Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LI.V ·

American Lithium Intersects Highest Grade Lithium and Cesium Samples Encountered to Date at Falchani - Up to 5,645 ppm Lithium and up to 12,610 ppm Cesium

Drill Results

American Lithium Intersects Highest Grade Lithium and Cesium Samples Encountered

to Date at Falchani - Up to 5,645 ppm Lithium and up to 12,610 ppm Cesium

VANCOUVER, BRITISH COLUMBIA, July 12, 2023 – American Lithium Corp. (“American Lithium” or the

“Company”) (TSX-V:LI | NASDAQ:AMLI | Frankfurt:5LA1) is pleased to provide details of assay results from

three diamond drill holes recently drilled at the Falchani Lithium project in Puno, southeastern Peru

(“Falchani”). These 3 holes were drilled under the ten-hole Environmental Impact Assessment (“EIA”)

hydrology drilling program launched at Falchani last fall as part of the EIA hydrology study designed by

EDASI SAC and SRK Peru with field work overseen by EDASI. This program has successfully demonstrated

that there are no water table issues within proposed development areas across Falchani and the program

has also enabled the drilling and analysis of core down to a depth of 120 metres (“m”). Once full results

from this program are complete all data and assays will be incorporated into an updated resource report

on Falchani to be prepared by Stantec Consulting, Inc (“Stantec”).

Core logging and assay results from these three diamond holes intersected intervals of typical Falchani

volcanic tuff as well as large sections of breccias with highlights including Lithium up to 5,645 ppm and

Cesium up to 1.22%, the highest grades of both metals encountered to date from 1 m drill core interval

samples at Falchani. These holes were drilled in key areas both within and outside the current Falchani

resource footprint and will add additional information to the planned mineral resource estimate update

with a focus on expanding the overall resource and reclassifying the existing resource. Full details of the

results from these three holes are set out below:

EIA Drill Program and Initial Results

Link to: Figure 1 – Falchani EIA Hydrology and Previous Drill Hole Location Map (also see below)

• EIA diamond drill hole Pz04-TV (vertical) intersected lithium mineralization over the entire vertical

drill hole; 0-120 m averaged 2,186 ppm Lithium (Li); 841 ppm Cesium (Cs); 1,215 ppm Rubidium (Rb);

and 2.62% Potassium (K) - (see Table 1 – Drill Hole Pz04-TV results, below):

▪ Several substantial sub-intervals of +3,000 ppm Li intersected;

▪ Maximum Li of 5,645 ppm Li over 1 m at 54 m downhole; and

▪ This drill hole is the westernmost drill hole reported at Falchani and extends the drilled

mineralization approximately 250 m further west. Mineralization remains open at depth (>120 m).

• EIA diamond drill hole Pz03-TV (vertical) intersected the strongest Cesium mineralization to date with

associated moderate lithium mineralization over the upper 63 m downhole averaging 1,428 ppm Li;

4,770 ppm Cs; 1,188 ppm Rb; and 2.67% K (see Table 2 – Drill Hole Pz03-TV results, below):

▪ The upper interval (0-23 m) is richer in Li with the lower interval (23-63 m) much richer in Cs,

including the highest 1 m Cs interval sample encountered at Falchani of 12,160 ppm Cs (1.2% Cs);

▪ Cs mineralization is associated with more intense brecciation and hydrothermal overprint observed

in this hole, drilled from within the natural valley separating the east and western parts of the

Falchani resource. This hole establishes the deposit thickness/bottom within the valley.

• EIA diamond drill hole Pz06-TV (vertical) intersected typical Falchani tuff over the entire 86 m drilled

and analyzed to date averaging 2,739 ppm Li; 338 ppm Cs; 1,292 ppm Rb; and 2.87% K (see Table 3 –

Drill Hole Pz06-TV results, below); drilling at this location continues in Li mineralization.

