Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LIO.V ·

Lion One Mobilizes Sixth Drill Rig and Reports Continued High Grade Results from the Tuvatu Gold Project in Fiji

Drill Results

Lion One Mobilizes Sixth Drill Rig and Reports

Continued High Grade Results from the Tuvatu

Gold Project in Fiji

North Vancouver, British Columbia--(Newsfile Corp. - March 9, 2021) -

Lion One Metals Limited

(TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO)

("Lion One" or the "Company")

is pleased to announce

the delivery and mobilization of two new drilling rigs and continued high grade gold results from surface

drilling and underground channel sampling programs from the Company's 100% owned fully permitted

Tuvatu Gold Project in Fiji.

The two new Canadian built Zinex drill rigs and related equipment were purchased in late 2020 and

arrived at the Port of Lautoka in Fiji in the second week of February prior to clearing customs and being

delivered to the project site. The two new rigs have 1,000 meter depth capacity, can be utilized from

surface or underground, and are scheduled to be fully operational by late March.

"With the deployment of these rigs the Company will have six rigs operating as it transitions into Fiji's dry

season, with four rigs focused on continued near surface and deep drilling at Tuvatu, and two rigs

focused on drilling CSAMT anomalies exceeding depths of 1.2km in the surrounding Navilawa Caldera,"

said Lion One CEO, Walter Berukoff.

The Company's other two deep capacity rigs are currently drilling holes (TUDDH-522 and 523) targeting

extensions of TUDDH-500 which previously intersected

1,400 g/t Au over 0.30m

(see NR dated Aug.

17, 2020). These two current holes are expected to hit target depths of over 800m in coming weeks.

Additional near surface high-grade gold results have been received from Hole TUDDH-521, which has

intersected four shallow high grade intercepts infilling near-surface gaps in or adjacent to the current lode

resource model. These results from TUDDH-521 combine with the recently completed

TUDDH-520

which intersected

21.31 g/t Au over 12.45m including 544 g/t Au over 0.35m

at a vertical depth of

75m (see NR dated Feb. 3, 2020) to demonstrate a significant increase in the grade of the lodes in this

area.

Table 1:

Latest results from TUDDH-521

Hole

From (m)

To (m)

Length (m)

Gold (g/t)

TUDDH521

57.59

57.72

0.13

51.69

69.70

71.57

1.87

8.17

includes

70.00

70.50

0.50

25.34

74.12

76.10

1.98

8.52

includes

74.84

75.22

0.38

30.05

78.56

82.06

3.50

5.30

includes

81.83

82.06

0.23

32.23

Note: True widths of lodes are believed to be approximately 70% of reported drill intercept lengths.

The Company also reports that Lion One Fiji personnel have modified the existing Tuvatu underground

workings in preparation for underground drilling and undertaken systematic sampling of the principal

lode structures identified in this area. Several select high grade channel samples exceeding 50 g/t gold

were recently taken with the highest values of

560 g/t Au over 0.10m, 91.77 g/t Au over 0.13m, 60.46

g/t Au over 0.12m, and 56.94 g/t Au over 0.11m

(SKL lode), with

43.67 g/t Au over 0.15m

(Snake

lode), and

45.63 g/t Au over 0.13m

(UR2 lode). (see Figure 1 below)

Figure 1: Underground sampling from fresh exposures in Tuvatu Underground

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/2178/76596_08ac9b1ca4338af4_001full.jpg

Table 2: Survey details of diamond drill holes discussed in this release

Hole No

coordinates

RL

dip

azimuth

Depth

N

E

(m)

(TN)

(m)

TUDDH521

3920568.68

1876341.38

287.37

-45

130

167.2

TUDDH522

3920483.67

1876723.34

359.48

-71

305

372.5*

TUDDH523

3920460.32

1876585.14

318.55

-85

201

449.9*

*Holes in progress

Drilling and Assay Processes and Procedures

The Company is utilizing its own diamond drill rig, using PQ, HQ and ultimately NQ sized drill core rods.

Drill core is logged by Company geologists and then is sawn in half and sampled by Lion One staff.

