, No. 2, No. 3, and Coniagas veins,

reaching a length of 675 m at an azimuth of 110° and dip of -60°.

Hole ID From (m) To (m) Core Length (m) Au (g/t)

LME24-050 55.90 59.40 3.50 1.81

including 57.05 58.00 0.95 3.02

LME24-050 70.15 71.00 0.85 0.33

LME24-050 135.00 135.50 0.50 0.85

LME24-050 175.20 176.40 1.20 2.49

including 175.20 175.70 0.50 3.30

LME24-050 191.40 191.90 0.50 1.10

LME24-050 234.40 235.40 1.00 0.49

LME24-050 349.10 349.60 0.50 1.56

LME24-050 352.00 352.50 0.50 0.39

LME24-050 396.00 397.65 1.65 1.23

including 396.00 396.90 0.90 1.51

LME24-050 423.50 424.30 0.80 0.35

LME24-050 434.60 435.50 0.90 0.85

LME24-050 505.00 506.20 1.20 0.62

LME24-050 520.75 521.25 0.50 0.46

LME24-050 594.45 595.25 0.80 0.32

LME24-050 627.70 628.40 0.70 0.37

LME24-050 643.70 645.30 1.60 0.30

including 643.70 644.30 0.60 0.70

LME24-050 648.50 651.00 2.50 1.12

including 649.05 650.00 0.95 2.37

LME24-050 675.80 676.30 0.50 11.25

Drill hole LME24- 052 targeted the M24 and M25 veins to gather downhole information, thus

refining the trajectory for drill hole LME24-053. This hole reached a length of 240 m at an azimuth

of 150° and dip of - 45°. Collectively, these targeted drilling efforts contribute to the

advancement of the Ishkõday Project and its long-term development potential.

Hole ID From (m) To (m) Core Length (m) Au (g/t)

LME24-052 32.00 37.25 5.25 7.29

including 32.50 33.00 0.50 68.50

including 34.00 37.25 3.25 1.13

LME24-052 66.40 67.00 0.60 0.37

LME24-052 97.50 98.40 0.90 0.76

LME24-052 129.40 129.90 0.50 0.42

LME24-052 131.35 132.35 1.00 0.69

including 131.35 131.85 0.50 0.96

3

Hole ID From (m) To (m) Core Length (m) Au (g/t)

LME24-052 134.00 135.00 1.00 0.46

LME24-052 155.30 156.50 1.20 0.54

including 155.30 155.80 0.50 0.80

LME24-052 194.50 195.60 1.10 0.39

including 194.50 195.00 0.50 0.72

LME24-052 230.20 231.70 1.50 0.32

including 230.20 230.70 0.50 0.67

Drill hole LME24-054 focused on the southernmost extent of the corridor, testing the M21 vein,

the newly discovered Q vein, and other key veins, reaching a final length of 815 m at an

azimuth of 115° and dip of -60°.

Hole ID From (m) To (m) Core Length

(m)

Au (g/t)

LME24-054 18.90 19.50 0.60 0.48

LME24-054 64.50 65.00 0.50 0.95

LME24-054 415.80 416.50 0.70 0.18

LME24-054 417.65 418.15 0.50 0.35

LME24-054 608.00 608.50 0.50 1.34

LME24-054 679.00 680.00 1.00 0.12

LME24-054 725.20 726.40 1.20 3.11

including 725.20 725.70 0.50 6.67

LME24-054 761.65 762.20 0.55 0.35

LME24-054 796.35 797.00 0.65 0.32

LME24-054 801.00 802.00 1.00 0.23

Exploration Significance

Within this property, LAURION’s focused drilling and fieldwork efforts have outlined a key

mineralization hosting corridor measuring 6 kilometres in length and 2.5 kilometres in width ,

comprising approximately 26.3% of the entire project area. Th e dimension of this corridor

highlights the significant scale and potential of the project.

The recent drilling program focussed on quartz veins and shear zones in previously undrilled

areas northeast and southwest of the Sturgeon River Mine Shaft. These zones were uncovered

and validated during the Corporation’s Summer 2024 Field Program through detailed stripping

and channel sampling. Prioritized for the Fall 2024 Drill Program, the initial results have

uncovered notable mineralized intervals, thereby shedding light on the geological structures

of these newly identified zones, expand ing the Corporation’s understanding of the Ishkõday

Project’s mineral potential, and increasing the Sturgeon River Mine mineralized area.