• Ground water has yet to be encountered in any holes within the 120 m reporting drill depth, so EDASI

and the Company is requesting permission from ANA, the National Water Authority, to drill deeper:

▪ 10 diamond drill holes were approved for EIA drilling , including installation of downhole

piezometers to monitor water table and local groundwater parameters where water is

encountered;

▪ Every 5m EDASI collects drill hole wall-rock measurements of moisture content, water, etc. resulting

in very slow drill advancement, but essential data and information for feasibility study;

▪ Drill core chemical analysis is required under the EIA, and reporting mineralization is allowed; and

▪ EIA Program is close to completion and additional results will be reported when available.

Simon Clarke, CEO of American Lithium states , “We are excited to have intersected thick, high grade

lithium mineralization west of the current Falchani resource footprint, which should allow for resource

expansion. The strong cesium and lithium mineralization encountered in the central valley bisecting

Falchani is also very interesting from a strategic perspective with higher than previously recorded cesium

grades. The entire EIA program will provide valuable additional data to the existing drill results from

Falchani.

We are also very pleased to be back working constructively and successfully in Peru. We received the first

new permits for the new Quelcaya targets several weeks ago and have also launched a new drill program

on some of our best targets across the Macusani Plateau . We anticipate receiving our next drill permits

for additional infill and expansion drilling at both the Falchani Deposit and the Macusani Uranium Project

shortly. Expanding and reclassifying the resource is a key piece of the updated PEA we are targeting for

the end of Q3.”

Figure 1 – Falchani EIA Hydrology and Previous Drill Hole Location Map

Hole Pz04-TV was drilled approximately 250 m west of Platform 36 (Falchani West – 2020 drilling), the

westernmost holes from the 2020 resource drill program. Thick Li, Cs and Rb mineralization was

intersected in rhyolite tuff, structural -hydrothermal breccia and subvolcanic rhyolitic intrusive rocks

directly at surface to 120 m downhole depth. This expands the Falchani mineralization to the west, where

the deposit remains open. The drill hole ended in mineralization and remains open at depth at this

location.

Hole Pz03-TV was drilled in the northern portion of the intervening erosional valley that essentially bisects

the Falchani deposit into eastern and western sides . It was collared 300 m southwest of Platform 25

(Falchani East – 2020 drilling) and 450 m northeast of Platform 14 (Falchani West – 2020 drilling). This drill

hole intersected 63 m of Li, Cs and Rb mineralization in intensely brecciated rhyolite tuff lithologies,

including the strongest Cs mineralization to date on the project (1 m interval >1.2% Cs at 34 m downhole).

This establishes the base of mineralization definitively at this location where previously, resource

modelers interpreted it as much thinner, due to lack of previous drilling. The remainder of the drill hole

from 63 m to 115 m intersected older porphyritic rhyolite flow units with much lower Li, Cs and Rb

contents.

Hole Pz06-TV was drilled approximately 100 m east of Platform 13 (Falchani West – 2020 drilling) towards

the intervening valley and has intersected typical Falchani tuff mineralization over the entire drilled and

reported thickness of 86 m. This drill hole encountered adverse ground conditions and had to be

abandoned while still in mineralization. The hole was subsequently restarted from surface and drilling

continues in mineralized tuff units.

Table 1 – Drill Hole Pz04-TV results

Pz04-TV – 120.0 m

total depth - Vertical

From (m) To (m) Thickness

(m)

Li (ppm) Cs (ppm) Rb (ppm) K (%)

0.0 120.0 120.0 2,186 841 1,215 2.62

including 1.5 11.0 9.5 3,090 503 1,506 3.03

including 50.0 90.0 40.0 3,001 746 1,156 2.50

including 50.0 68.0 18.0 4,108 610 1,461 2.23

Maximum Li interval 54.0 55.0 1.0 5,645

Maximum Cs interval 19.0 20.0 1.0 1,400

Maximum Rb interval 6.5 8.0 1.5 1,564

Table 2 – Drill Hole Pz03-TV results

Pz03-TV – 115.0 m

total depth - Vertical

From (m) To (m) Thickness

(m)

Li (ppm) Cs (ppm) Rb (ppm) K (%)

