Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LIO.V ·

Lion One Updates Drill Results at Tuvatu High grade composite results increased in Zone 5 drilling

Drill Results

Lion One Updates Drill Results at Tuvatu

High grade composite results increased in Zone 5 drilling

North Vancouver, British Columbia--(Newsfile Corp. - August 15, 2023) -

Lion One Metals Limited

(TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO)

("Lion One" or the "Company")

is issuing an update on

composite drill results reported in the Company's

August 10, 2023

news release.

The August 10, 2023 news release reported infill and grade control drill results from Zone 5 of the

Company's Tuvatu alkaline gold project in Fiji. Several composite gold grades reported in that news

release are here updated.

Gold analysis at Tuvatu is conducted using fire assay with an atomic absorption (AA) finish. Samples

that return grades over 10 g/t Au are then re-analyzed by gravimetric method. The gravimetric method is

considered more accurate than fire assay for high-grade samples. Lion One has therefore recently

adopted a new protocol whereby gravimetric results are reported for samples that return over 10 g/t Au.

In the August 10, 2023 news release, composite intervals were calculated using fire assay values rather

than gravimetric values, whereas high-grade individual assays were quoted using the more accurate

gravimetric results. This led to a discrepancy between the composite values and the underlying assay

values for certain intervals. The difference between fire assay and gravimetric analyses tends to be

greater for higher grade samples. A total of 21 composite values have been updated and are presented

in Table 1 below. The majority of the updated results are greater than was initially reported.

Table 1. Updated composite intervals from Zone 5 infill and grade control drilling.

Bolded text

represents a positive change, italicized text represents a negative change. Intervals are ordered by

decreasing gold content.

Hole ID

From

To

Interval (m)

Updated Au (g/t)

Original Au (g/t)

Change (g/t)

TGC-0067

48.2

50

1.8

314.27

261.93

52.34

TUDDH-643

242.7

249.3

6.6

83.47

80.78

2.69

TGC-0067

53.3

54.2

0.9

104.00

93.05

10.95

TUDDH-643

111.6

114.9

3.3

18.40

17.48

0.92

TUDDH-643

161.7

163.2

1.5

16.13

15.96

0.17

TUDDH-638

254.7

257

2.3

10.25

9.41

0.84

TUDDH-643

101.9

103.1

1.2

13.50

13.13

0.37

TUDDH-643

123.4

124

0.6

25.19

25.95

-0.76

TGC-0061

219.2

220.4

1.2

10.31

8.32

1.99

TUDDH-637

45.3

45.6

0.3

35.98

36.2

-0.22

TUDDH-643

52.2

52.5

0.3

31.87

33.51

-1.64

TUDDH-644

55.8

58.2

2.4

3.43

3.4

0.03

TGC-0065

53.1

55.2

2.1

3.91

3.82

0.09

TUDDH-634

49.2

50.7

1.5

5.44

5.68

-0.24

TUDDH-637

216.4

217

0.6

11.63

10.99

0.64

TGC-0065

128.5

129.4

0.9

7.42

6.8

0.62

TGC-0065

57.4

58.3

0.9

7.01

6.88

0.13

TUDDH-634

154.9

155.2

0.3

14.96

15.17

-0.21

TUDDH-656

173.6

173.9

0.3

11.66

10.14

1.52

TGC-0059

220.3

220.6

0.3

10.87

12.85

-1.98

TGC-0058

133.4

133.7

0.3

10.86

10.37

0.49

Tables 2 and 3 below are reproductions of Tables 1 and 2 from the

August 10, 2023

news release

updated to include composite intervals calculated using assay results from the gravimetric method.

Composite values that have been changed are highlighted with bolded text representing positive

changes and italicized text representing negative changes. Values with no bolding or italicization

represent intervals for which there is no change.

Table 2. Highlights of composited infill drill results in the Zone 5 area

. Reproduction of Table 1

from the August 10, 2023 news release, with updated composite grades. For full results see Table 4 in

the appendix.

