Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LI.V ·

Critical Mineral Resource at Falchani Exceeds 400,000 t Cesium (M+Ind) Within Existing Lithium Resource Major Process Improvements Provide Additional Pilot Plant Optimization Input

Metallurgy & Processing

Critical Mineral Resource at Falchani Exceeds 400,000 t Cesium (M+Ind) Within

Existing Lithium Resource

Major Process Improvements Provide Additional Pilot Plant Optimization Input

VANCOUVER, British Columbia, Oct. 09, 2025 -- American Lithium Corp. (“American Lithium” or the “Company”) (TSX-V:LI |

OTCQX:AMLIF | Frankfurt:5LA1) is pleased to highlight the globally significant cesium resource contained within the Falchani

Lithium deposit and announce results of recent optimization work on the processing flowsheet, including the potential recovery

of cesium by-products.

Cesium is officially recognized as a critical mineral in both the U.S. and Canada due to its rarity, strategic importance, and

limited global supply. With the U.S. entirely reliant on imports, Falchani’s scale positions it as one of the world’s largest

cesium resources, with potential to strengthen North American supply chains.

Test work was completed at the Australian Nuclear Science and Technology Organization (“ANSTO”) laboratories in Sydney,

Australia. In parallel, TECMMINE in Lima, Peru, is currently testing newly acquired component equipment for the pilot plant

phase, which is expected to commence within a few months.

Falchani’s volcanic-style lithium mineralization, with naturally low impurities, supports a straightforward flowsheet that

produces high-purity lithium carbonate (>99.5%), meeting battery-grade specifications. Falchani mineralization is enriched in

cesium, potassium, and rubidium alongside lithium. Recent test work results demonstrate production of a saleable mixed

cesium sulphate product (~18% Cs) and high-quality sulphate of potash (“SOP”), with strong recoveries at low additional cost.

Additional work is planned to increase the cesium content of the sulfate by-product above 18% Cs.

The deposit contains a large-scale cesium resource within the lithium resource base (effective October 30, 2023):

• Measured: 69 Mt at 631 ppm Cs (43,539 t Cs)

• Indicated: 378 Mt at 1,039 ppm Cs (392,742 t Cs)

• Inferred: 506 Mt at 778 ppm Cs (393,668 t Cs)

Test work highlights and meaningful cost improvements include:

• Recycling 50% of acid streams maintains recoveries (Li 88%, Cs 85%, K 35%).

• Counter-current leaching reduces sulfuric acid use to ~240 kg/t acid consumption, nearly 50% lower than outlined in

the February 2024 PEA.

• Additional savings are expected from reduced reagent demand, smaller gypsum waste volumes, and lower tailings

costs.

• Soluble high purity crystalline SOP containing 45% K is produced at low temperatures after the cesium sulphate

precipitation.

Alex Tsakumis, Interim CEO of American Lithium stated: “The proven ability to process Falchani’s volcanic lithium rocks into

battery-grade lithium carbonate, cesium sulfate, and SOP demonstrates extensive technical progress. Flowsheet

improvements that lower costs and enhance project economics show we have advanced well beyond simple resource

endowment. Importantly, Peru is a net importer of SOP, and future Falchani operations could help meet domestic demand

while also supporting exports.”

Table 1 – Falchani Mineral Resource Estimate – updated October 30, 2023

Cutoff Volume Tonnes Li Million Tonnes (Mt) Cs K Rb

Li (ppm) (Mm^3) (Mt) (ppm) Li Li2CO3 LiOH*H2O (ppm) (%) ppm

Measured

600 29 69 2792 0.19 1.01 1.15 631 2.74 1171

1000 27 65 2915 0.19 1.01 1.15 647 2.71 1208

1200 25 61 3142 0.18 0.96 1.09 616 2.74 1228

Indicated

600 156 378 2251 0.85 4.52 5.14 1039 2.92 1055

1000 136 327 2472 0.81 4.31 4.9 1095 2.87 1104

1200 129 310 2549 0.79 4.20 4.78 1069 2.86 1146

Measured + Indicated

600 185 447 2327 1.04 5.53 6.29 976 2.90 1072

1000 163 392 2551 1.00 5.32 6.05 1021 2.84 1121

1200 154 371 2615 0.97 5.16 5.87 1009 2.84 1130

Inferred

600 198 506 1481 0.75 3.99 4.54 778 3.31 736

1000 138 348 1785 0.6 3.3 3.75 886 3.18 796

1200 110 276 1961 0.54 2.87 3.27 942 3.10 850

• CIM definitions are followed for classification of Mineral Resource.

• Mineral Resource surface pit extent has been estimated using a lithium carbonate price of US$20,000 per tonne and

mining cost of US$3.00 per tonne, a lithium recovery of 80%, fixed density of 2.40 g/cm 3 for the mineralized Upper

Breccia, Lithium Rich Tuff and Lower Breccia Geological Units and a fixed density of 2.70 g/cm 3 for the mineralized

Coarse Felsic Intrusion.

• Tonnes are metric.

• Conversions: Li2CO3:Li ratio = 5.32, LiOH.H2O:Li ratio =6.05

• Totals may not represent the sum of the parts due to rounding.

• The Mineral Resource estimate has been prepared by Mariea Kartick, P. Geo., and Derek Loveday, P. Geo. Of Stantec

Consulting Services Inc. in conformity with CIM “Estimation of Mineral Resource and Mineral Reserves Best Practices”

guidelines and are reported in accordance with the Canadian Securities Administrators NI 43-101. Mineral resources

are not mineral reserves and do not have demonstrated economic viability. The effective date of the Mineral Resource

Estimate is October 30, 2023. There is no certainty that any mineral resource will be converted into mineral reserve.

