Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LIO.V ·

Lion One Drills 2.4 m of 90.76 g/t Gold in Zone 5 at Tuvatu

Drill Results

Lion One Drills 2.4 m of 90.76 g/t Gold in Zone

5 at Tuvatu

North Vancouver, British Columbia--(Newsfile Corp. - November 2, 2023) -

Lion One Metals Limited

(TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO)

("Lion One" or the "Company")

is pleased to report

significant new high-grade gold results from ongoing infill and grade control drilling at its 100% owned

Tuvatu Alkaline Gold Project in Fiji.

Assay results are presented here for infill and grade control drilling completed in the Zone 5 area of

Tuvatu, which encompasses the near-surface portions of lodes UR1 to UR8, as well as URW2A and

URW3. Grade control drilling is focused on the sections of lodes UR1, UR2, and URW3 that are

scheduled for mining in early 2024, whereas infill drilling is focused on the parts of Zone 5 that are

scheduled for mining in 2024 and 2025. Previous results from Zone 5 are available in the news releases

dated

June 14, 2023

and

August 10, 2023

.

Highlights of results (3.0 g/t cutoff):

90.76 g/t Au over 2.4 m

(including 261.47 g/t Au over 0.6 m) (TUDDH-659, from 221.3 m depth)

18.56 g/t Au over 3.0 m

(including 101.89 g/t Au over 0.3 m) (TGC-0081, from 92.1 m depth)

86.47 g/t Au over 0.6 m

(TUDDH-672, from 141.1 m depth)

11.31 g/t Au over 3.9 m

(including 65.29 g/t Au over 0.3 m) (TGC-0084, from 99.3 m depth)

46.78 g/t Au over 0.6 m

(TUDDH-671, from 127.7 m depth)

38.75 g/t Au over 0.6 m

(including 64.10 g/t Au over 0.3 m) (TGC-0107, from 136.2 m depth)

16.60 g/t Au over 1.2 m

(including 24.37 g/t Au over 0.6 m) (TGC-0101, from 125.7 m depth)

31.56 g/t Au over 0.6 m

(TUDDH-676, from 158.9 m depth)

51.76 g/t Au over 0.3 m

(TUDDH-665, from 260.3 m depth)

Figure 1. Location of Zone 5 Infill and Grade Control Drillholes.

Left image: Plan view of Tuvatu

showing Zone 5 infill and grade control drillholes in relation to the mineralized lodes at Tuvatu. Drillholes

are shown in black, mineralized lodes in pale grey, and underground developments in red. The yellow

dashed square represents the area illustrated in the image on the right. Right image: Oblique view of

Zone 5 infill and grade control drilling looking approximately northeast. Infill drilling was conducted from

surface whereas grade control drilling was conducted from underground.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/186094_75460e161458d8e2_001full.jpg

Table 1. Highlights of composited grade control and infill drill results in the Zone 5 area

.

Composites are calculated using a 3 g/t Au cutoff with maximum internal dilution intervals of 1 m at <3 g/t

Au. For full results see Table 4 in the appendix.

Hole ID

From

To

Interval (m)

Au (g/t)

TUDDH-659

221.3

223.7

2.4

90.76

including

221.3

222.5

1.2

176.28

which includes

221.3

221.6

0.3

83.62

and

221.6

222.2

0.6

261.47

and

222.2

222.5

0.3

98.55

TGC-0081

92.1

95.1

3

18.56

including

92.1

92.4

0.3

101.89

and

92.4

92.7

0.3

35.02

TUDDH-672

141.1

141.7

0.6

86.47

TGC-0084

99.3

103.2

3.9

11.31

including

99.6

99.9

0.3

28.93

and

100.8

101.1

0.3

65.29

TUDDH-671

127.7

128.3

0.6

46.78

TGC-0107

136.2

136.8

0.6

38.75

including

136.2

136.5

0.3

64.10

and

136.5

136.8

0.3

13.40

TGC-0101

125.7

126.9

1.2

16.60

including

125.7

126.3

0.6

24.37

TUDDH-676

158.9

159.5

0.6

31.56

TUDDH-676

252.2

253.1

0.9

18.59

TUDDH-676

243.2

245

1.8

9.05

including

243.2

243.8

0.6

19.87

TUDDH-665

260.3

260.6

0.3

51.76

TUDDH-657

109.6

111.1

1.5

9.32

including

109.6

109.9

0.3

35.89

and

110.8

111.1

0.3

10.25

TUDDH-674

130.7

131.9

1.2

11.65

including

130.7

131.3

0.6

20.18

Zone 5

The Zone 5 area of Tuvatu is located along the main decline and includes the principal north-south

oriented lodes at Tuvatu (UR1, UR2, UR3), the principal northeast-southwest oriented lodes (UR4 to

UR8), and several smaller lodes to the west of the main decline (URW2, URW2A, URW3). The lodes in

Zone 5 are all steeply dipping structures. Zone 5 represents the upward extension of the Zone 500

feeder zone, where several lodes coalesce into a wide zone of very high-grade mineralization, such as

20.86 g/t Au over 75.9 m (TUG-141), 12.22 g/t Au over 54.90 m (TUDDH-601), and 17.52 g/t Au over

23.7 m (TUDDH-608). The Zone 5 lodes targeted in the current round of drilling are shown in Figure 2.