These findings emphasize the high -grade potential of the mineralized veins and enhance our

understanding of the complex structural framework at Ishkõday. LAURION remains focused on

refining its geological models and delineating further high-grade zones as part of its systematic

exploration approach. From LAURION’s perspective, the 2024 Fall Drill Program has further

advanced the Ishkõday Project toward the long-term development goals of the Corporation.

4

Sampling and QA/QC Protocols

All drill core is transported and stored inside the core facility located at the Ishkõday Project in

Greenstone, Ontario. LAURION employs an industry standard syst em of external standards,

blanks and duplicates for all of its sampling, in addition to the QA/QC protocol employed by

the laboratory. After logging, core samples were identified and then cut in half along core axis

in the same building, and then zip tied individually in plastic sample bags with a bar code.

Approximately five or six of these individual bags were then stacked into a “rice” white material

bag and stored on a skid for final shipment to the laboratory. All core samples were shipped

to the ALS f acility in Thunder Bay, which were then prepared by ALS Global Geochemistry in

Thunder Bay and analyzed by ALS Global Analytical Lab in North Vancouver, British Columbia.

Samples are processed by 4-acid digestion and analyzed by fire assay on 50 g pulps and ICP-

AES (Inductively -CoupledPlasma – AtomicElement-Spectroscopy). Over limit analyses are

reprocessed with gravimetric finish. A total of 5% blanks and 5% standard are inserted randomly

within all samples. 5% of the best assay result pulps were sent for re-assays. All QAQC were

verified, and no contamination or bias have been observed. The remaining half of the core,

as well as the unsampled core, have been stored in temporary core racks at the core logging

facility in Beardmore. The core will be moved to the core storage facility at the Ishkõday Project

in the Spring of 2025.

Qualified Person

The technical contents of this release were reviewed and approved by Jean -Philippe

Paiement, P .Geo, MSc, a consultant to LAURION, and a qualified person as defined by

National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

About LAURION Mineral Exploration Inc.

The Corporation is a mid-stage junior mineral exploration and development company listed

on the TSX Venture Exchange under the symbol LME and on the OTCPINK under the symbol

LMEFF. LAURION now has 273,494,904 outstanding shares of which approximately 7 3.6% are

owned and controlled by insiders who are eligible investors under the “Friends and Family”

categories. LAURION's emphasis is on the exploration and development of its flagship project,

the 100% owned mid -stage 57 km 2 Ishkõday Project, and its gold -rich polymetallic

mineralization.

LAURION Mineral Exploration Inc.

Cynthia Le Sueur-Aquin – President and CEO

Tel: 1-705-788-9186 Fax: 1-705-805-9256

Douglas Vass - Investor Relations Consultant

Email: [email protected]

Website: http://www.LAURION.ca

Follow us on X (@LAURION_LME), Instagram (laurionmineral) and LinkedIn

(https://www.linkedin.com/in/cynthia-le-sueur-aquin-laurion-lme-04b03017/)

Caution Regarding Forward-Looking Information

This press release contains forward-looking statements, which reflect the Corporation’s current expectations regarding

future events including with respect to LAURION's business, operations and condition, management's objectives,

strategies, beliefs and intentions, the Corporation’s ability to advance the Ishkõday Project, the nature, focus, timing

and potential results of the Corporation’s exploration, drilling and prospecting activities in 2024 , 2025 and beyond,

including the Corporation’s planned activities for the Ishkõday Project for the remainder of 2025. The forward-looking

statements involve risks and uncertainties. Actual events and future results, performance or achievements expressed

or implied by such forward-looking statements could differ materially from those projected herein including as a result

of a change in the trading price of the common shares of LAURION, the interpretation and actual results of current

exploration activities, changes in project parameters as plans continue to be refined, futu re prices of gold and/or

other metals, possible variations in grade or recovery rates, failure of equipment or processes to operate as

5

anticipated, the failure of contracted parties to perform, labor disputes and other risks of the mining industry, delays

in obtaining governmental approvals or financing or in the completion of exploration, as well as those factors disclosed

in the Corporation’s publicly filed documents. Investors should consult the Corporation’s ongoing quarterly and annual

filings, as well as any other additional documentation comprising the Corporation’s public disclosure record, for

additional information on risks and uncertainties relating to these forward-looking statements. The reader is cautioned

not to rely on these forward-looking statements. Subject to applicable law, the Corporation disclaims any obligation

to update these forward-looking statements.

All sample values are from grab sample s and channel samples, which by their nature, are not necessarily

representative of overall grades of mineralized areas. Readers are cautioned to not place undue reliance on the

assay values reported in this press release.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED IN THE

POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE

CONTENT OF THIS NEWS RELEASE.