Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LIO.V ·

Lion One Drills 6.7 m of 25.45 g/t Gold in Zone 2 at Tuvatu Gold Mine in Fiji

Drill Results

Lion One Drills 6.7 m of 25.45 g/t Gold in Zone

2 at Tuvatu Gold Mine in Fiji

North Vancouver, British Columbia--(Newsfile Corp. - January 30, 2025) -

Lion One Metals Limited

(TSXV: LIO) (OTCQX: LOMLF)

("Lion One" or the "Company

") is pleased to report significant new

high-grade gold results from 3,791.3 metres of underground grade control drilling at its 100% owned

Tuvatu Alkaline Gold Project in Fiji. The drilling is focused on Zone 2 and targeted the URW and Murau

lode systems.

All drilling was completed from existing near surface underground workings. The Company intersected

high-grade mineralized structures in 25 holes. Most of the drill holes did not exceed 130 metres in length

from underground drill stations. Drill results include multiple bonanza grade gold assays over narrow

widths such as

168.3 g/t over 0.4 m, 158.0 g/t over 0.3 m, 145.5 g/t over 0.4 m, 123.5 g/t over 0.6 m,

and 119.5 g/t over 0.4 m

, all of which are located near existing underground workings. These bonanza

grade gold results occur within larger intervals of high-grade mineralization, such as

6.7 m of 25.45 g/t

gold

, and

4.7 m of 26.89 g/t gold

.

The Zone 2 drilling targeted two separate mineralized systems: the URW system and the Murau system.

The URW drilling primarily targeted the downdip extension of the URW1 stockwork zone below the 1101

level, while the Murau drilling primarily targeted mineralization below the 1095 level. Both programs

intersected high grade mineralization, indicating that both systems extend down vertically below current

mining levels. Due to the proximity of these results to active mining levels, these results are anticipated to

be incorporated into the mine plan in the next six to twelve months. Notably, the headline intersect of 6.7

m of 25.45 g/t gold is located within the high-grade roscoelite zone, just 10 m below current mining

activities in the 1095 level (see press releases dated

November 12, 2024

and

November 19, 2024

).

Lion One Chairman and CEO Walter Berukoff commented: "We're extremely pleased with the new

results from our Zone 2 grade control drill program. These drill results are in close proximity to our active

mine headings and we're excited to incorporate them into our near-term mine plan. Together with the

high-grade Zone 5

results released last week, we continue to advance Tuvatu on multiple fronts and we

look forward to advancing the mine to new levels underground."

Highlights of New Drill Results

:

25.45 g/t Au over 6.7 m

(including 145.5 g/t Au over 0.4 m) (TGC-0276, from 45.1 m depth)

26.89 g/t Au over 4.7 m

(including 78.0 g/t Au over 0.85 m) (TGC-0264, from 36.8 m depth)

36.94 g/t Au over 2.5 m

(including 158.0 g/t Au over 0.3 m) (TGC-0312, from 46.5 m depth)

13.97 g/t Au over 6.6 m

(including 54.5 g/t Au over 0.3 m) (TGC-0260, from 31.45 m depth)

45.95 g/t Au over 1.8 m

(including 123.5 g/t Au over 0.55 m) (TGC-0308, from 43 m depth)

168.25 g/t Au over 0.4 m

(TGC-0276, from 18.5 m depth)

29.23 g/t Au over 2.1 m

(including 37.43 g/t Au over 0.9 m) (TGC-0353, from 27.9 m depth)

21.48 g/t Au over 2.7 m

(including 119.5 g/t Au over 0.42 m) (TGC-0344, from 70.2 m depth)

12.47 g/t Au over 3.8 m

(including 49.86 g/t Au over 0.45 m) (TGC-0264, from 57.2 m depth)

10.82 g/t Au over 3.7 m

(including 19.51 g/t Au over 0.6 m) (TGC-0276, from 39.9 m depth)

*Drill intersects are downhole lengths, 3.0 g/t cutoff. True width not known. See Table 1 for additional data.

Figure 1. Location of the Zone 2 drilling reported in this news release.

