LITH.V ·

Lithium Chile Samples up to 555 Mg/Lts Lithium and Obtains a Maiden Lithium Resource Estimate of 1,420,000 Tonnes of Lithium Carbonate Equivalent ON Its First Test Well, Salar de Arizaro Project, Salta Province, Argentina

Exploration Programs Sampling & Geoscience Results

LITHIUM CHILE SAMPLES UP TO 555 MG/LTS LITHIUM AND OBTAINS A MAIDEN

LITHIUM RESOURCE ESTIMATE OF 1,420,000 TONNES OF LITHIUM CARBONATE

EQUIVALENT ON ITS FIRST TEST WELL, SALAR DE ARIZARO PROJECT, SALTA

PROVINCE, ARGENTINA

TSX Venture Exchange: LITH For Immediate Release

OTC-BB: LTMCF

CALGARY, ALBERTA, February 8, 2022 – Lithium Chile Inc. (“Lithium Chile” or the

“Company”) is pleased to report an initial lithium (“Li”) resource statement for its first test well

in the Arizaro de Salar project. The NI 43-101 resource statement, detailed in Table 3.2 below,

includes 1,420,000 tonnes of lithium carbonate (“Li2CO3”) equivalent in the Indicated and

Inferred Resource categories.

Steve Cochrane, President and CEO of Lithium Chile, commented on the maiden resource for

the Arizaro de Salar Project: “We are very excited to see a strong NI 43-101 resource estimate

from our hydrogeological consultants. The Company has adopted an aggressive plan which

includes a follow up phase 2 drilling program consisting of three, 500-metre-deep exploration

holes aimed at expanding the lithium resource and improving the grade on the Arizaro property.”

Highlights from the Test Well

 1,420,000 tonne, NI 43-101 compliant lithium carbonate equivalent resource;

 Grades as high as 555 mg/litre, higher than average in the Salar;

 21.94 litres per second average pumping rate, higher than average in the Salar;

 Resource estimate from only 29% of the main concession block leaving abundant area for

resource expansion;

 NI 43-101 report recommends a second program of US $2 million and three holes aimed

at:

o Establishing a measured resource

o Significantly increase the lithium carbonate equivalent resource.

Summary of the Salar de Arizaro Project:

 The Project is located in the Arizaro Salar located in the Salta province of northwest

Argentina - about 170 kilometers (km) from Salta. Salta is considered the best

investment district in the Lithium Triangle according to the Fraser Institute.

 Lithium Chile controls 23,300 ha of legal concessions located mainly in the central

part of the salar which is strategically located close to the best water supply area.

 Arizaro is the largest salar in Argentina and one of the most important in all of

Puna Region - becoming an important new mining area because of the success of

recent lithium projects.

 The railway between Salta and the Antofagasta port passes over the Arizaro Salar

very close to Lithium Chile’s concessions.

 An initial resource estimate just in a limited portion of concessions totaled

1,420,000 tonnes of lithium carbonate equivalent consisting of 895,000 tonnes of

Indicated Resources together with 535,000 tonnes of Inferred lithium carbonate

equivalent. The resource report suggests that resources in the measured category

will be established by additional drilling which will also increase the indicated and

inferred volumes appreciably.

 Pump testing included step-discharge and constant discharge tests which achieved

an average pumping rate of 21.94 litres per second and transmissivity of 100 m 2/d

which is considered very good in comparison with other salars in the region.

 Several brine samples were collected from the initial test well, known as Argento-1,

During the drilling of the well, during testing of the overall aquifer, and

subsequently over specific intervals in the reservoir using a Hydra-sleeve and

inflatable packers, permitted Lithium Chile to obtain depth-specific samples.

 Hydra-sleeve samples yielded values up to 446 mg/l of Li. Using the inflatable

packer system, lithium samples returned values up to 555 mg/ls.

 Based on potential dilutions and grade shown during pump testing, an average of

298 mg/lt of Li was used in resources calculation.

 Lithium Chile plans on a follow up phase 2 program of three 500 meter deep

exploration holes aimed at expanding the lithium resource on the Arizaro property.

The program is budgeted at $2,000,000 US and is scheduled to commence

immediately.

 Lithium Chile is conducting operations through its Argentinian subsidiary

Argentum Lithium. Argentum Lithium has fostered a good relationship with local

communities within the region through its “Shared Value Philosophy”. It has strong

relationships with Tolar Grande, the closest town which is the last inhabited point in

the province on the frontier with Chile.

Background

The Project is located in the Arizaro “salar” in the Salta province, in northwest Argentina, about

170 kilometers (km) from Salta, and approximately 38 kilometers (km) southwest of the town of

Tolar Grande. The Project is in the Argentinean Puna, at an elevation of approximately 3,475

meters above mean sea level (amsl).

