Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LI.V ·

American Lithium Reports Highest Grade Assay To-Date and Expands Discovery to Over 2.5 km Strike at TLC Project

Drill Results Mine Development & Operations

American Lithium Corp.

Suite 1507-1030 West Georgia Street, Vancouver, British Columbia, V6E 2Y3

americanlithiumcorp.com

TSXv

OTCQB

FRANKFURT

│ Li

│ LiACF

│ 5LA

American Lithium Reports Highest Grade Assay To-Date

and Expands Discovery to Over 2.5 km Strike at TLC Project

Vancouver, British Columbia - (April 16, 2019) – American Lithium Corp. (TSXV: LI) (OTCQB:

LIACF) (FSE: 5LA) (“American Lithium” or the “Company”) a leading acquisition, exploration and

development operator is extremely pleased to announce outstanding assay results from the phase one drill

program on it’s growing TLC lithium claystone project (“TLC”) located just outside the regional mining

centre of Tonopah, Nevada.

Today’s release reports on holes 5 through 7 as well as number 17 of the 18-hole drill program. The assay

results for drill hole TLC-1917 were prioritized in order to gain an early assessment of the northern claim

area as we commence permitting for our planned phase two drill program . Early indications suggest that

the northern grades and thicknesses exceed those identified within our initial discovery drill hole (TLC-

1901).

Highlights

 Highest grade interval reported now 1201 ppm Li over 44.2m in hole TLC-1917

 Grade and thickness consistent with results of TLC-1901 through TLC-1904

 Lithium grades continue to demonstrate consistent grades over wide down hole intervals

 Extends know mineralization to over 2.5km (1.5 miles) strike and still open to expansion

 10 additional drill hole assays are pending

 Permitting submitted for 10 additional core drill holes

Drill Hole ID Top (m) Bottom (m) Interval (m) Grade (Li ppm)

TLC-1905 3.0 24.3 21.3 739

and 44.2 61.0 16.8 868

TLC-1906 71.7 86.9 15.2 1098

TLC-1907 3.0 79.2 76.2 855

TLC-1917 44.2 115.8 71.6 1201

Table 1 - Drill Intersections at a Lithium Cutoff Grade of 600 ppm

An updated map indicating the locations of the 18-hole drill program is available at:

https://www.americanlithiumcorp.com/projects/tlc-nevada/

Mike Kobler, CEO of American Lithium notes, “These results extend the strike of high-grade lithium

claystone to over 2.5 km and a width of 0.75 km. Hole TLC -1917 is our highest-grade intersection with

1201 ppm Li over 44.2 m using a 600 ppm Li bottom cut off. With over half of the results of this 18-hole

drill program still pending we are demonstrating consistency in mineralisation and thickness of lithium

bearing intervals across the project.”

2

American Lithium Corp.

Suite 1507-1030 West Georgia Street, Vancouver, British Columbia, V6E 2Y3

americanlithiumcorp.com

Holes TLC-1905, 06, and 07 and 17 all have shallow depths to mineralization and significant continuous

mineralization.

Drill Hole ID Top (m) Bottom (m) Interval (m) Grade (Li ppm) Bottom Cut Off (Li ppm)

TLC-1905 3.0 65.5 62.5 629 300

or 3.0 24.3 21.3 739 600

and 44.2 61.0 16.8 868 600

or 50.3 56.4 6.1 1085 1000

TLC-1906 15.2 91.4 76.2 616 300

or 71.7 86.9 15.2 1098 600

or 71.7 85.4 13.7 1140 1000

TLC-1907 3.0 91.4 88.4 788 300

or 3.0 79.2 76.2 855 600

or 45.7 64.0 18.3 1118 1000

TLC-1917 3 127.4 120.4 881 300

or 44.2 115.8 71.6 1,201 600

or 48.8 102.1 53.3 1,366 1000

Table 2 - Drill Intersections at Various Lithium Cutoff Grades

Additional drill results anticipated within the next two weeks should aid in the determination of area-wide

grade and thickness assessment. Company management looks forward to providing further results as they

become available.