Figure 1 – Schematic Falchani Lithium Carbonate Processing Flowsheet highlighting SOP-Cs Stage

Qualified Person

Mr. Ted O’Connor, P.Geo., a Director of American Lithium, and a Qualified Person as defined by National Instrument 43-101

Standards of Disclosure for Mineral Projects , has reviewed and approved the scientific and technical information contained in

this news release.

About ANSTO Minerals

ANSTO Minerals is an international mining consultancy group located in Sydney, Australia, with an experienced team of 60+

engineers, metallurgists, chemists, and scientists who have been providing consulting services and process development

services to the mining and minerals processing industries for well over 35 years. ANSTO Minerals has world-leading expertise

in uranium ore processing, rare earth processing, zirconium/niobium/hafnium processing, base metals processing, lithium

processing (brines and hardrock), and radioactivity control and management.

About TECMMINE

TECMMINE E.I.R.L. is a Peruvian metallurgical consulting company based in Lima, Peru with mineral processing and

metallurgical testing laboratory facilities and experienced metallurgical personnel led by Eng. Jose Malqui.

About American Lithium

American Lithium is developing two of the world’s largest, advanced-stage lithium projects, along with the largest undeveloped

uranium project in Latin America. They include the TLC claystone lithium project in Nevada, the Falchani hard rock lithium

project and the Macusani uranium deposit, both in southern Peru. All three projects have been through robust preliminary

economic assessments, exhibit significant expansion potential and enjoy strong community support.

For more information, please contact the Company at  [email protected] or visit our website

at www.americanlithiumcorp.com.

Follow us on Facebook, Twitter and LinkedIn.

On behalf of the Board of Directors of American Lithium Corp.

“Alex Tsakumis”

Interim CEO

Tel: 604 428 6128

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

Cautionary Statement Regarding Forward Looking Information

This news release contains certain forward-looking information and forward-looking statements (collectively “forward-looking

statements”) within the meaning of applicable securities legislation. All statements, other than statements of historical fact,

are forward-looking statements. Forward-looking statements in this news release include, but are not limited to, statements

regarding the business plans, expectations and objectives of American Lithium. Forward-looking statements are frequently

identified by such words as "may", "will", "plan", "expect", "anticipate", "estimate", "intend", “indicate”, “scheduled”, “target”,

“goal”, “potential”, “subject”, “efforts”, “option” and similar words, or the negative connotations thereof, referring to future events

and results. Forward-looking statements are based on the current opinions and expectations of management and are not, and

cannot be, a guarantee of future results or events. Although American Lithium believes that the current opinions and

expectations reflected in such forward-looking statements are reasonable based on information available at the time, undue

reliance should not be placed on forward-looking statements since American Lithium can provide no assurance that such

opinions and expectations will prove to be correct. All forward-looking statements are inherently uncertain and subject to a

variety of assumptions, risks and uncertainties, including risks, uncertainties and assumptions related to: American Lithium’s

ability to achieve its stated goals;, which could have a material adverse impact on many aspects of American Lithium’s

businesses including but not limited to: the ability to access mineral properties for indeterminate amounts of time, the health

of the employees or consultants resulting in delays or diminished capacity, social or political instability in Peru which in turn

could impact American Lithium’s ability to maintain the continuity of its business operating requirements, may result in the

reduced availability or failures of various local administration and critical infrastructure, reduced demand for the American

Lithium’s potential products, availability of materials, global travel restrictions, and the availability of insurance and the

associated costs; the ongoing ability to work cooperatively with stakeholders, including but not limited to local communities

and all levels of government; the potential for delays in exploration or development activities; the interpretation of drill results,

the geology, grade and continuity of mineral deposits; the possibility that any future exploration, development or mining results

will not be consistent with our expectations; risks that permits will not be obtained as planned or delays in obtaining permits;

mining and development risks, including risks related to accidents, equipment breakdowns, labour disputes (including work

stoppages, strikes and loss of personnel) or other unanticipated difficulties with or interruptions in exploration and

development; risks related to commodity price and foreign exchange rate fluctuations; risks related to foreign operations; the

cyclical nature of the industry in which American Lithium operates; risks related to failure to obtain adequate financing on a

timely basis and on acceptable terms or delays in obtaining governmental approvals; risks related to environmental regulation

and liability; political and regulatory risks associated with mining and exploration; risks related to the uncertain global

economic environment and the effects upon the global market generally, any of which could continue to negatively affect

global financial markets, including the trading price of American Lithium’s shares and could negatively affect American

Lithium’s ability to raise capital and may also result in additional and unknown risks or liabilities to American Lithium. Other

risks and uncertainties related to prospects, properties and business strategy of American Lithium are identified in the “Risk

Factors” section of American Lithium’s Management’s Discussion and Analysis filed on July 30, 2025, and in recent securities

filings available at www.sedarplus.ca. Actual events or results may differ materially from those projected in the forward-looking

statements. American Lithium undertakes no obligation to update forward-looking statements except as required by

applicable securities laws. Investors should not place undue reliance on forward-looking statements.

A photo accompanying this announcement is available

at https://www.globenewswire.com/NewsRoom/AttachmentNg/49947731-23bc-4216-b68d-87514f7a5919