LAURION Announces Drill Intercepts of 37.70 g/t Gold over 0.50 m, 6.60 g/t Gold over 1.00 m and 2.075 g/t Gold over 3.50 m at Ishkõday Project

Drill Results

1 | Page

LAURION Announces Drill Intercepts of 37.70 g/t Gold over 0.50 m, 6.60 g/t

Gold over 1.00 m and 2.075 g/t Gold over 3.50 m at Ishkõday Project

Toronto, Ontario – December 11, 2024 – LAURION Mineral Exploration Inc. (TSX -V: LME)

(OTC: LMEFF) ("LAURION" or the "Corporation") is pleased to announce the results of the

first four drill holes from the 2024 Fall drilling campaign, totaling 3,291 metres (7 holes), at

the Ishkõday Project, which is located 220 km northeast of Thunder Bay, in Greenstone,

Ontario.

The recent drilling program focussed on quartz veins and shear zones in previously

undrilled areas northeast of the Sturgeon River Mine Shaft. These zones were uncovered

and validated during the Corporation’s Summer 2024 Field Program through detailed

stripping and channel sampling. Prioritized for the Fall 2024 Drill Program, the initial results

have uncovered notable mineralized intervals, thereby shedding light on the geological

structures of these newly identified zones, expanded the Corporation’s understanding of

the Ishkõday Project ’s mineral potential, and increased the Sturgeon River Mine

mineralized area.

Highlights and key intersections of the drill holes are as follows:

• LME24-049 - 0.60 m grading 2.58 g/t Au and 66.9 g/t Ag from 444.00 m;

• LME24-049 - 0.50 m grading 5.53 g/t Au from 622.75 m;

• LME24-049 - 3.50 m grading 2.08 g/t Au, including 1.00 m grading 6.60 g/t Au from

711.00 m;

• LME24-051 - 0.65 m grading 2.52 g/t Au within a broader interval of 2.15 m grading 0.83

g/t Au from 220.35 m;

• LME24-053 - 1.10 m grading 1.61 g/t Au, including 0.60 m grading 2.78 g/t Au from 74.50

m;

• LME24-053 - 0.50 m grading 2.93 g/t Au from 170.80 m; and

• LME24-055 - 1.20 m grading 17.47 g/t Au , including 0.50 m grading 37.70 g/t Au from

55.80 m.

“The Ishkõday Project encompasses a vast and highly prospective land package of 57

square kilometres, within which LAURION has delineated through strategic drilling and

fieldwork a prospective corridor spanning 6 kilometres in strike length and 2.5 kilometr es

in width, representing approximately 26.3% of the total property. This corridor hosts several

occurrences from two distinct overlapping mineralized systems, emphasizing the scale

and potential of the project ,” stated Cynthia Le Sueur -Aquin, President and CEO of

LAURION.

2 | Page

“To date (inclusive of this 2024 Fall drill program, historical and modern drilling), 445 drill

holes totaling 90,009 metres, including 190 drill holes totaling 61,160 metres have been

conducted by LAURION as operator . Our consistently high success rate in intersecting

significant mineralization is a direct result of the rigorous standards applied to our

fieldwork, mapping, and 3D modeling. These efforts demonstrate our strategic and

systematic approach to exploring and unl ocking the potential of this geologically

complex and structurally controlled environment.”

Drill Hole LME24-049

Located 1,044 m northeast of the Sturgeon River Mine shaft, LME24 -049 targeted the

dilational zone of the primary sinistral shear zone associated with the Sturgeon River Mine,

the M50-series quartz veins, while intersecting multiple other quartz veins and shears.

Hole ID From (m) To (m) Core

Length (m)

Au (g/t)

LME24-049 444.00 444.60 0.60 2.580

LME24-049 523.90 524.50 0.60 1.010

LME24-049 622.75 623.25 0.50 5.530

LME24-049 651.25 651.80 0.55 2.080

LME24-049 658.65 659.15 0.50 0.714

LME24-049 698.80 699.30 0.50 0.450

LME24-049 711.00 714.50 3.50 2.075

Including 712.75 713.75 1.00 6.600

Drill Hole LME24-051

Positioned 650 m northeast of the Sturgeon River Mine shaft, LME24-051 tested the 85-M2

and 85-M3 veins.

Hole ID From

(m)

To

(m)

Core

Length (m)

Au

(g/t)

LME24-051 37.25 37.75 0.50 0.544

LME24-051 220.35 222.50 2.15 0.834

Including 221.35 222.00 0.65 2.520

LME24-051 242.50 243.50 1.00 0.318

LME24-051 295.00 298.00 3.00 0.191

Including 295.00 295.50 0.50 0.753

LME24-051 299.70 300.20 0.50 0.503

LME24-051 327.75 328.80 1.05 0.501

LME24-051 441.00 442.70 0.70 0.715

3 | Page

Drill Hole LME24-053

Located 606 m east of the Sturgeon River Mine shaft, LME24-053 intersected the targeted

intersection between the M24 and M25 quartz veins, as well as the M21 vein.

Hole ID From

(m)

To

(m)

Core

Length (m)

Au

(g/t)

LME24-053 74.50 75.60 1.10 1.610

Including 75.00 75.60 0.60 2.780

LME24-053 90.20 91.00 0.80 0.438

LME24-053 117.30 118.60 1.30 0.308

Including 117.30 117.80 0.50 0.536

LME24-053 131.40 133.00 1.60 0.315

LME24-053 136.00 136.70 0.70 0.692

LME24-053 154.00 155.00 1.00 0.565

LME24-053 156.30 158.10 1.80 0.311

Including 156.30 157.15 0.85 0.521

LME24-053 170.8 171.3 0.50 2.93

Drill Hole LME24-055

Located 591 m northeast of the Sturgeon River Mine shaft, LME24-055 targeted the 85-M2

and 85-M3 veins.