The location of Zone 5 relative to Zone 500 is also shown in Figure 2.

Figure 2. Main Zone at Tuvatu.

Left image: Plan view of Tuvatu identifying the lodes referenced in this

report. Right image: Section view looking approximately northeast, showing the location of Zone 5 and

Zone 500 relative to the lodes. Drillholes reported in this news release are shown in yellow for visibility.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/186094_75460e161458d8e2_002full.jpg

A total of 10 grade control and 10 infill drillholes are included in this release. The grade control drill

program was conducted from underground and targeted the UR1, UR2, and URW3 lodes. The program

was designed to provide a detailed understanding of the mineralization and geometry of these lodes

both above and below the current underground developments. The grade control drillholes reported in

this news release were drilled on 20 m centers. This will be followed up by additional grade control

drilling to increase drill density to 10 m centers in advance of mining. The area targeted by these grade

control drillholes is outside the current PEA mine plan but is being brought into the mine plan for 2024

based on drilling results. This part of Zone 5 is currently scheduled for mining in early 2024.

The infill drill program was conducted from surface and was designed to target the portions of lodes UR1

to UR7 located between the surface and the current underground developments. The purpose of the infill

drill program is to increase knowledge and grade continuity in this area, and to further de-risk this portion

of the deposit, which is scheduled for mining in 2024 and 2025. High-grade intercepts from the current

round of Zone 5 grade control drilling are shown in Figure 3, while high-grade intercepts from the current

round of Zone 5 infill drilling are shown in Figure 4. Examples of Zone 5 mineralization are shown in

Figure 5.

Figure 3. Location of High-Grade Gold Intercepts from Zone 5 Grade Control Drilling, 3.0 g/t

cutoff.

High-grade gold intervals from Zone 5 grade control drillholes reported in this news release. The

grade control drilling targeted sections of the UR1, UR2, and URW3 lodes above and below current

underground developments, shown in grey. Composite intervals with grades between 3 and 10 g/t gold

are shown in orange, grades between 10 and 30 g/t gold are shown in red, and grades over 30 g/t gold

are shown in purple. Select high-grade intervals are identified. View is looking north.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/186094_75460e161458d8e2_003full.jpg

Figure 4. Location of High-Grade Gold Intercepts from Zone 5 Infill Drilling, 3.0 g/t cutoff.

High-

grade gold intervals from Zone 5 infill drillholes reported in this news release. Composite intervals with

grades between 3 and 10 g/t gold are shown in orange, intervals with grades between 10 and 30 g/t gold

are shown in red, and intervals over 30 g/t gold are shown in purple. Select high-grade intervals are

identified. View is looking approximately NNE.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/186094_75460e161458d8e2_004full.jpg

Figure 5. Example Mineralization from Zone 5 Infill and Grade Control Drilling.

Top left:

Monzonite-hosted silica-pyrite-sphalerite-galena veins (TGC-0096, 87.5 m). Top middle: Chalcedonic

quartz veins with coarse pyrite cross-cutting potassically altered monzonite (TUDDH-658, 69.5 m). Top

right: Breccia zone with coarse-grained honey sphalerite and pyrite (TUDDH-657, 109.7 m). Bottom left:

Stockwork-style veining with diffuse alteration halos and pyrite, sphalerite, and galena. (TGC-0081, 92.3

m). Bottom middle: Stockwork-style silica-pyrite-sphalerite-galena veins within altered monzonite

(TUDDH-668, 127.2 m). Bottom right: Close-up view of coarse-grained pyrite within a zone of

stockwork-style silica-pyrite veining. Specks of visible gold are highlighted in the yellow circles, width of

image is approximately 3.5 cm (TUDDH-672, 141.3 m). Core diameter is 4.76 cm in each photo.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2178/186094_75460e161458d8e2_005full.jpg

About Tuvatu

The Tuvatu Alkaline Gold Project is located on the island of Viti Levu in Fiji. The January 2018 mineral

resource for Tuvatu as disclosed in the technical report "Technical Report and Preliminary Economic

Assessment for the Tuvatu Gold Project, Republic of Fiji", dated September 25, 2020, and prepared by

Mining Associates Pty Ltd of Brisbane Qld, comprises 1,007,000 tonnes indicated at 8.50 g/t Au

(274,600 oz. Au) and 1,325,000 tonnes inferred at 9.0 g/t Au (384,000 oz. Au) at a cut-off grade of 3.0

g/t Au.

The technical report is available on the Lion One website at

www.liononemetals.com

and on the

SEDAR website at

www.sedarplus.ca

.

Qualified Person

In accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-

101"), Sergio Cattalani, P.Geo, Senior Vice President Exploration, is the Qualified Person for the

Company and has reviewed and is responsible for the technical and scientific content of this news

release.

