Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LI.V ·

Recent Drilling at TLC Significantly Expands Higher Grade, Near Surface Lithium Mineralization

Exploration Programs

Recent Drilling at TLC Significantly Expands Higher Grade, Near Surface Lithium

Mineralization

VANCOUVER, BRITISH COLUMBIA, December 8, 2023 – American Lithium Corp. (“American Lithium” or

the “Company”) (TSX-V:LI | Nasdaq:AMLI | Frankfurt:5LA1) is pleased to announce results from 14 step

out drill holes expanding the measured resource footprint at the Tonopah Lithium Project (“TLC”), located

near the town of Tonopah, in Nevada. A total of 26 diamond core holes and 16 Reverse Circulation (“RC”)

holes drilled in 2022 and 2023 will be added to the updated mineral resource block model and

incorporated into an updated Mineral Resource Estimate (“MRE”) on TLC.

The Company also announces it has commenced early work which will be used to support mine permitting

applications following the completion of the pre -feasibility and associated study in H2, 2024. It has

appointed SRK Consulting (U.S.) Inc. of Elko , Nevada to coordinate the preparation of a mine plan of

Operations with the BLM. Additionally, the Company has selected Nexus Environmental Consultants Inc.

of Reno, Nevada to perform biological baseline studies in support of the Mine Plan of Operations

application.

TLC Drilling Highlights

• Post-resource drilling demonstrates continued expansion of TLC lithium deposit and continuity with

significant intervals of claystone Lithium (“Li”) mineralization >1,000 ppm Li at shallow depths;

• Extension of measured resource footprint in all directions (see Figure 1);

• 73.1 metres (“m”) averaging 1,148 ppm Li in TLC-2222C between 17.1-90.2 m downhole with up to

1,843 ppm Li over 1.5 m;

• 81.4 m averaging 1,135 ppm Li in TLC-2321C between 27.1-108.5 m downhole with up to 2,127 ppm

Li over 1.5 m;

• 80.8 m averaging 1,090 ppm Li in TLC-2242 between 3.0-83.8 m downhole with up to 2,008 ppm Li

over 1.5 m; (see Tables of Select Diamond and RC Drill Hole Results);

• Identification of additional shallow, high-grade lithium mineralization to the northeast should grow

the MRE and positively impact project economics;

• Drill results will further refine the pre-feasibility study mine plan; and

• Data from all additional 42 dri ll holes has been sent to Stantec Consulting Inc. and will be

incorporated into an updated MRE for the TLC Project.

Simon Clarke, CEO of American Lithium , states, “We continue to make excellent progress at TLC . Drill

results from the remainder of our 2022 program and our expansion drilling in 2023 should add significantly

to the very large existing Measured & Indicated Resource . In addition, the thick, shallow higher-grade

sections added should further enhance robust project economics and will be reflected in an updated TLC

mine plan in the PFS. Our confidence in the Project continues to grow a nd we have now launched work

with SRK and Nexus which will feed into and help us fast -track the mine permitting process following

completion of the PFS is in 2024.”

TLC Select Drill Hole - Details

RC drill holes:

• TLC-2240, 2241 and 2242 as well as diamond drill holes TLC-2318C, 2320C, 2321C and 2333C were

all drilled to the north of the existing Measured Resource footprint and extend the shallow, high

grade lithium mineralization approximately 850 m to the north. TLC-2333C marks the

northernmost mineralized hole with > 1,000 ppm Li intersected over appreciable thicknesses.

Diamond drill holes:

• TLC-2222C was drilled in the west central resource area and essentially fills in a historic gap in the

resource from 2000 era drilling that was not drilled deep enough.

• TLC-2228C was drilled in the central northwestern area to fill in a statistical gap in the Measured

resource footprint.

• TLC-2320C and 2221C were drilled to in-fill an existing gap in Measured Resource footprint in the

south-central resource area.

• TLC-2218C and 2219C were drilled along the southeastern edge of the Measured resource

footprint to extend and confirm lithium mineralization.

• TLC-2213C was drilled on the eastern side of the project area, and extends the mineralized

footprint with lower grade, but above cut-off grade Li mineralization marking the east central limit

of the TLC Deposit high-grade footprint.

