Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LIO.V ·

Lion One Commences Drilling at Navilawa Tuvatu, Fiji

Exploration Programs

Lion One Commences Drilling at Navilawa Tuvatu, Fiji

North Vancouver, British Columbia--(Newsfile Corp. - June 11, 2020) -

Lion One Metals Limited

(TSXV: LIO) (OTCQX:

LOMLF) (ASX: LLO)

("Lion One" or the "Company")

is pleased to announce its #2 diamond drill has commenced drilling at

a newly defined high-grade target called Biliwi within the new Navilawa tenement. In a news release dated February 19

th

, 2020,

Lion One discussed discovery of high-grade surface samples at Biliwi that included 60.4 g/t Au over 0.40 m, 94.8 g/t Au over

0.40 m, 17.90 g/t Au over 0.75 m and 83.60 g/t Au over 0.45 m. The first hole has been planned to test the Biliwi lode at a depth

of approximately 55 m below surface. Further step-out holes are planned at Biliwi subsequent to successful interception of the

targeted lode.

Surface sampling has recommenced within the Navilawa tenement since beginning of the dry season a couple weeks ago with

current effort focused around the Banana Creek prospect where surface samples collected earlier this year yielded 19.4 g/t Au

over 0.85 m, 10.83 g/t Au over 1.00 m and 35.30 g/t Au over 0.45 m. Lion One believes Banana Creek is emerging as a very

high priority greenfields target in need of near-term drill testing. Further work is planned at the Matanavatu prospect where earlier

surface samples returned 32.30 g/t Au over 0.65 m, 35.88 g/t Au over 0.60 m, and 53.60 g/t Au over 0.13 m. Lion One

anticipates testing multiple new high priority greenfields drill targets within the Navilawa tenement this dry season which

continues until late-year.

At Tuvatu, the #1 diamond drill is currently drilling hole TUDDH497 at the same azimuth but 6 degrees steeper than recently

completed hole TUDDH496. Both of these holes test the east-west trending Murau lodes, part of the Tuvatu West lode network.

Stephen Mann, Managing Director of Lion One commented "We are very excited by the structures identified in the last few holes

(TUDDH 494, 495, 496 and 497). We have clearly demonstrated that the structural corridors highlighted in the CSAMT

geophysical survey are real and are the host of mineralising fluids. The intervals drilled into these structural corridors have

intersected zones of very good alteration including pyrite, carbonate and alkaline feldspars, as well as traces of base metals

which have proven to be good pathfinders. In addition, several very fine specks of visible gold have also been recognised. The

lodes at Tuvatu West have returned previously reported very high grade intersections including TUDDH371 14.99m @14.28 g/t

Au (see News Release 15

th

July 2013), TUDDH365 4.31m @ 14.95 g/t Au, and TUDDH364 6.43m @12.74 g/t Au (see News

Release 15

th

May 2013), and it is expected that TUDDH496 and 497 will add significantly more geological information in the

area." Assays from both of these holes will be reported to the market once they have been finalised.

Upon completion of hole TUDDH497, the #1 rig will return to the same drill pad as deep drill holes TUDDH494 and TUDDH495.

Following a review of the core in both TUDDH494 and 495 by the Lion One geologist and the Company's drilling team, it has

been determined that re-entering those holes as planned was too high a risk for loss of equipment. Consequently, an adjacent

hole will be completed to test the depth extent of TUDDH495 following the completion of TUDDH497. The Company now has

received the smaller diameter NQ drill rods ensuring the target depth of around 1000m is attainable. Both TUDDH494 and

TUDDH495 targeted deep parts of the main north-south trending Tuvatu lode system. Lion One believed these holes would

begin to confirm the presence of deep-seated lodes and lode feeders in this area. Additional deep drill holes are planned under

the Tuvatu resource area to further elucidate the lode system at depth.

In a news release dated April 30

th

, 2020, Lion One announced it has purchase a third drill rig. The arrival of this drill rig into Fiji

has been delayed overseas due to the current pandemic and is now expected to be shipped late July. The addition of this rig will

enable Lion One to successfully complete its goal of drilling in excess of 20,000 m of diamond core across the entire Tuvatu gold

project over the next 12 months.

Qualified Person

The scientific and technical content of this news release has been reviewed, prepared, and approved by Mr. Stephen Mann, P.

Geo, Managing Director of Lion One, who is a qualified person pursuant to National Instrument 43-101 - Standards of disclosure

for Mineral Projects ("NI-43-101).

About Tuvatu

The Tuvatu gold deposit is located in on the island of Viti Levu in the South Pacific island nation of Fiji. The mineral resource for

Tuvatu as disclosed in the technical report "Tuvatu Gold Project PEA", dated June 1, 2015, and prepared by Mining Associates

Pty Ltd of Brisbane Qld, comprises 1,120,000 tonnes indicated at 8.17 g/t Au (294,000 oz. Au) and 1,300,000 tonnes inferred at

10.60 g/t Au (445,000 oz. Au) at a cut-off grade of 3 g/t Au.

The technical report is available on the Lion One website at

www.liononemetals.com

and on the SEDAR website at

www.sedar.com

.

About Lion One Metals Limited

Lion One's flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project, located on the island of Viti

Levu in Fiji. Lion One envisions a low-cost high-grade underground gold mining operation at Tuvatu coupled with exciting

exploration upside inside its tenements covering the entire Navilawa Caldera, an underexplored yet highly prospective 7km

diameter alkaline gold system. Lion One's CEO Walter Berukoff leads an experienced team of explorers and mine builders and

has owned or operated over 20 mines in 7 countries.

As the founder and former CEO of Miramar Mines, Northern Orion, and La

Mancha Resources, Walter is credited with building over $3 billion of value for shareholders.

On behalf of the Board of Directors of

Lion One Metals Limited

"

Walter Berukoff

"

Chairman and CEO

For further information

Contact Investor Relations

Toll Free (North America) Tel: 1-855-805-1250

Email:

[email protected]

Website:

www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider accepts responsibility for the adequacy or

accuracy of this release.

This press release may contain statements that may be deemed to be "forward-looking statements" within the meaning of

applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward

looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such

as "plans", "expects" or "does not expect", "proposed", "is expected", "budget", "scheduled", "estimates", "forecasts",

"intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases, or by the use of words

or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-

looking information reflects Lion One Metals Limited's current beliefs and is based on information currently available to Lion

One Metals Limited and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include, but

are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical

reports, assessment reports, and other geological reports or prior exploration results. Forward-looking information is subject

to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or

achievements of Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied by

such forward-looking information. Such risks and other factors may include, but are not limited to: the stage development of

Lion One Metals Limited, general business, economic, competitive, political and social uncertainties; the actual results of

current research and development or operational activities; competition; uncertainty as to patent applications and intellectual

property rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals; changes in

legislation, including environmental legislation, affecting mining, timing and availability of external financing on acceptable

terms; not realizing on the potential benefits of technology; conclusions of economic evaluations; and lack of qualified, skilled

labour or loss of key individuals. Although Lion One Metals Limited has attempted to identify important factors that could

cause actual results to differ materially from those contained in forward-looking information, there may be other factors that

cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on

forward-looking information. Lion One Metals Limited does not undertake to update any forward-looking information, except in

accordance with applicable securities laws.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/57644