Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LIFT.V ·

LIFT Intersects 79 Metres at 1.13% Li2O and 39 Metres at 1.43% Li2O at the Fi Southwest Pegmatite, Yellowknife Lithium Project, NWT, Canada

Drill Results

LIFT Intersects 79 Metres at 1.13% Li2O and 39

Metres at 1.43% Li2O at the Fi Southwest

Pegmatite, Yellowknife Lithium Project, NWT,

Canada

Vancouver, British Columbia--(Newsfile Corp. - July 25, 2023) - Li-FT Power Ltd.

(CSE: LIFT) (OTC

Pink: LIFFF) (FSE: WS0)

("

LIFT

" or the "

Company

") is pleased to report that initial assays from the

first five drill holes completed at the Fi Southwest pegmatite within the Yellowknife Lithium Project

("YLP") located outside the city of Yellowknife, Northwest Territories. Drill results have confirmed

spodumene mineralization over 320m of strike length, to a depth of approximately 150m from surface at

the Fi Southwest dyke which remains open in all directions. Drilling is ongoing on the remainder of the

dyke, which is currently testing a total of 1,100 metres of strike-length to a depth of 250 metres.

Highlights:

Hole

From (m)

1

To (m)

Interval (m)

2

Li

2

O (%)

3

YLP0001

73

108

35

1.30

inc.

75

102

27

1.58

YLP0002

180

214

34

0.34

YLP0003

55

94

39

1.43

inc.

57

92

35

1.57

YLP0004

55

88

33

1.39

inc.

56

85

29

1.55

YLP0005

4

52

131

79

1.13

inc.

73

129

56

1.42

1

From, to, and interval lengths in metres, as measured down core axis, not true width.

2

Individual sample lengths = 1 metre.

3

Lithium assays performed by ALS Global on saw cut half HQ core using method ME-

ICP82b; results reported in Li%, converted to Li

2

O by

multiplying by 2.154.

4

Drilled down-dip due to access restriction.

Francis MacDonald, CEO of LIFT comments, "We are very encouraged with these first drill results at the

Yellowknife Lithium Project. The widths and grades of lithium and spodumene intersected in these holes

are similar to what was historically reported in the 1950s to 1980s

1

. 8 different pegmatites will be drilled

this summer with 45,000 metres of drilling that will utilize six drill rigs.

We look forward to reporting

additional results in the coming weeks and month. We believe that these initial drill results show that the

YLP has excellent potential to become one of the next destinations in North America to define significant

spodumene resources."

Figure 1 - Location of LIFT's Yellowknife Lithium Project. Drilling will focus on the Road Access Group

of pegmatites which are located to the east of the city of Yellowknife along a government-maintained

paved highway. The Fi Southwest pegmatite is located within the Fi mineral lease.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_001full.jpg

Discussion of Drill Results

Holes YLP0001 to YLP0005 were targeting the Fi Southwest dyke and have confirmed spodumene

mineralization over 320 metres of strike length, to a depth of approximately 150 metres from surface.

Drilling targeted extensions to depth below surface exposures of 5-30% spodumene mapped and

trenched in the 1970's

1

. Results reported are for intercepts of pegmatite that were sampled at one metre

intervals with assays for lithium averaged over the total intercept length. In some holes one metre

inclusions of host rock metasediments were included in the assayed intervals (i.e., YLP0002: two

intervals; YLP005: one interval). The mineralogy of the dyke is quite simple, consisting of feldspar,

quartz, spodumene and lessor primary muscovite. Spodumene in drill core ranges from 0.5 to 5

centimetre in size with the average crystal size being 2 centimetres. Drilling is ongoing on the remainder

of the dyke, which is currently testing a total of 1,100 metres of strike length to a depth of 250 metres.

Figure 2 - Plan view showing the surface expression of the Fi Southwest pegmatite with diamond drill

holes reported in this press release.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_002full.jpg

Operations Update

LIFT is pleased to report that the Company has completed construction of a 49-person camp around the

Hidden Lake area which is proximal to the Fi, Shorty, and Ki mineral leases. With increased camp

capacity the Company is currently drilling with three diamond drill rigs

out of the Hidden Lake camp and

is drilling pegmatite targets on the Fi Southwest, Fi Main, Shorty, Ki, and Ki extension on to the Perlis

lease. Two drills have been deployed to the Big East pegmatite and are currently drilling this target. One

additional drill rig will start drilling in August at the Echo target bringing the total drill rig count to six. To

date, 9,246 meters of drilling have been completed over 56 drill holes.

Figure 3 - Cross-section of YLP0004 which intersected 33 meters at 1.39% Li

2

O drilling beneath the

outcropping exposure of the Fi Southwest pegmatite dyke.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_003full.jpg

Figure 4 - Cross-section of YLP0005 which intersected 79 metres at 1.13% Li

2

O drilling beneath the

outcropping exposure of the Fi Southwest pegmatite dyke. Note that YLP0005 was drilled down-dip

due to swampy ground on the southeast side of the outcrop.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_004full.jpg

Figure 5 - Down-dip view of the current geological model of the Fi Southwest pegmatite.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/174718_383b3928c4de7a02_005full.jpg

Table 2 - Drill collars table of reported drill holes

Hole No.

