Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LIFT.V ·

Li-FT Starts Drilling at the Rupert Lithium Project, Quebec

Exploration Programs

Li-FT Starts Drilling at the Rupert Lithium

Project, Quebec

Vancouver, British Columbia--(Newsfile Corp. - March 29, 2023) - Li-FT Power Ltd. (CSE:

LIFT

)

(FSE:

WS0

) ("

LIFT

" or the "

Company

") is pleased to announce it has commenced the first diamond

drill program at the Rupert Lithium Project located in the James Bay region of Quebec.

A total of 17

holes have been planned for 5,000 meters of diamond drilling that will test targets generated by the 2021

and 2022 exploration programs (see press release dated November 9, 2022 for details).

Francis MacDonald, CEO of Li-FT comments, "We have systematically explored approximately 2,000

square kilometers of prospective geology that hosts the Whabouchi Lithium Deposit (37.4 million tons at

1.48% Li

2

O

1

) and has generated nine high-quality targets for follow-up exploration. Our first drill program

will target two robust lithium anomalies at Target A and B in the right geological setting proximal to a

large granite intrusion. These anomalies are large enough to represent a significant spodumene

occurrence in one of the most exciting lithium pegmatite districts on the planet".

a

Figure 1a

- Rupert Drill Targets A & B with geology and lithium concentrations as percentile from the

2021 and 2022 till geochemistry surveys (see press release dated November 9, 2022). The lithium

dispersion anomalies overlie folded metasedimentary rocks of the Eastmain Group & Champion

Complex granites and pegmatites, which also hosts the Whabouchi lithium deposit located 10

kilometers to the southwest

.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/160325_a376f8cea47d99f9_004full.jpg

b

Figure 1b

: Exploration drill hole collars relative to the lithium dispersion train heads.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/160325_a376f8cea47d99f9_006full.jpg

Initial Rupert Program Targeting Lithium Pegmatites under Cover

The lithium anomalies at Rupert A and B Targets overlie folded metasedimentary rocks of the Eastmain

Group (2730-2740 Ma) and Champion Complex granites and pegmatites (~2690 Ma; Figure 1a), known

for hosting economic Li-bearing pegmatites elsewhere in the region (i.e., Whabouchi deposit;

37.4

million tons at 1.48% Li

2

O

1

; Figure 1a and 1b).

To enhance targeting under widespread glacial till cover, a geological targeting model has been

produced from the 3D inversion of property-wide magnetics data and combined with government survey

maps, field observations and LiDAR.

Favourable structures for emplacement of pegmatite dykes were

identified in the model and targeted where they trend under the heads of the lithium dispersion

anomalies (Figures 2-4).

Based on the tenor, size, and geometry of the dispersion anomalies presented

at Targets A and B, the LIFT

technical team believes there could be a significant spodumene occurrence

hidden below either target.

Figure 2

- Tenor and geometry of the dispersion trains at Targets B & A. Target B has a short stubby

dispersion train which terminates abruptly in an elongate WNW orientation. Target A has a long

narrow dispersion train that terminates abruptly against a N-S oriented lake. Both have classic decay

curves leading back to source.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/160325_a376f8cea47d99f9_007full.jpg

Target B Drill Plans

At Target B, nine drill holes are planned for a total of 2,500 meters.

Holes are planned to cross the head

of a 1 kilometer long, Li-in-tills dispersion train where the head terminates abruptly against a structure in

a WNW direction (Figure 2).

Holes are positioned along the entire 1.4 kilometer length of the WNW

termination targeting linear magnetic lows that trend in the same direction (Figure 2-4). Mapping in the

target area in 2022 also reveals numerous WNW-trending muscovite-bearing pegmatite dykes are

present in the target area, including a muscovite-beryl-bearing pegmatite dyke grading 0.1% Li

2

O.

Spodumene grains in tills were also observed across the dispersion train in an indicator mineral

sampling program completed by LIFT and processed by Overburden Drilling Management. The

presence of spodumene grains within the till geochemistry anomaly suggests that underlying bedrock

might also contain spodumene.

Target A Drill Plans

Target A is located 3 kilometers to the northwest of Target B at the head of a 3 kilometer long Li-in-tills

dispersion train (Figure 2).

The dispersion train is oriented in a northwest-southwest orientation where it

disappears under a N-S oriented lake (Figure 3).