Hole ID

From

To

Interval (m)

Au (g/t)

Change (g/t)

TUDDH-634

123.4

124

0.6

25.19

-0.76

TUDDH-637

161.7

163.2

1.5

16.13

0.17

including

161.7

162.3

0.6

38.62

-

which includes

161.7

162

0.3

72.46

-

TUDDH-637

198.2

202.1

3.9

5.38

-

including

198.2

198.5

0.3

10.02

-

and

199.7

200.6

0.9

3.42

-

and

201.2

202.1

0.9

16.13

-

which includes

201.8

202.1

0.3

40.21

-

TUDDH-643

111.6

114.9

3.3

18.4

0.92

including

111.6

113.7

2.1

28.44

-

which includes

113.1

113.7

0.6

95.63

-

TUDDH-643

242.7

249.3

6.6

83.47

2.69

including

242.7

246.3

3.6

17.39

-

which includes

243.9

245.7

1.8

55.49

-

which includes

243.9

244.5

0.6

79.84

-

and

245.1

245.7

0.6

14.89

-

and also including

247.5

249.3

1.8

271.14

-

which includes

247.5

247.8

0.3

40.03

-

and

248.7

249.6

0.6

793.24

-

TUDDH-643

254.7

257

2.3

10.25

0.84

including

254.7

255.3

0.6

35.54

-

TUDDH-650

192.6

194.1

1.5

14.93

-

including

192.6

193.5

0.9

23.89

-

TUDDH-650

203.5

207.4

3.9

11.84

-

including

203.5

204.7

1.2

35.18

-

which includes

203.5

204.1

0.6

48.27

-

and

204.1

204.7

0.6

22.09

-

TUDDH-651

184.6

185.2

0.6

32.65

-

TUDDH-651

194.5

197.2

2.7

17.2

-

including

194.5

196

1.5

25.92

-

which includes

195.4

195.7

0.3

124.52

-

and also including

196.9

197.2

0.3

25.22

-

TUDDH-653

53

56.9

3.9

9.53

-

including

55.1

56.9

1.8

19.47

-

which includes

56

56.3

0.3

46.92

-

and

56.6

56.9

0.3

55.08

-

TUDDH-653

89.5

96.3

6.8

9.96

-

including

91.3

92.2

0.9

66.62

-

which includes

91.6

91.9

0.3

165.95

-

and

91.9

92.2

0.3

30.46

-

TUDDH-655

96.4

97.9

1.5

8.24

-

including

96.7

97

0.3

18.48

-

and

97.6

97.9

0.3

20.77

-

TUDDH-656

101.9

103.1

1.2

13.5

0.37

including

101.9

102.5

0.6

19.73

-

and

102.5

103.1

0.6

6.54

-

Table 3. Highlights of composited grade control drill results in the Zone 5 area

. Reproduction of

Table 2 from the August 10, 2023 news release, with updated composite grades. For full results see

Table 5 in the appendix.

Hole ID

From

To

Interval (m)

Au (g/t)

Change (g/t)

TGC-0059

57.4

58.3

0.9

7.01

0.13

including

57.4

57.7

0.3

12.89

-

and

58

58.3

0.3

8.14

-

TGC-0061

55.8

58.2

2.4

3.43

0.03

including

57.3

37.6

0.3

12.84

-

TGC-0065

45.3

45.6

0.3

35.98

-0.22

TGC-0065

49.2

50.7

1.5

5.44

-0.24

including

49.2

49.5

0.3

9.59

-

and

50.4

50.7

0.3

15.76

-

TGC-0065

52.2

52.5

0.3

31.87

-1.64

TGC-0067

48.2

50

1.8

314.27

52.34

including

48.8

49.4

0.6

934.91

-

which includes

48.8

49.1

0.3

1839.55

-

and

49.1

49.4

0.3

30.26

-

TGC-0067

53.3

54.2

0.9

104

10.95

including

53.3

53.9

0.6

155.68

-

which includes

53.3

53.6

0.3

10.89

-

and

53.6

53.9

0.3

300.47

-

Figure 1. Location of Zone 5 Infill and Grade Control Drillholes.