Left image: Plan view of

Tuvatu showing Zone 2 drillholes in relation to the mineralized lodes at Tuvatu, shown in grey. Right

image: Section view of Zone 2 drilling looking northeast. Zone 2 drilling primarily targeted the Murau and

URW lode systems below current mine levels.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/238920_ba24572d84122a46_001full.jpg

Zone 2 Drilling

The Zone 2 area of Tuvatu is located in the northwest part of the deposit, near the main portal. The URW

and Murau lode systems are the primary mineralized systems in Zone 2, and they are both actively being

mined. A total of 35 drill holes are reported in this news release, including 23 targeting the URW system

and 12 targeting the Murau system.

The URW system consists of multiple closely spaced steeply dipping high grade mineralized lodes

trending in a north-south direction. Within this system lies the URW1 stockwork zone, which consist of

two steeply dipping lodes enveloped within a stockwork zone of gold-bearing veinlets. Four levels of

underground mining have been completed within the URW1 stockwork zone; the 1161, 1141, 1121, and

1101 levels. Long hole open stope mining is taking place between these levels. The URW drilling

reported here was conducted from the 1116 drill station underground and consists of a series of drill

holes oriented in a fan from east to southeast. The drill program primarily targeted the down dip

extension of the URW1 stockwork zone below the 1101 level along a 120 m strike length from north to

south. High- and bonanza-grade results were intersected in multiple drill holes, indicating the

continuation of the system below current mine workings (see Figure 2).

The Murau system consists of a series of high-grade flat to moderately flat mineralized structures located

between the steeply dipping URW1 stockwork zone to the east and the steeply dipping Ura lode system

to the west. The Murau structures are known as ''flatmakes''

[1]

and have abundant roscoelite

mineralization. They Murau flatmakes are a major component of the high-grade roscoelite zone that was

identified in 2024. The first such flatmake is being actively mined along the 1095 level in Zone 2 where a

120 m strike length of the system has been exposed. The Murau drilling reported here was conducted

from the 1121 drill station underground. Drilling consists of a series of drill holes oriented in a fan from

the north to the northwest. The primary target of the drilling was mineralization below the 1095 level, with

several drillholes also targeting mineralization above the 1095 level. High grade mineralization was

intersected both above and below the 1095 level, with 6.7 m of 25.45 g/t gold intersected within 10 m

below the 1095 level indicating the potential for additional flatmakes below the 1095 level (see Figure 3).

The purpose of the current Zone 2 URW and Murau grade control drill programs are to enhance the mine

model and inform stope design in advance of mining in these areas. The majority of the high-grade

intervals reported in this release are located within 30 m of underground developments and are

anticipated to be included in the mine plan in 2025. Both the URW1 and Murau drill programs have

successfully intersected high-grade gold mineralization in close proximity below current underground

workings. Highlights of the Zone 2 drilling reported here are shown in Figure 2 and Figure 3.

Figure 2. Zone 2 URW grade control drilling with high-grade intersects highlighted, 3.0 g/t gold

cutoff.

Oblique view looking down to the north. The URW grade control drilling in Zone 2 was oriented in

a fan from the east to the south and primarily targeted the down-dip extension of the URW1 stockwork

zone below the 1101 level, as well as the extensions of the system to the north and to the south.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/238920_ba24572d84122a46_002full.jpg

Figure 3. Zone 2 Murau grade control drilling with high-grade intersects highlighted, 3.0 g/t

gold cutoff.

Section view looking east-northeast. The Murau grade control drilling in Zone 2 targeted

mineralization in the roscoelite zone below the 1095 level, as well as the gap between the Murau and

URW1 lode systems. The headline drill intercept of 6.7 m of 25.45 g/t gold is located within 10 m below

the 1095 level and is scheduled for mining in the near term.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/238920_ba24572d84122a46_003full.jpg

Competent Persons Statement

The information in this report that relates to mineral exploration at the Tuvatu Gold Project is based on

information compiled by the Lion One team and has been reviewed and approved by Melvyn Levrel, who

is the company's Senior Geologist. Mr Levrel is a Member of the Australian Institute of Geoscientists and

has sufficient experience that is relevant to the style of mineralisation and type of deposit under

consideration, and to the activity being undertaken, to qualify as a Qualified Person as defined by

National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101"). Mr Levrel

consents to the inclusion in this report of the matters based on the information in the form and context in

which it appears.