Samples are analyzed at the Company's own geochemical laboratory in Fiji, whilst pulp duplicates of

samples with results >0.5g/t Au are sent to ALS Global laboratories in Australia for check assay

determinations. Assays reported here will be sent to ALS Global Laboratories for check assays shortly.

All samples are pulverized to 80% passing through 75 microns. Gold analysis is carried out using fire

assay with an AA finish. Samples that have returned grades greater than 10g/t Au are then re-analyzed

by gravimetric method.

Lion One's laboratory can also assay for a range of 71 other elements through

Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES), but currently focuses on a suite

of 9 important pathfinder elements. All duplicate anomalous samples sent to ALS Townsville,

Queensland, Australia are analyzed by the same methods (Au-AA26, and also Au-GRA22 where

applicable). ALS also analyze for 33 pathfinder elements are analyzed by HF-HNO3-HClO4 acid

digestion, HCl leach and ICP-AES. (method ME-ICP61).

Qualified Person

The scientific and technical content of this news release has been reviewed, prepared, and approved by

Mr. Stephen Mann, P. Geo, Managing Director of Lion One, who is a qualified person pursuant to

National Instrument 43-101 - Standards of disclosure for Mineral Projects ("NI-43-101).

About Tuvatu

The Tuvatu gold deposit is located on the island of Viti Levu in the South Pacific island nation of Fiji. The

mineral resource for Tuvatu as disclosed in the technical report "Tuvatu Gold Project PEA", dated June

1, 2015, and prepared by Mining Associates Pty Ltd of Brisbane Qld, comprises 1,120,000 tonnes

indicated at 8.17 g/t Au (294,000 oz. Au) and 1,300,000 tonnes inferred at 10.60 g/t Au (445,000 oz. Au)

at a cut-off grade of 3 g/t Au.

The technical report is available on the Lion One website at

www.liononemetals.com

and on the SEDAR website at

www.sedar.com

.

About Lion One Metals Limited

Lion One's flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project,

located on the island of Viti Levu in Fiji. Lion One envisions a low-cost high-grade underground gold

mining operation at Tuvatu coupled with exciting exploration upside inside its tenements covering the

entire Navilawa Caldera, an underexplored yet highly prospective 7km diameter alkaline gold system.

Lion One's CEO Walter Berukoff leads an experienced team of explorers and mine builders and has

owned or operated over 20 mines in 7 countries.

As the founder and former CEO of Miramar Mines,

Northern Orion, and La Mancha Resources, Walter is credited with building over $3 billion of value for

shareholders.

On behalf of the Board of Directors of

Lion One Metals Limited

"

Walter Berukoff

"

Chairman and CEO

For further information

Contact Investor Relations

Toll Free (North America) Tel: 1-855-805-1250

Email:

[email protected]

Website:

www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider

accepts responsibility for the adequacy or accuracy of this release.

This press release may contain statements that may be deemed to be "forward-looking statements"

within the meaning of applicable Canadian securities legislation. All statements, other than

statements of historical fact, included herein are forward looking information. Generally, forward-

looking information may be identified by the use of forward-looking terminology such as "plans",

"expects" or "does not expect", "proposed", "is expected", "budget", "scheduled", "estimates",

"forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words

and phrases, or by the use of words or phrases which state that certain actions, events or results may,

could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals

Limited's current beliefs and is based on information currently available to Lion One Metals Limited

and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include,

but are not limited to, the actual results of exploration projects being equivalent to or better than

estimated results in technical reports, assessment reports, and other geological reports or prior

exploration results. Forward-looking information is subject to known and unknown risks, uncertainties

and other factors that may cause the actual results, level of activity, performance or achievements of

Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied

by such forward-looking information. Such risks and other factors may include, but are not limited to:

the stage development of Lion One Metals Limited, general business, economic, competitive,

political and social uncertainties; the actual results of current research and development or

operational activities; competition; uncertainty as to patent applications and intellectual property

rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals;

changes in legislation, including environmental legislation, affecting mining, timing and availability of

external financing on acceptable terms; not realizing on the potential benefits of technology;

conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals.

Although Lion One Metals Limited has attempted to identify important factors that could cause actual

results to differ materially from those contained in forward-looking information, there may be other

factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should

not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake

to update any forward-looking information, except in accordance with applicable securities laws.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/76596