Link 1 – PDF Figures

Link 2 – PDF Drill Hole Table

Figure 1 – TLC Project Drill Hole Location Map – Select Holes with Mineral Resource Estimate Footprint

Tables of Select Diamond and RC Drill Hole Results

TLC-2240 – vertical RC

520’ total depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

25 195 170 7.6 59.4 51.8 1027

including 30 145 115 9.1 44.2 35.1 1173

Maximum 75 80 5 1871

TLC-2241– vertical RC

370’ total depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

40 210 170 12.2 64.0 51.8 1080

including 40 160 120 12.2 48.8 36.6 1190

Maximum 95 100 1915

TLC-2242 – vertical RC

370’ total depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

10 275 265 3.0 83.8 80.8 1090

including 140 260 120 42.7 79.3 36.6 1286

Maximum 145 150 5 2008

TLC-2318C – vertical

Diamond 317’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

23 170 147 7.0 51.8 44.8 1007

including 48 135 87 14.6 41.1 26.5 1255

Maximum 72 75 3 2063

TLC-2320C – vertical

Diamond 608’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

240 328 88 73.2 100.0 26.8 921

including 293 328 35 89.3 100.0 10.7 1163

Maximum 303 308 5 1590

TLC-2321C vertical

Diamond 453’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

89 356 267 27.1 108.5 81.4 1135

including 143 341 198 43.6 103.9 60.3 1268

Maximum 253 258 5 2177

TLC-2333C – vertical

Diamond 316 ’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

5 126 121 1.5 38.4 36.9 774

including 86 126 40 26.2 38.4 12.2 1184

Maximum 106 111 5 1532

TLC-2228C – vertical

Diamond 418 ’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

22 82 60 6.7 25.0 18.3 961

172 392 220 52.4 119.5 67.1 1422

Maximum 317 322 5 2266

TLC-2222C – vertical

Diamond 316 ’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

56 296 240 17.1 90.2 73.1 1148

including 116 296 180 35.3 90.2 54.9 1311

Maximum 266 271 5 1981

TLC-2220C – vertical

Diamond 31 5’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

18 98 80 997

Maximum 88 93 5 1650

TLC-2221C – vertical

Diamond 504’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

373 489 116 1014

including 413 489 76 1262

Maximum 478 483 5 1843

TLC-2218C – vertical

Diamond 317’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

226 308 82 924

including 276 283 57 1022

Maximum 226 232 6 1239

TLC-2219C – vertical

Diamond 340’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

73 258 185 890

including 148 218 70 1191

Maximum 153 158 5 1380

TLC-2213C – vertical

Diamond 303’ total

depth

From (feet) To (feet) Thickness

(feet)

From (m) To (m) Thickness

(m)

Li (ppm)

112 222 110 847

Maximum 217 222 5 1088

Quality Assurance, Quality Control and Data Verification

2022 Diamond drilling was conducted by First Drilling of Montrose, Colorado, and 2023 diamond drilling

was completed by IG Drilling of Spanish Fork, Utah using large diameter, PQ -size and HQ -size drilling

entirely vertical holes. Drill core samples are nominally 5-foot (1.53 m) and are cut longitudinally, and one

half is cut a second time longitudinally with a diamond saw with one-quarter of the core placed in sealed

bags and shipped to analytical laboratories.

Reverse Circulation (RC) drilling is being conducte d by Harris Exploration Drilling and Associates Inc., of

Fallon, Nevada with 5.5 -inch diameter face centred bit on vertical drill holes. Sampling was conducted

using a riffle splitter or a cyclone splitter depending on the moisture content of the sampled m aterial.

Sampling was conducted over 5-foot (1.52m) intervals with individual samples placed in sealed bags and

transported to the respective analytical labs.

Samples were shipped to either American Assay Laboratories (AAL) in Sparks, Nevada for sample

preparation, processing using 5 -acid digest and ICP -MS multi -element analysis. Pulps and rejects are

returned and retained by the Company. AAL is an ISO 9000 certified assay laboratory. The QA/QC program

includes a comprehensive analytical quality assurance and control routine comprising the systematic use

of Company inserted standards, blanks and field duplicate samples, internal laboratory standards and has

also included check analyses at other accredited laboratories. Downhole thicknesses for vertical drill holes

are considered accurate true thickness intersections for the essentially flat -lying, to gently dipping TLC

host stratigraphy.

Qualified Person

Mr. Ted O’Connor, P.Geo., Executive Vice President of American Lithium, and a Qualified Person as

defined by National Instrument 43 -101 Standards of Disclosure for Mineral Projects , has reviewed and

approved the scientific and technical information contained in this news release.