Reproduced from August 10, 2023

news release for context. Left image: Plan view of Tuvatu showing Zone 5 infill and grade control

drillholes in relation to the mineralized lodes. Drillholes are shown in black, mineralized lodes in pale

grey, and underground developments in red. The yellow dashed square represents the area illustrated in

the image on the right. Right image: Oblique view of Zone 5 infill and grade control drilling looking

approximately northeast. Infill drilling was conducted from surface whereas grade control drilling was

conducted from underground.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/177254_5cfe2f3d644c0822_001full.jpg

Figure 2. Location of High-Grade Intercepts from Zone 5 Drilling.

Updated figure from the August

10, 2023 news release, with updated composite gold intervals. Composite intervals with grades

between 3 and 10 g/t Au are shown in yellow, intervals with grades between 10 and 30 g/t Au are shown

in red, and intervals over 30 g/t Au are shown in purple. Select high-grade intervals are identified. Image

is looking approximately north-northeast, grades are gold grades in g/t.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/177254_5cfe2f3d644c0822_002full.jpg

About Tuvatu

The Tuvatu Alkaline Gold Project is located on the island of Viti Levu in Fiji. The January 2018 mineral

resource for Tuvatu as disclosed in the technical report "Technical Report and Preliminary Economic

Assessment for the Tuvatu Gold Project, Republic of Fiji", dated September 25, 2020, and prepared by

Mining Associates Pty Ltd of Brisbane Qld, comprises 1,007,000 tonnes indicated at 8.50 g/t Au

(274,600 oz. Au) and 1,325,000 tonnes inferred at 9.0 g/t Au (384,000 oz. Au) at a cut-off grade of 3.0

g/t Au.

The technical report is available on the Lion One website at

www.liononemetals.com

and on the

SEDAR website at

www.sedar.com

.

Qualified Person

In accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-

101"), Sergio Cattalani, P.Geo, Senior Vice President Exploration, is the Qualified Person for the

Company and has reviewed and is responsible for the technical and scientific content of this news

release.

QAQC Procedures

Lion One adheres to rigorous QAQC procedures above and beyond basic regulatory guidelines in

conducting its sampling, drilling, testing, and analyses. The Company utilizes its own fleet of diamond

drill rigs, using PQ, HQ and NQ sized drill core rods. Drill core is logged and split by Lion One personnel

on site. Samples are delivered to and analyzed at the Company's geochemical and metallurgical

laboratory in Fiji. Duplicates of all samples with grades above 0.5 g/t Au are both re-assayed at Lion

One's lab and delivered to ALS Global Laboratories in Australia (ALS) for check assay determinations.

All samples for all high-grade intercepts are sent to ALS for check assays. All samples are pulverized to

85% passing through 75 microns. Gold analysis is carried out using fire assay with an AA finish.

Samples that have returned grades greater than 10.00 g/t Au are then re-analyzed by gravimetric

method. For samples that return greater than 0.50 g/t Au, repeat fire assay runs are carried out and

repeated until a result is obtained that is within 10% of the original fire assay run. Lion One's laboratory

can also assay for a range of 71 other elements through Inductively Coupled Plasma Optical Emission

Spectrometry (ICP-OES), but currently focuses on a suite of 9 important pathfinder elements. All

duplicate anomalous samples are sent to ALS labs in Townsville QLD and are analyzed by the same

methods (Au-AA26, and Au-GRA22 where applicable). ALS also analyses 33 pathfinder elements by

HF-HNO3-HClO4 acid digestion, HCl leach and ICP-AES (method ME-ICP61).

About Lion One Metals Limited

Lion One's flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project,

located on the island of Viti Levu in Fiji. Lion One envisions a low-cost high-grade underground gold

mining operation at Tuvatu coupled with exciting exploration upside inside its tenements covering the

entire Navilawa Caldera, an underexplored yet highly prospective 7km diameter alkaline gold system.