Lion One Laboratories / QAQC

Lion One adheres to rigorous QAQC procedures above and beyond basic regulatory guidelines in

conducting its drilling, sampling, testing, and analyses. The Company operates its own geochemical

assay laboratory and its own fleet of diamond drill rigs using PQ, HQ and NQ sized drill rods.

Diamond drill core samples are logged by Lion One personnel on site. Exploration diamond drill core is

split by Lion One personnel on site, with half core samples sent for analysis and the other half core

remaining on site. Grade control diamond drill core is whole core assayed. Core samples are delivered

to the Lion One Laboratory for preparation and analysis. All samples are pulverized at the Lion One lab

to 85% passing through 75 microns and gold analysis is carried out using fire assay with an AA finish.

Samples that return grades greater than 10.00 g/t Au are re-analyzed by gravimetric method, which is

considered more accurate for very high-grade samples.

Duplicates of 5% of samples with grades above 0.5 g/t Au are delivered to ALS Global Laboratories in

Australia for check assay determinations using the same methods (Au-AA26 and Au-GRA22 where

applicable). ALS also analyses 33 pathfinder elements by HF-HNO3-HClO4 acid digestion, HCl leach

and ICP-AES (method ME-ICP61). The Lion One lab can test a range of up to 71 elements through

Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES), but currently focuses on a suite

of 26 important pathfinder elements with an aqua regia digest and ICP-OES finish.

About Lion One Metals Limited

Lion One Metals is an emerging Canadian gold producer headquartered in North Vancouver BC, with

new operations established in late 2023 at its 100% owned Tuvatu Alkaline Gold Project in Fiji. The

Tuvatu project comprises the high-grade Tuvatu Alkaline Gold Deposit, the Underground Gold Mine, the

Pilot Plant, and the Assay Lab. The Company also has an extensive exploration license covering the

entire Navilawa Caldera, which is host to multiple mineralized zones and highly prospective exploration

targets.

On behalf of the Board of Directors,

Walter Berukoff, Chairman & CEO

Contact Information

Email:

[email protected]

Phone: 1-855-805-1250 (toll free North America)

Website:

www.liononemetals.com

Neither the TSX-V nor its Regulation Service Provider accepts responsibility or the adequacy or

accuracy of this release

This press release may contain statements that may be deemed to be "forward-looking statements"

within the meaning of applicable Canadian securities legislation. All statements, other than

statements of historical fact, included herein are forward-looking information. Generally, forward-

looking information may be identified by the use of forward-looking terminology such as "plans",

"expects" or "does not expect", "proposed", "is expected", "budget", "scheduled", "estimates",

"forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words

and phrases, or by the use of words or phrases which state that certain actions, events or results may,

could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals

Limited's current beliefs and is based on information currently available to Lion One Metals Limited

and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include,

but are not limited to, the actual results of exploration projects being equivalent to or better than

estimated results in technical reports, assessment reports, and other geological reports or prior

exploration results. Forward-looking information is subject to known and unknown risks, uncertainties

and other factors that may cause the actual results, level of activity, performance, or achievements of

Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied

by such forward-looking information. Such risks and other factors may include, but are not limited to:

the stage development of Lion One Metals Limited, general business, economic, competitive,

political and social uncertainties; the actual results of current research and development or

operational activities; competition; uncertainty as to patent applications and intellectual property

rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals;

changes in legislation, including environmental legislation, affecting mining, timing and availability of

external financing on acceptable terms; not realizing on the potential benefits of technology;

conclusions of economic evaluations; and lack of qualified, skilled labor or loss of key individuals.

Although Lion One Metals Limited has attempted to identify important factors that could cause actual

results to differ materially from those contained in forward-looking information, there may be other

factors that cause results not to be as anticipated, estimated, or intended. Accordingly, readers should

not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake

to update any forward-looking information, except in accordance with applicable securities laws.

Appendix 1: Full Drill Results and Collar Information

Table 1.

Collar coordinates for drillholes reported in this release. Coordinates are in Fiji map grid.