The Arizaro Project currently consists of seven Exploration and Exploitation Concessions

(minas) and Exploration Permits (cateos) totaling 23,300 hectares.

Main infrastructure in the zone consist in an electrical power line (375 kilovolts (KV)), a natural

gas pipeline (Gasoducto de la Puna) between Salta (Argentina) and Mejillones (Chile) and a

railway between Antofagasta (Chile) and Salta (Argentina).

Salars near the Project area includes: Hombre Muerto, Antofalla, Ratones, Pocitos, Centenario,

and Diablillos and Atacama. The Arizaro Salar occupies one of these endorheic (internally

drained) basins.

Salar de Arizaro is a mature salar, and the largest salars in the Argentinean altiplano. A thick

halite core exists in the basin. Basin margins are interpreted to be fault controlled.

Drilling activities for exploration well Argento-1 started on September 5, 2021, reaching a depth

of 470 meters below land surface (bls) on November 28, 2021. Pumping tests were conducted at

exploration well Argento-1 in December 2021, and included step-discharge and constant

discharge tests.

The ranges of the specific yield values obtained from the BMR survey are reasonable and

consistent with values for similar units defined in other altiplanic salars for different projects.

Samples were taken both during drilling, during the pumping test, and after well construction.

Pumped samples obtained at variable depths during drilling using a downhole sampling pump,

 Brine samples obtained during and at the end of the pumping test in exploration well

Argento-1,

 Hydrasleeve samples obtained at specific depths after the well was cased, and

 Packer samples obtained after the wells was cased.

Although freshwater studies have yet to be conducted, Lithium Chile has a concession (ChasCha

Sur) on the edge of the basin in the southeast part of the salar that is adjacent to a known area of

fresh water. Based on the initial results of exploration to date, additional exploration activities

are justified to better characterize the extent of the observed brine aquifer – especially the clastic

unit underlying the massive halite. Additional drilling and testing will allow for expansion of the

estimated lithium resource and will support estimation of a reserve in the future.

Figure Error! No text of specified style in document.-1. Location Map of the Project Concession Areas

Figure Error! No text of specified style in document.-2. Digital Elevation Model of the Puna Showing Several

Salars

Figure Error! No text of specified style in document.-3. Railroad Line from Mejillones to Salta

Table Error! No text of specified style in document.-1. Summary of Lithologic Descriptions for Drill Cuttings

Samples

From To Summary Log

0 304 Crystalline halite

304 364 Crystalline halite with some

sand interbeds

364 408 Fine sand with volcaniclastics

and interbedded with halite

408 470 Fine brown sand

Pumping tests included step-discharge and constant discharge tests. Pumping test equipment

was provided by drilling and testing contractor Andina Perforaciones, a local drilling

contractor based in Salta, Argentina.

Table Error! No text of specified style in document.-2. Summary of the Step-Discharge Test at Exploration

Well Argento-1

Well Identifier Test Date Step Average Pumping Rate

(L/s)1

Maximum

Drawdown

(meters)

Specific

Capacity

(L/s/m)2

Argento-1 22/12/2021

1 5.6 6.54 0.86

2 10.6 11.38 0.93

3 22.7 26.54 0.86

1 L/s = liters per second

2 L/s/m = liters per second per meter of drawdown

Specific capacity of a well is computed by dividing the average pumping rate by the

maximum water level drawdown at that rate and is expressed as liters per second per meter of

drawdown (L/s/m).

Table Error! No text of specified style in document.-3. Pumping test summary for exploration well Argento-1

Well

Identifier

Date

Pumping

Started

Pumping /

Recovery

Duration

(hours)

Pre-Pumping

Water Level

(meters, bls)1

Average

Pumping

Rate

(L/s)2

Drawdown

After 17 Hours

of Pumping

(meters)

Residual

Drawdown

After 1.09

Hours Of

Recovery

(meters)

Specific

Capacity

(L/s/m)3

Argento-1 20-12-2021 17.40 / 1.09 4.07 21.94 29.96 3.78 0.73

1 meters, bls = meters below land surface

2 L/s = liters per second

3 L/s/m = liters per second per meter of drawdown

Calculated transmissivities for both the drawdown and recovery periods agree.

A summary of computed aquifer parameters is given in Table Error! No text of

specified style in document.-4 showing pumping rates world class for salars in region

Table Error! No text of specified style in document.-4. Summary of Computed Aquifer Parameters at Well

Argento-1

Pumped Well

Identifier

Average

Pumping

Rate

(L/s)1

Cooper-Jacob (1946)

Drawdown Method

Transmissivity

(m2/d)3

Theis (1935) Recovery

Method