Lion One's CEO Walter Berukoff leads an experienced team of explorers and mine builders and has

owned or operated over 20 mines in 7 countries. As the founder and former CEO of Miramar Mines,

Northern Orion, and La Mancha Resources, Walter is credited with building over $3 billion of value for

shareholders.

On behalf of the Board of Directors of Lion One Metals Limited

"

Walter Berukoff

", Chairman and CEO

Contact Investor Relations

Toll Free (North America) Tel: 1-855-805-1250

Email:

[email protected]

Website:

www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider accepts responsibility

for the adequacy or accuracy of this release

This press release may contain statements that may be deemed to be "forward-looking statements"

within the meaning of applicable Canadian securities legislation. All statements, other than

statements of historical fact, included herein are forward-looking information. Generally, forward-

looking information may be identified by the use of forward-looking terminology such as "plans",

"expects" or "does not expect", "proposed", "is expected", "budget", "scheduled", "estimates",

"forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words

and phrases, or by the use of words or phrases which state that certain actions, events or results may,

could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals

Limited's current beliefs and is based on information currently available to Lion One Metals Limited

and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include,

but are not limited to, the actual results of exploration projects being equivalent to or better than

estimated results in technical reports, assessment reports, and other geological reports or prior

exploration results. Forward-looking information is subject to known and unknown risks, uncertainties

and other factors that may cause the actual results, level of activity, performance or achievements of

Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied

by such forward-looking information. Such risks and other factors may include, but are not limited to:

the stage development of Lion One Metals Limited, general business, economic, competitive,

political and social uncertainties; the actual results of current research and development or

operational activities; competition; uncertainty as to patent applications and intellectual property

rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals;

changes in legislation, including environmental legislation, affecting mining, timing and availability of

external financing on acceptable terms; not realizing on the potential benefits of technology;

conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals.

Although Lion One Metals Limited has attempted to identify important factors that could cause actual

results to differ materially from those contained in forward-looking information, there may be other

factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should

not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake

to update any forward-looking information, except in accordance with applicable securities laws.

Appendix 1: Full Drill Results and Collar Information

Table 4

. Updated composite results from infill drillholes in the Zone 5 area (grade >0.5 g/t Au). Bolded

text indicates a positive change from the originally reported value, italicized text represents a negative

change.

Hole ID

From

To

Interval (m)

Au (g/t)

Change (g/t)