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Depth

TGC-0253

1876320

3920738

123

10.3

-35.7

110.6

TGC-0258

1876320

3920738

122

10.1

-50.1

85.0

TGC-0260

1876320

3920739

122

10.6

-15.9

100.0

TGC-0262

1876320

3920739

123

10.5

0.0

101.0

TGC-0264

1876320

3920740

125

11.2

21.1

105.2

TGC-0266

1876319

3920738

123

353.8

-24.3

106.2

TGC-0270

1876317

3920736

121

295.7

-54.9

75.0

TGC-0272

1876317

3920736

121

295.5

-70.6

55.3

TGC-0274

1876316

3920737

122

300.6

-39.1

100.0

TGC-0276

1876316

3920729

121

320.2

-39.3

75.6

TGC-0280

1876317

3920728

121

322.8

-50.8

75.0

TGC-0283

1876317

3920729

121

339.1

-50.4

75.3

TGC-0285

1876298

3920812

121

103.6

10.9

90.2

TGC-0290

1876298

3920813

121

83.7

13.2

91.7

TGC-0293

1876298

3920813

120

90.0

-5.7

275.4

TGC-0298

1876298

3920812

120

107.0

-13.9

275.0

TGC-0305

1876289

3920808

119

157.3

-30.0

41.4

TGC-0308

1876287

3920806

119

157.9

-28.7

150.0

TGC-0312

1876287

3920806

119

156.4

-24.8

165.3

TGC-0314

1876288

3920807

119

149.6

-26.1

146.4

TGC-0317

1876288

3920808

120

135.1

-11.3

63.2

TGC-0320

1876288

3920807

119

135.5

-24.2

127.0

TGC-0322

1876288

3920807

119

132.1

-28.9

127.0

TGC-0324

1876288

3920808

120

129.3

-22.7

122.7

TGC-0328

1876288

3920807

120

134.2

-6.3

71.5

TGC-0329

1876287

3920806

118

166.1

-35.1

148.3

TGC-0334

1876287

3920806

118

102.0

-9.0

10.6

TGC-0337

1876292

3920809

119

118.1

-23.3

118.7

TGC-0340

1876292

3920809

119

117.4

-28.4

122.5

TGC-0344

1876295

3920810

119

109.2

-27.0

117.3

TGC-0348

1876298

3920811

120

103.3

-8.3

7.8

TGC-0350

1876298

3920811

119

102.7

-19.2

110.0

TGC-0353

1876298

3920811

120

102.3

-8.7

108.0

TGC-0357

1876298

3920811

119

106.9

-34.5

121.0

TGC-0362

1876298

3920812

119

98.3

-31.0

116.1

Table 2

. Composite intervals from drillholes reported in this news release (composite grade >3.0 g/t Au,

with <1 m internal dilution at <3.0 g/t Au).

Hole ID

From (m)

To (m)

Width (m)

Au (g/t)