Northing

1

Easting

1

Elevation (m)

Length (m)

Azimuth

Dip

YLP0001

6,940,700

371,267

250

228

302

45

YLP0002

6,940,695

371,371

250

131

300

50

YLP0003

6,940,748

371,285

250

110

300

45

YLP0004

6,940,836

371,351

248

102

315

45

YLP0005

6,940,628

371,073

248

150

110

45

1

UTM NAD83 zone 12

QA/QC and Core Sampling Protocols

All drill core samples were collected under the supervision of LIFT employees and contractors. Drill core

was transported from the drill platform to the logging facility where it was logged, photographed, and split

by diamond saw prior to being sampled. Samples were then bagged, and blanks and certified reference

materials were inserted at regular intervals. Field duplicates consisting of quarter-cut core samples were

also included in the sample runs. Groups of samples were placed in large bags, sealed with numbered

tags in order to maintain a chain-of-custody, and transported from LIFT's core logging facility to ALS

Labs ("ALS") laboratory in Yellowknife, Northwest Territories.

Sample preparation and analytical work for this drill program were carried out by ALS. Samples were

prepared for analysis according to

ALS method CRU31: individual samples were crushed to 70%

passing through 2 mm (10 mesh) screen; a 1,000 g sub-sample was riffle split (SPL-21) and then

pulverized (PUL-32) such that 85% passed through 75 um (200 mesh) screen. A 0.2 g sub-sample of the

pulverized material was then dissolved in a sodium peroxide solution and analysed for lithium according

to ALS method ME-ICP82b. Another 0.2 g sub-sample of the pulverized material was analysed for 53

elements according to ALS method ME-MS89L. All results passed the QA/QC screening at the lab, all

inserted standards and blanks returned results that were within acceptable limits.

References

1

NI 43-101 Technical Report On the Yellowknife Lithium Project, Northwest Territories, Canada (December 30, 2022) - Thomas Hawkins, PhD, P.Geo.

Filed on SEDAR on January 13, 2023

Qualified Person

The disclosure in this news release of scientific and technical information regarding LIFT's mineral

properties has been reviewed and approved by Carl Verley, P.Geo., Vice-President, Exploration of Li-

FT Power and a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for

Mineral Projects (NI 43-101). No QA/QC review is available in relation to historical sampling and drilling

on the Yellowknife project and results have not been verified by a qualified person as defined by NI 43-

101. Past sampling and drilling results are not necessarily indicative of future results or performance

from the Yellowknife property.

About LIFT

LIFT is a mineral exploration company engaged in the acquisition, exploration, and development of

lithium pegmatite projects located in Canada. The Company's flagship project is the Yellowknife Lithium

Project located in Northwest Territories, Canada. LIFT also holds three early-stage exploration

properties in Quebec, Canada with excellent potential for the discovery of buried lithium pegmatites, as

well as the Cali Project in Northwest Territories within the Little Nahanni Pegmatite Field.

For further information, please contact:

Francis MacDonald

Chief Executive Officer

Tel:

+ 1.604.609.6185

Email:

[email protected]

Website:

www.li-ft.com

Cautionary Statement Regarding Forward-Looking Information

Certain statements included in this press release constitute forward-looking information or statements

(collectively, "forward-looking statements"), including those identified by the expressions "anticipate",

"believe", "plan", "estimate", "expect", "intend", "may", "should" and similar expressions to the extent

they relate to the Company or its management. The forward-looking statements are not historical facts

but reflect current expectations regarding future results or events. This press release contains forward-

looking statements. These forward-looking statements are based on current expectations and various

estimates, factors and assumptions and involve known and unknown risks, uncertainties and other

factors.

Forward-looking statements are not a guarantee of future performance and involve risks, uncertainties

and assumptions which are difficult to predict. Factors that could cause the actual results to differ

materially from those in forward-looking statements include the continued availability of capital and

financing, and general economic, market or business conditions, including the effects of COVID-19.

Forward-looking statements contained in this press release are expressly qualified by this cautionary

statement. These statements should not be read as guarantees of future performance or results. Such

statements involve known and unknown risks, uncertainties and other factors that may cause actual

results, performance or achievements to be materially different from those implied by such

statements. Although such statements are based on management's reasonable assumptions, there

can be no assurance that the statements will prove to be accurate or that management's expectations

or estimates of future developments, circumstances or results will materialize. The Company

assumes no responsibility to update or revise forward-looking information to reflect new events or

circumstances unless required by law. Readers should not place undue reliance on the Company's

forward-looking statements.

Neither the Canadian Securities Exchange (the "CSE") nor its Regulation Services Provider (as that

term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/174718