TUDDH-634

92.2

92.8

0.6

0.52

-

TUDDH-634

93.7

94.3

0.6

0.5

-

TUDDH-634

123.4

124

0.6

25.19

-0.76

TUDDH-634

125.2

125.5

0.3

1

-

TUDDH-634

128.5

129.4

0.9

7.42

0.62

TUDDH-634

including

129.1

129.4

0.3

10.89

-

TUDDH-634

148.5

149.1

0.6

1.46

-

TUDDH-637

48.2

48.8

0.6

0.6

-

TUDDH-637

68.8

69.4

0.6

0.81

-

TUDDH-637

161.7

163.2

1.5

16.13

0.17

TUDDH-637

including

161.7

162.3

0.6

38.62

-

TUDDH-637

which includes

161.7

162

0.3

72.46

-

TUDDH-637

173.1

177.6

4.5

2.69

-

TUDDH-637

including

173.1

174

0.9

8.59

-

TUDDH-637

180

182.1

2.1

2.7

-

TUDDH-637

183.9

187.5

3.6

2.76

-

TUDDH-637

including

185.7

187.5

1.8

5.03

-

TUDDH-637

198.2

202.1

3.9

5.38

-

TUDDH-637

including

198.2

198.5

0.3

10.02

-

TUDDH-637

and

199.7

200.6

0.9

3.42

-

TUDDH-637

and

201.2

202.1

0.9

16.13

-

TUDDH-637

which includes

201.8

202.1

0.3

40.21

-

TUDDH-637

219.2

220.4

1.2

10.31

1.99

TUDDH-637

including

219.5

220.4

0.9

12.79

-

TUDDH-637

222.2

222.5

0.3

2.29

-

TUDDH-637

224

226.4

2.4

1.87

-

TUDDH-637

243.5

245

1.5

1.13

-

TUDDH-637

251.3

253.7

2.4

2.46

-

TUDDH-637

258.5

259.1

0.6

0.94

-

TUDDH-637

281.9

282.5

0.6

5.96

-

TUDDH-637

290.9

292.1

1.2

1.97

-

TUDDH-637

298.7

299.6

0.9

6.68

-

TUDDH-638

14.2

14.8

0.6

1.31

-

TUDDH-638

29.8

30.4

0.6

1.29

-

TUDDH-638

106.9

107.2

0.3

0.99

-

TUDDH-638

123.1

123.7

0.6

1.44

-

TUDDH-638

154.9

155.2

0.3

14.96

-0.21

TUDDH-638

162.4

163.3

0.9

3.19

-

TUDDH-638

166.3

167.5

1.2

6.23

-

TUDDH-638

including

166.3

166.9

0.6

8.43

-

TUDDH-638

169.9

171.7

1.8

3.6

-

TUDDH-638

including

170.8

171.7

0.9

6.07

-

TUDDH-638

179.8

181.3

1.5

1.62

-

TUDDH-638

235.9

236.5

0.6

0.87

-

TUDDH-638

241.3

242.5

1.2

4.8

-

TUDDH-638

including

241.9

242.5

0.6

9.06

-

TUDDH-639

50.3

50.6

0.3

5.17

-

TUDDH-641

153

153.7

0.7

2.78

-

TUDDH-641

including

153

153.3

0.3

5.1

-

TUDDH-641

174.5

174.8

0.3

0.57

-

TUDDH-641

176.9

178.7

1.8

2.32

-

TUDDH-641

including

176.9

177.5

0.6

5.1

-

TUDDH-643

111.6

114.9

3.3

18.4

0.92

TUDDH-643

including

111.6

113.7

2.1

28.44

-

TUDDH-643

which includes

113.1

113.7

0.6

95.63

-

TUDDH-643

133.4

133.7

0.3

10.86

0.49

TUDDH-643

158.8

159.1

0.3

0.83

-

TUDDH-643

163.3

163.9

0.6

5.3

-

TUDDH-643

173.6

173.9

0.3

11.66

1.52

TUDDH-643

213.7

214.6

0.9

0.61

-

TUDDH-643

216.4

217

0.6

11.63

0.64

TUDDH-643

233.8

234.4

0.6

5.48

-

TUDDH-643

242.7

249.3

6.6

83.47

2.69

TUDDH-643

including

242.7

246.3

3.6

17.39

-

TUDDH-643

which includes

243.9

245.7

1.8

55.49

-

TUDDH-643

which includes

243.9

244.5

0.6

79.84

-

TUDDH-643

and

245.1

245.7

0.6

14.89

-

TUDDH-643

and also including

247.5

249.3

1.8

271.14

-

TUDDH-643

which includes

247.5

247.8

0.3

40.03

-

TUDDH-643

and

248.7

249.6

0.6