TGC-0260

30.0

30.4

0.4

26.50

31.5

38.0

6.6

13.97

including

31.5

31.8

0.3

17.06

and

31.8

32.4

0.7

5.68

and

32.4

33.6

1.2

16.99

and

33.6

33.9

0.3

54.50

and

33.9

34.7

0.8

47.20

and

34.7

35.4

0.7

0.04

and

35.4

36.0

0.7

4.13

and

36.0

36.8

0.8

1.93

and

36.8

38.0

1.2

5.33

39.3

40.0

0.7

3.75

TGC-0262

24.0

24.3

0.3

3.46

45.0

45.3

0.3

6.94

46.5

47.2

0.7

5.04

TGC-0264

36.8

41.5

4.7

26.89

including

36.8

37.1

0.3

10.85

and

37.1

38.3

1.2

16.77

and

38.3

39.5

1.2

13.50

and

39.5

40.0

0.5

0.08

and

40.0

40.9

0.9

78.00

and

40.9

41.5

0.7

31.47

44.4

47.2

2.8

7.94

including

44.4

45.0

0.6

9.77

and

45.0

45.3

0.3

2.23

and

45.3

45.9

0.6

3.22

and

45.9

46.2

0.3

18.99

and

46.2

46.9

0.7

9.37

and

46.9

47.2

0.3

5.31

57.2

61.0

3.8

12.47

including

57.2

57.8

0.6

9.37

and

57.8

58.4

0.6

0.62

and

58.4

58.9

0.5

49.86

and

58.9

59.2

0.3

0.40

and

59.2

59.5

0.3

8.59

and

59.5

59.8

0.3

33.44

and

59.8

60.4

0.7

5.13

and

60.4

61.0

0.6

4.83

TGC-0270

45.4

46.6

1.2

19.55

TGC-0274

29.0

29.7

0.7

27.68

including

29.0

29.4

0.4

26.54

and

29.4

29.7

0.3

29.20

38.3

39.2

0.9

3.90

44.7

45.7

1.0

4.12

53.8

56.2

2.4

5.36

including

53.8

54.6

0.8

8.78

and

54.6

54.9

0.3

1.52

and

54.9

55.4

0.5

1.63

and

55.4

55.8

0.4

8.29

and

55.8

56.2

0.4

3.64

58.1

59.0

0.9

7.02

including

58.1

58.4

0.3

6.88

and

58.4

59.0

0.6

7.09

60.1

64.1

4.0

4.38

including

60.1

60.4

0.3

7.87

and

60.4

61.3

0.9

0.36

and

61.3

61.6

0.3

3.70

and

61.6

62.2

0.6

9.13

and

62.2

62.9

0.7

4.65

and

62.9

63.3

0.4

0.25

and

63.3

64.1

0.8

6.12

TGC-0276

18.5

18.9

0.4

168.25

39.9

43.6

3.7

10.82

including

39.9

40.8

0.9

9.00

and

40.8

41.1

0.3

12.00

and

41.1

41.7

0.6

19.51

and

41.7

42.7

1.0

0.44

and

42.7

43.6

0.9

17.99

45.1

51.8

6.7

25.45

including

45.1

45.4

0.3

66.44

and

45.4

46.2

0.8

8.25

and

46.2

46.5

0.3

67.29

and

46.5

46.9

0.4

13.36

and

46.9

47.2

0.3

12.58

and

47.2

47.6

0.4

23.10

and

47.6

48.0

0.4

145.50

and

48.0

48.6

0.6

13.66

and

48.6

49.6

1.0

4.04

and

49.6

50.1

0.5

47.73

and

50.1

50.8

0.7

6.76

and

50.8

51.8

1.0

5.48

TGC-0285

13.8

14.4

0.6

52.57

63.1

63.4

0.3

12.39

TGC-0290

41.7

43.0

1.3

10.85

including

41.7

42.0

0.3

20.38

and

42.0

42.7

0.7

5.93

and

42.7

43.0

0.3

12.79

45.4

46.0

0.6

6.18

58.4

61.0

2.6

10.76

including

58.4

59.2

0.8

24.33

and

59.2

60.4

1.2

4.97

and

60.4

61.0

0.6

4.24

62.2

62.5

0.3

6.90

TGC-0293

48.0

49.2

1.2

9.43

including

48.0

48.6

0.6

14.89

and

48.6

49.2

0.6

3.97

128.0

130.2

2.2

3.02

including

128.0

129.0

1.0

3.09

and

129.0

129.6

0.6

2.10

and

129.6

130.2

0.6

3.83

162.8

165.2

2.4

5.22

including

162.8

163.1

0.3

21.04

and

163.1

163.6

0.5

0.40

and

163.6

164.4

0.8

3.46

and

164.4

165.2

0.8

4.07

169.1

170.0

0.9

5.18

TGC-0298

23.8

24.2

0.4

19.57

56.6

57.5

0.9

8.50

65.4

65.7

0.3

8.48

TGC-0305

5.1

6.7

1.6

11.76

including

5.1

5.4

0.3

4.24

and

5.4

6.0

0.6

26.29

and

6.0

6.3

0.3

1.41

and

6.3

6.7

0.4

3.38

8.8

9.7

0.9

11.85

TGC-0308

4.6

4.9

0.3

3.30

5.6

5.9

0.3

3.15

10.1

10.5

0.4

5.58

11.6

12.5

0.9

6.81

including

11.6

12.0

0.4

9.95

and

12.0

12.5

0.5

4.30

43.0

44.8

1.8

45.95

including

43.0

43.3

0.3

6.21

and

43.3

43.6

0.3

0.18

and

43.6

44.2

0.6

123.50

and

44.2

44.5

0.3

29.20

and

44.5

44.8

0.3

6.03

52.6

53.8

1.2

5.70

57.2

58.4

1.2

4.78

122.6

122.9

0.3

7.08

TGC-0312

4.5

5.4

0.9

3.58

9.3

10.5

1.2

4.07

37.4

37.7

0.3

6.15

46.5

49.0

2.5

36.94

including

46.5

47.2

0.7

17.52

and

47.2

47.5

0.3

48.99