QAQC Procedures

Lion One adheres to rigorous QAQC procedures above and beyond basic regulatory guidelines in

conducting its sampling, drilling, testing, and analyses. The Company utilizes its own fleet of diamond

drill rigs, using PQ, HQ and NQ sized drill core rods. Drill core is logged and split by Lion One personnel

on site. Samples are delivered to and analyzed at the Company's geochemical and metallurgical

laboratory in Fiji. Duplicates of all samples with grades above 0.5 g/t Au are both re-assayed at Lion

One's lab and delivered to ALS Global Laboratories in Australia (ALS) for check assay determinations.

All samples for all high-grade intercepts are sent to ALS for check assays. All samples are pulverized to

85% passing through 75 microns. Gold analysis is carried out using fire assay with an AA finish.

Samples that have returned grades greater than 10.00 g/t Au are then re-analyzed by gravimetric

method. For samples that return greater than 0.50 g/t Au, repeat fire assay runs are carried out and

repeated until a result is obtained that is within 10% of the original fire assay run. Lion One's laboratory

can also assay for a range of 71 other elements through Inductively Coupled Plasma Optical Emission

Spectrometry (ICP-OES), but currently focuses on a suite of 9 important pathfinder elements. All

duplicate anomalous samples are sent to ALS labs in Townsville QLD and are analyzed by the same

methods (Au-AA26, and Au-GRA22 where applicable). ALS also analyses 33 pathfinder elements by

HF-HNO3-HClO4 acid digestion, HCl leach and ICP-AES (method ME-ICP61).

About Lion One Metals Limited

Lion One's flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project,

located on the island of Viti Levu in Fiji. Lion One envisions a low-cost high-grade underground gold

mining operation at Tuvatu coupled with exciting exploration upside inside its tenements covering the

entire Navilawa Caldera, an underexplored yet highly prospective 7km diameter alkaline gold system.

Lion One's CEO Walter Berukoff leads an experienced team of explorers and mine builders and has

owned or operated over 20 mines in 7 countries. As the founder and former CEO of Miramar Mines,

Northern Orion, and La Mancha Resources, Walter is credited with building over $3 billion of value for

shareholders.

On behalf of the Board of Directors of

Lion One Metals Limited

"

Walter Berukoff

", Chairman and CEO

Contact Investor Relations

Toll Free (North America) Tel: 1-855-805-1250

Email:

[email protected]

Website:

www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider accepts

responsibility for the adequacy or accuracy of this release

This press release may contain statements that may be deemed to be "forward-looking statements"

within the meaning of applicable Canadian securities legislation. All statements, other than

statements of historical fact, included herein are forward-looking information. Generally, forward-

looking information may be identified by the use of forward-looking terminology such as "plans",

"expects" or "does not expect", "proposed", "is expected", "budget", "scheduled", "estimates",

"forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words

and phrases, or by the use of words or phrases which state that certain actions, events or results may,

could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals

Limited's current beliefs and is based on information currently available to Lion One Metals Limited

and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include,

but are not limited to, the actual results of exploration projects being equivalent to or better than

estimated results in technical reports, assessment reports, and other geological reports or prior

exploration results. Forward-Looking information is subject to known and unknown risks, uncertainties

and other factors that may cause the actual results, level of activity, performance or achievements of

Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied

by such forward-looking information. Such risks and other factors may include, but are not limited to:

the stage development of Lion One Metals Limited, general business, economic, competitive,

political and social uncertainties; the actual results of current research and development or

operational activities; competition; uncertainty as to patent applications and intellectual property

rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals;

changes in legislation, including environmental legislation, affecting mining, timing and availability of

external financing on acceptable terms; not realizing on the potential benefits of technology;

conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals.

Although Lion One Metals Limited has attempted to identify important factors that could cause actual

results to differ materially from those contained in forward-looking information, there may be other

factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should

not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake

to update any forward-looking information, except in accordance with applicable securities laws.

Appendix 1: Full Drill Results and Collar Information

Table 2

. Composited results from grade control and infill drillholes in the Zone 5 area (grade >3.0 g/t Au)

Hole ID

From

To

Interval (m)

Au (g/t)

TGC-0081

92.1

95.1

3

18.56

including

92.1

92.4

0.3

101.89

and

92.4

92.7

0.3

35.02

TGC-0084

99.3

103.2

3.9

11.31

including

99.6

99.9

0.3

28.93

and

100.8

101.1

0.3

65.29

TGC-0086

82.3

84.1

1.8

3.98

TGC-0088

75.7

76.9

1.2

5.87

TGC-0093

99

99.9

0.9

4.65

TGC-0096

87.4

88

0.6

13.31

TGC-0098

104.8

105.1

0.3

5.19

TGC-0098

107.8

108.4

0.6

6.29

TGC-0098

111.4

111.7

0.3

6.18

TGC-0101

125.7

126.9

1.2

16.6

including

125.7

126.3

0.6

24.37

TGC-0107

136.2

136.8

0.6

38.75

including

136.2

136.5

0.3

64.1

and

136.5

136.8

0.3

13.4

TGC-0107

138

139.2

3211.2

5.21

TUDDH-657

109.6

111.1

1.5

9.32

including

109.6

109.9

0.3

35.89

and

110.8

111.1

0.3

10.25