About American Lithium

American Lithium is actively engaged in the development of large -scale lithium projects within mining -

friendly jurisdictions throughout the Americas. The Company is currently focused on enabling the shift to

the new energy paradigm through the continued d evelopment of its strategically located TLC lithium

project (“TLC”) in the richly mineralized Esmeralda lithium district in Nevada, as well as continuing to

advance its Falchani lithium (“Falchani”) and Macusani uranium (“Macusani”) development-stage projects

in southeastern Peru. All three projects, TLC, Falchani and Macusani have been through robust preliminary

economic assessments, exhibit strong significant expansion potential and enjoy strong community

support. Pre-feasibility is advancing well TLC and Falchani.

For more information, please contact the Company at [email protected] or visit our website

at www.americanlithiumcorp.com

Follow us on Facebook, Twitter and LinkedIn.

On behalf of the Board of Directors of American Lithium Corp.

“Simon Clarke”

CEO & Director

Tel: 604 428 6128

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press

release.

Cautionary Statement Regarding Forward Looking Information

This news release contains certain forward -looking information and forward -looking statements

(collectively “forward -looking state ments”) within the meaning of applicable securities legislation. All

statements, other than statements of historical fact, are forward -looking statements. Forward -looking

statements in this news release include, but are not limited to, statements regarding the business plans,

expectations and objectives of American Lithium. Forward-looking statements are frequently identified by

such words as "may", "will", "plan", "expect", "anticipate", "estimate", "intend", “indicate”, “scheduled”,

“target”, “goal”, “potential”, “subject”, “efforts”, “option” and similar words, or the negative connotations

thereof, referring to future events and results. Forward-looking statements are based on the current

opinions and expectations of management and are not, and cannot be, a guarantee of future results or

events. Although American Lithium believes that the current opinions and expectations reflected in such

forward-looking statements are reasonable based on information available at the time, undue reliance

should not be placed on forward-looking statements since American Lithium can provide no assurance that

such opinions and expectations will prove to be correct. All forward-looking statements are inherently

uncertain and subject to a variety of assumptions, risks and uncertainties, including risks, uncertainties

and assumptions related to: American Lithium’s ability to achieve its stated goals, which could have a

material adverse impact on many aspects of American Lithium’s businesses including but not limited to:

the ability to access mineral properties for indeterminate amounts of time, the health of the employees or

consultants resulting in delays or diminished capacity, social or political instability in Peru which in turn

could impact American Lithium’s ability to maintain the continuity of its business operating requirements,

may result in the reduced availability or failures of various local administration and critical infrastructure,

reduced demand for the American Lithium’s potential products, availability of materials, global travel

restrictions, and the availability of insurance and the associated costs; the ongoing ability to work

cooperatively with stakeholders, including but not limited to local communities and all levels of

government; the potential for delays in exploration or development activities; the interpretation of drill

results, the geology, grade and continuity of mineral deposits; the possibility that any future exploration,

development or mining results will not be consistent with our expectations; risks that permits will not be

obtained as planned or delays in obtaining permits; mining and development risks, including risks related

to accidents, equipment breakdowns, labour disputes (including work stoppages, strikes and loss of

personnel) or other unanticipated difficulties with or interruptions in exploration and development; risks

related to commodity price and foreign exchange rate fluctuations; risks related to foreign operations; the

cyclical nature of the industry in which American Lithium operates; risks related to failure to obtain

adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental

approvals; risks related to environmental regulation and liability; political and regulatory risks associated

with mining and exploration; risks related to the uncertain global economic environment and the effects

upon the global market generally, any of which could continue to negatively affect global financial

markets, including the trading price of American Lithium’s shares and could negatively affect American

Lithium’s ability to raise capital and may also result in additional and unknown risks or liabilities to

American Lithium. Other risks and uncertainties related to prospects, properties and business strategy of

American Lithium are identified in the “Risk Factors” section of American Lithium’s Management’s

Discussion and Analysis filed on October 16, 2023, and in recent securities filings available at

www.sedarplus.ca. Actual events or results may differ materially from those projected in the forward-

looking statements. American Lithium undertakes no obligation to update forward-looking statements

except as required by applicable securities laws. Investors should not place undue reliance on forward-

looking statements.