Hole ID From

(m)

To

(m)

Core

Length (m)

Au

(g/t)

LME24-055 55.80 57.00 1.20 17.47

Including 56.50 57.00 0.50 37.70

LME24-055 120.10 120.60 0.50 0.308

LME24-055 136.80 137.30 0.50 2.090

LME24-055 155.65 156.70 1.05 0.300

Exploration Significance

The results from these drill holes located in new areas northeast of the Sturgeon River Mine

shaft, underscore the continuity and the consistent presence of gold mineralization at

the Ishkõday Project , particularly in structurally controlled quartz vein sy stems. Notably,

the high- grade intercept of 37.70 g/t Au in LME24- 055 demonstrates the high- grade

potential of the veins, in this case the 85-M2 vein.

These results reinforce our growing understanding of the complex structural framework at

Ishkõday and highlight the potential for further high -grade gold discoveries within this

mineralized system. LAURION continues to advance its exploration program with a focus

on refining its geological model and delineating additional high-grade zones.

LAURION is confident that its Fall 2024 Drill Program has contributed to the advancement

of the Ishkõday Project towards future development.

4 | Page

Sampling and QA/QC Protocols

All drill core is transported and stored inside the core facility located at the Ishkõday

Project in Greenstone, Ontario. LAURION employs an industry standard system of external

standards, blanks and duplicates for all of its sampling, in addition to the QA/QC protocol

employed by the laboratory. After logging, core samples were identified and then cut in

half along core axis in the same building, and then zip tied individually in plastic sample

bags with a bar code. Approximately five or six of these individual bags were then

stacked into a “ rice” white material bag and stored on a skid for fi nal shipment to the

laboratory. All core samples were shipped to the ALS facility in Thunder Bay, which were

then prepared by ALS Global Geochemistry in Thunder Bay and analyzed by ALS Global

Analytical Lab in North Vancouver, British Columbia. Samples are processed by 4 -acid

digestion and analyzed by fire assay on 50 g pulps and ICP -AES (Inductively-Coupled-

Plasma – AtomicElement-Spectroscopy). Over limit analyses are reprocessed with

gravimetric finish. A total of 5% blanks and 5% standard are inserted randomly within all

samples. 5% of the best assay result pulps were sent for re-assays. All QAQC were verified,

and no contamination or bias have been observed. The remaining half of the core, as

well as the unsampled core, have been stored in temporary core racks at the core

logging facility in Beardmore. The core will be moved to the core storage facility at the

Ishkõday Project in the Spring of 2025.

Qualified Person

The technical contents of this release were reviewed and approved by Jean -Philippe

Paiement, PGeo, MSc, a consultant to LAURION, and a qualified person as defined by

National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

About LAURION Mineral Exploration Inc.

The Corporation is a junior mineral exploration and development company listed on the

TSX Venture Exchange under the symbol LME and on the OTCPINK under the symbol

LMEFF. LAURION now has 273,494,904 outstanding shares of which approximately 72% are

owned and controlled by insiders who are eligible investors under t he “Friends and

Family” categories.

LAURION's emphasis is on the exploration and development of its flagship project, the

100% owned mid- stage 57 km 2 Ishkõday Project, and its gold -rich polymetallic

mineralization.

FOR FURTHER INFORMATION, CONTACT:

LAURION Mineral Exploration Inc.

Cynthia Le Sueur-Aquin – President and CEO

Tel: 1-705-788-9186 Fax: 1-705-805-9256

Douglas Vass - Investor Relations Consultant Email: [email protected]

Website: http://www.LAURION.ca

5 | Page

Follow us on X (@LAURION_LME), Instagram (laurionmineral) and LinkedIn

(https://www.linkedin.com/in/cynthia-le-sueur-aquin-laurion-lme-04b03017/)

Caution Regarding Forward-Looking Information

This press release contains forward -looking statements, which reflect the Corporation’ s current expectations regarding

future events including with respect to LAURION's business, operations and condition, management's objectives, strategies,

beliefs and intentions, the Corporation’s ability to advance the Ishkõday Project, the nature, focus, timing and potential

results of the Corporation’s exploration, drilling and prospecting activities in 2024 and beyond, including its Fall 2024 drilling

program and the Corporation’s other planned activities for the Ishkõday Project for the remainder of 2024. The forward-

looking statements involve risks and uncertainties. Actual events and future results, performance or achievements

expressed or implied by such forward-looking statements could differ materially from those projected herein including as

a result of a change in the trading price of the common shares of LAURION, the interpretation and actual results of current

exploration activities, changes in project parameters as plans continue to be refined, future prices of gold and/or other

metals, possible variations in grade or recovery rates, failure of equipment or processes to operate as anticipated, the

failure of contracted parties to perform, labor disputes and other risks of the mining industry, delays in obtaining

governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in the

Corporation’s publicly filed documents. Investors should consult the Corporation’s ongoing quarterly and annual filings, as

well as any other additional documentation comprising the Corporation’ s public disclosure record, for additional

information on risks and uncertainties relating to these forward-looking statements. The reader is cautioned not to rely on

these forward-looking statements. Subject to applicable law, the Corporation disclaims any obligation to update these

forward-looking statements. All sample values are from grab sa mples and channel samples, which by their nature, are

not necessarily representative of overall grades of mineralized areas. Readers are cautioned to not place undue reliance

on the assay values reported in this press release.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES

OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS

NEWS RELEASE.