Eight exploration holes totaling 2,500 meters have

been planned to cover the entire 1.2 kilometer length of the head.

A broad north-northwest linear

magnetic low, possibly representing a regional structure, has been targeted in geophysics where the

dispersion train disappears under the lake (Figure 2-4). Ancillary holes have also been planned at the

southwest edge of the lake testing northeast-trending magnetic gradients (Figure 4), where a muscovite-

bearing dyke has been mapped on surface trending in the same direction.

No other outcrop has been

observed in the field.

Spodumene grains in tills were also observed across the dispersion train in an

indicator mineral sampling program completed by LIFT and processed by Overburden Drilling

Management. The presence of spodumene grains within the till geochemistry anomaly suggests that

underlying bedrock might also contain spodumene.

Figure 3

- Drilling at Targets A & B will focus on the up-ice terminations of the Li-in-tills anomalies.

The linear nature of the terminations of the heads implies that they terminate at structures.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/160325_a376f8cea47d99f9_010full.jpg

Figure 4

- Magnetics gradients at the heads of the Li-in-tills dispersion trains, with proposed drill

holes. The magnetics gradients potentially map important structures where the trains terminate.

These locations are considered highly prospective for emplacement of Li-bearing pegmatites.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8766/160325_a376f8cea47d99f9_011full.jpg

Qualified Person

Don Cummings, P.Geo (OGQ # 2183), independent consultant to Li-FT Power Ltd., Qualified Person

under NI 43- 101 on standards of disclosure for mineral projects, has reviewed and approved the

technical content of this release.

About Li-FT

Li-FT is a mineral exploration company engaged in the acquisition, exploration, and development of

lithium pegmatite projects located in Canada. The Company's flagship project is the Yellowknife Lithium

Project located in Northwest Territories, Canada. Li-FT also holds three early-stage exploration

properties in Quebec, Canada with excellent potential for the discovery of buried lithium pegmatites, in

addition to the Cali Project in Northwest Territories within the Little Nahanni Pegmatite Field.

For further information, please contact:

Francis MacDonald

Chief Executive Officer

Tel:

Canada:

+1.778.322.8705

Germany: +49.1522.1073741

Email:

[email protected]

Website:

www.li-ft.com

Cautionary Statement Regarding Forward-Looking Information

Certain statements included in this press release constitute forward-looking information or statements

(collectively, "forward-looking statements"), including those identified by the expressions "anticipate",

"believe", "plan", "estimate", "expect", "intend", "may", "should" and similar expressions to the extent

they relate to the Company or its management. The forward-looking statements are not historical facts

but reflect current expectations regarding future results or events. This press release contains forward-

looking statements. These forward-looking statements are based on current expectations and various

estimates, factors and assumptions and involve known and unknown risks, uncertainties and other

factors.

Forward-looking statements are not a guarantee of future performance and involve risks, uncertainties

and assumptions which are difficult to predict. Factors that could cause the actual results to differ

materially from those in forward-looking statements include the continued availability of capital and

financing, and general economic, market or business conditions, including the effects of COVID-19.

Forward-looking statements contained in this press release are expressly qualified by this cautionary

statement. These statements should not be read as guarantees of future performance or results. Such

statements involve known and unknown risks, uncertainties and other factors that may cause actual

results, performance or achievements to be materially different from those implied by such

statements. Although such statements are based on management's reasonable assumptions, there

can be no assurance that the statements will prove to be accurate or that management's expectations

or estimates of future developments, circumstances or results will materialize. The Company

assumes no responsibility to update or revise forward-looking information to reflect new events or

circumstances unless required by law. Readers should not place undue reliance on the Company's

forward-looking statements.

Neither the Canadian Securities Exchange (the "CSE") nor its Regulation Services Provider (as that

term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this

release.

1

Mineral resource estimate from 43-101 technical report titled “NI 43-101 TECHNICAL REPORT FEASIBILITY STUDY ON THE WHABOUCHI

LITHIUM MINE AND SHAWINIGAN ELECTROCHEMICAL PLANT” dated February 21, 2018, authored by Dupere et al. Resource quoted is within

Table 1.4 – Whabouchi Deposit in Pit Mineral Resource Estimate: Measured – 16,953,000 tons at 1.57% Li2O, Indicated – 20,403,000 tons at

1.41% Li2O (Cut-off grade of 0.30% Li¬2O)

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/160325