QA/QC Statement

Drilling was conducted by Harris Exploration Drilling and Associates Inc., of Fallon , Nevada utilizing a

“1500 Explorer” reverse circulation rig with a 5 ½ diameter hole with face centred bit. Sampling was

conducted using a riffle splitter or a cyclone splitter depending on the moist ure content of the sampled

material. Sampling was conducted over 5-foot (1.52m) intervals. Sample custody was maintained by the

company’s consultants throughout the sampling and logging process. The company has a rigorous QA/QC

program utilizing blanks, duplicates and a high and a low-grade lithium standard material. Duplicates and

standard material are inserted into the sample stream on a 5% and 5% basis, and blank material was inserted

into the sample stream. Samples were sent to American Assay Laboratories in Sparks Nevada for analysis

utilizing the ICP-MS analysis protocol. Selected check assays samples were sent to the Bureau Veritas in

Reno/Vancouver for analysis by ICP-MS.

About the TLC Discovery

The TLC lithium claystone discovery is a n exploration and development project located 12km northwest

of Tonopah, Nevada and easily accessible by paved highway. The fieldwork to-date indicates a near surface,

relatively flat-lying, free digging lithium claystone region that offers the potential of hosting a wide area of

high-grade lithium mineralization. With drilling ongoing, the company expects to deliver a maiden resource

and early stage economic study in 2019. Just south of the Crescent Dunes Solar Energ y Plant, the project

is favorably located for future production given the immediate access to some of the cheapest electricity in

Nevada.

3

American Lithium Corp.

Suite 1507-1030 West Georgia Street, Vancouver, British Columbia, V6E 2Y3

americanlithiumcorp.com

About American Lithium Corp. (TSX.V: Li) (OTCQB: LIACF) (FSE: 5LA)

American Lithium is actively engaged in the acquisition, exploration and development of lithium deposits

within mining-friendly jurisdictions throughout the Americas. The Company is currently exploring and

developing its recent TLC discovery and FLV Project located in the highly prospective Esmeralda Lithium

District in Nevada. These projects, within 48 km (30 miles) of each other, are close to infrastructure, 3.5

hours south of the Tesla Gigafactory, and similar mineralization characteristics as Albemarle’s Silver Peak

Lithium Mine, and the advancin g deposits and resources including Ioneer Inc.’s (formerly Global

Geosciences) Rhyolite Ridge and Cypress Development Corp’s Clayton Valley Project.

The technical information within this news release has been reviewed and approved by Michael Collins,

P.Geo., a consultant to the Company and a qualified person under National Instrument 43-101.

American Lithium is a Venture 50 company. For more information, please contact the Company

at [email protected] or visit our website at www.americanlithiumcorp.com. Follow us

on Facebook, Twitter and LinkedIn.

On behalf of the Board,

American Lithium Corp.

Michael Kobler,

Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

Statements in this release that are forward -looking information are subject to various risks and uncertainties

concerning the specific factors disclosed here. Information provided in this release is necessarily summarized and may

not contain all available material information. All such forward -looking information and s tatements are based on

certain assumptions and analyses made by American Lithium management in light of their experience and perception

of historical trends, current conditions and expected future developments, as well as other factors management believes

are appropriate in the circumstances. These statements, however, are subject to a variety of risks and uncertainties and

other factors that could cause actual events or results to differ materially from those projected in the forward -looking

information or statements. Important factors that could cause actual results to differ from these forward -looking

statements include those described under the heading “Risks Factors” in American Lithium’s most recently filed

MD&A. The Company does not intend, and expres sly disclaims any obligation to, update or revise the forward -

looking information contained in this news release, except as required by law. Readers are cautioned not to place

undue reliance on forward-looking information or statements.