0.0 63.0 63.0 1,428 4,770 1,082 2.55

including 0.0 23.0 23.0 2,222 594 1,401 3.94

including 23.0 63.0 40.0 972 7,171 899 1.93

Maximum Li interval 20.0 21.0 1.0 3,543

Maximum Cs interval 34.0 35.0 1.0 12,160

Maximum Rb interval 21.0 22.0 1.0 1,830

Table 3 – Drill Hole Pz06-TV results

Pz06-TV – 86.0 m total

depth – Vertical;

drilling continues

From (m) To (m) Thickness

(m)

Li (ppm) Cs (ppm) Rb (ppm) K (%)

0.0 86.0 86.0 2,739 338 1,292 2.87

Maximum Li interval 85.0 86.0 1.0 3,381

Maximum Cs interval 80.0 81.0 1.0 699

Maximum Rb interval 83.0 84.0 1.0 1,458

Quality Assurance, Quality Control and Data Verification

Diamond drilling is being conducted using Company-owned drill rigs with local contract personnel. Drill

core samples are cut longitudinally with a diamond saw with one -half of the core placed in sealed bags

and shipped to Certimin’s sample analytical laboratory in Lima for sample preparation , processing and

ICP-MS/OES multi-element analysis. Certimin is an ISO 9000 certified assay laboratory. The Company’s

Qualified Person for the drill program, Mr. Ted O’Connor, has verified the data disclosed, including drill

core, sampling and analytical d ata in the field and laboratory. The program is designed to include a

comprehensive analytical quality assurance and control routine comprising the systematic use of

Company inserted standards, blanks and field duplicate samples, internal laboratory standa rds and has

also included check analyses at other accredited laboratories. Downhole thicknesses for vertical drill holes

are considered accurate true thickness intersections.

Qualified Person

Mr. Ted O’Connor, P.Geo., Executive Vice President of American Lithium, and a Qualified Person as

defined by National Instrument 43 -101 Standards of Disclosure for Mineral Projects , has reviewed and

approved the scientific and technical information contained in this news release.

About American Lithium

American Lithium is actively engaged in the development of large -scale lithium projects within mining -

friendly jurisdictions throughout the Americas. The Company is currently focused on the continued

development of its strategically located TLC Lithium Claystone Project in the richly mineralized Esmeralda

lithium district in Nevada, as well as continuing to advance its Falchani Hard -rock Lithium Project and

Macusani Uranium Project in southeastern Peru. All three projects, TLC, Falchani and Macusani have been

through robust preliminary economic assessments, exhibit strong significant expansion potential and

enjoy strong community support. Pre -feasibility work is well advanced at Falchani and has commenced

at TLC.

For more information, please contact the Company at [email protected] or visit our website

at www.americanlithiumcorp.com for project update videos and related background information.

Follow us on Facebook, Twitter and LinkedIn.

On behalf of the Board of Directors of American Lithium Corp.

“Simon Clarke”

CEO & Director

Tel: 604 428 6128

For Media Inquiries:

Nancy Thompson

Vorticom, Inc.

212-532-2208

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press

release.

Cautionary Statement Regarding Forward Looking Information

This news release contains certain forward-looking information and forward-looking statements (collectively

“forward-looking statements”) within the meaning of applicable securities legislation. All statements, other than

statements of historical fact, are forward-looking statements. Forward-looking statements in this news release

include, but are not limited to, statements regarding the ability to appeal the judicial ruling, the anticipated

completion of pre-feasibility work, and any other statements regarding the business plans, expectations and

objectives of American Lithium. Forward-looking statements are frequently identified by such words as "may", "will",

"plan", "expect", "anticipate", "estimate", "intend", “indicate”, “scheduled”, “target”, “goal”, “potential”, “subject”,

“efforts”, “option” and similar words, or the negative connotations thereof, referring to future events and results.