793.24

-

TUDDH-643

251.7

252.9

1.2

0.97

-

TUDDH-643

254.7

257

2.3

10.25

0.84

TUDDH-643

including

254.7

255.3

0.6

35.54

-

TUDDH-643

260.4

261.3

0.9

0.69

-

TUDDH-643

262.8

266.1

3.3

1.63

-

TUDDH-643

268.3

268.8

0.5

1.3

-

TUDDH-644

172.3

175

2.7

2.33

-

TUDDH-644

including

173.8

174.4

0.6

5.83

-

TUDDH-644

208.6

208.9

0.3

4.37

-

TUDDH-644

220.3

220.6

0.3

10.87

-1.98

TUDDH-644

237.1

237.7

0.6

1.19

-

TUDDH-646

116.7

117.3

0.6

1.65

-

TUDDH-646

154.8

155.1

0.3

0.67

-

TUDDH-646

181.5

183.3

1.8

2.41

-

TUDDH-646

including

183

183.3

0.3

13.29

-

TUDDH-646

223.9

224.5

0.6

8.98

-

TUDDH-646

including

224.2

224.5

0.3

15.09

-

TUDDH-646

231.1

233.2

2.1

4.23

-

TUDDH-646

including

232

232.6

0.6

10.27

-

TUDDH-646

252.3

252.7

0.4

2.81

-

TUDDH-646

253.9

254.2

0.3

2.16

-

TUDDH-649

24.9

25.2

0.3

1.93

-

TUDDH-649

153.6

154.2

0.6

0.74

-

TUDDH-649

161.7

162.3

0.6

0.52

-

TUDDH-649

188.1

190.8

2.7

1.21

-

TUDDH-649

248.7

249.3

0.6

1.17

-

TUDDH-649

251.4

252.3

0.9

0.86

-

TUDDH-649

257.1

257.4

0.3

3.31

-

TUDDH-650

53.6

53.9

0.3

0.61

-

TUDDH-650

76.7

77

0.3

0.62

-

TUDDH-650

104.1

104.4

0.3

0.67

-

TUDDH-650

148.5

149.1

0.6

0.51

-

TUDDH-650

179.1

179.4

0.3

1.62

-

TUDDH-650

180.6

181.2

0.6

0.51

-

TUDDH-650

192.6

194.1

1.5

14.93

-

TUDDH-650

including

192.6

193.5

0.9

23.89

-

TUDDH-650

199

199.3

0.3

1.66

-

TUDDH-650

203.5

207.4

3.9

11.84

-

TUDDH-650

including

203.5

204.7

1.2

35.18

-

TUDDH-650

which includes

203.5

204.1

0.6

48.27

-

TUDDH-650

and

204.1

204.7

0.6

22.09

-

TUDDH-650

210.4

210.7

0.3

2.05

-

TUDDH-651

18.25

18.85

0.6

0.93

-

TUDDH-651

80.55

81.15

0.6

2.09

-

TUDDH-651

100.65

100.95

0.3

1.46

-

TUDDH-651

118.65

119.25

0.6

1.46

-

TUDDH-651

139.95

140.55

0.6

4.39

-

TUDDH-651

184.6

185.2

0.6

32.65

-

TUDDH-651

194.5

197.2

2.7

17.2

-

TUDDH-651

including

194.5

196

1.5

25.92

-

TUDDH-651

which includes

195.4

195.7

0.3

124.52

-

TUDDH-651

and also including

196.9

197.2

0.3

25.22

-

TUDDH-651

222.4

224.8

2.4

2.22

-

TUDDH-653

0

0.6

0.6

3.37

-

TUDDH-653

21.9

22.2

0.3

1.26

-

TUDDH-653

53

56.9

3.9

9.53

-

TUDDH-653

including

55.1

56.9

1.8

19.47

-

TUDDH-653

which includes

56

56.3

0.3

46.92

-

TUDDH-653

and

56.6

56.9

0.3

55.08

-

TUDDH-653

64.4

65

0.6

0.56

-

TUDDH-653

89.5

96.3

6.8

9.96

-

TUDDH-653

including

91.3

92.2

0.9

66.62

-

TUDDH-653

which includes

91.6

91.9

0.3

165.95

-

TUDDH-653

and

91.9

92.2

0.3

30.46

-

TUDDH-653

111.6

111.9

0.3

6.53

-

TUDDH-653

116.7

118.8

2.1

1.59

-

TUDDH-653

120

120.6

0.6

0.59

-

TUDDH-655

59.7

61.5

1.8

2.74

-

TUDDH-655

96.4

97.9

1.5

8.24

-

TUDDH-655

including

96.7

97

0.3

18.48

-

TUDDH-655

and

97.6

97.9

0.3

20.77

-

TUDDH-655

99.1

99.7

0.6

0.9

-