Forward-looking statements are based on the current opinions and expectations of management and are not, and

cannot be, a guarantee of future results or events. Although American Lithium believes that the current opinions and

expectations reflected in such forward-looking statements are reasonable based on information available at the time,

undue reliance should not be placed on forward-looking statements since American Lithium can provide no assurance

that such opinions and expectations will prove to be correct. All forward-looking statements are inherently uncertain

and subject to a variety of assumptions, risks and uncertainties, including risks, uncertainties and assumptions

related to: American Lithium’s ability to achieve its stated goals, which could have a material adverse impact

on many aspects of American Lithium’s businesses including but not limited to: the ability to access mineral

properties for indeterminate amounts of time, the health of the employees or consultants resulting in delays or

diminished capacity, social or political instability in Peru which in turn could impact American Lithium’s ability to

maintain the continuity of its business operating requirements, may result in the reduced availability or

failures of various local administration and critical infrastructure, reduced demand for the American Lithium’s

potential products, availability of materials, global travel restrictions, and the availability of insurance and the

associated costs; the judicial appeal process in Peru, and any and all future remedies pursued by American Lithium

and its subsidiary Macusani to resolve the title for 32 of its concessions; the ongoing ability to work

cooperatively with stakeholders, including but not limited to local communities and all levels of government; the

potential for delays in exploration or development activities; the interpretation of drill results, the geology, grade

and continuity of mineral deposits; the possibility that any future exploration, development or mining results will not

be consistent with our expectations; risks that permits will not be obtained as planned or delays in obtaining

permits; mining and development risks, including risks related to accidents, equipment breakdowns, labour

disputes (including work stoppages, strikes and loss of personnel) or other unanticipated difficulties with or

interruptions in exploration and development; risks related to commodity price and foreign exchange rate

fluctuations; risks related to foreign operations; the cyclical nature of the industry in which American Lithium

operates; risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or

delays in obtaining governmental approvals; risks related to environmental regulation and liability; political and

regulatory risks associated with mining and exploration; risks related to the uncertain global economic environment

and the effects upon the global market generally, any of which could continue to negatively

affect global financial markets, including the trading price of American Lithium’s shares and could negatively affect

American Lithium’s ability to raise capital and may also result in additional and unknown risks or liabilities to

American Lithium. Other risks and uncertainties related to prospects, properties and business strategy of American

Lithium are identified in the “Risk Factors” section of American Lithium’s Management’s Discussion and Analysis filed

on May 29, 2023, and in recent securities filings available at www.sedar.com. Actual events or results may differ

materially from those projected in the forward -looking statements. American Lithium undertakes no obligation to

update forward-looking statements except as required by applicable securities laws. Investors should not place undue

reliance on forward-looking statements.

Cautionary Note Regarding Macusani Concessions

Thirty-two of the 169 concessions held by American Lithium’s subsidiar y Macusani, are currently subject to

Administrative and Judicial processes (together, the “Processes”) in Peru to overturn resolutions issued by INGEMMET

and the Mining Council of MINEM in February 2019 and July 2019, respectively, which declared Macusani’ s title to

32 of the concessions invalid due to late receipt of the annual validity payments. In November 2019, Macusani applied

for injunctive relief on 32 concessions in a Court in Lima, Peru and was successful in obtaining such an injunction on

17 of th e concessions including three of the four concessions included in the Macusani Uranium Project PEA. The

grant of the Precautionary Measure (Medida Cautelar) has restored the title, rights and validity of those 17

concessions to Macusani until a final decis ion is obtained at the last stage of the judicial process. A Precautionary

Measure application was made at the same time for the remaining 15 concessions and was ultimately granted by a

Court in Lima, Peru on March 2, 2021 which has also restored the title , rights and validity of those 15 remaining

concessions to Macusani, with the result being that all 32 concessions are now protected by Precautionary Measure

(Medida Cautelar) until a final decision on this matter is obtained at the last stage of the judic ial process. The

favourable judge’s ruling confirming title to all 32 concessions from November 3, 2021 represents the final stage of

the current judicial process. However, this ruling has recently been appealed by MINEM and INGEMMET. American

Lithium has no assurance that the outcome of these appeals will be in the Company’s favour.