Largo Reports Q4 and Full Year 2025 Operational and Sales Results; Provides 2026 Outlook and Vanadium Guidance; Reports Positive Precious Metals Results on Recent Copper Flotation Tests.

Metallurgy & Processing

Largo Reports Q4 and Full Year 2025

Operational and Sales Results; Provides 2026

Outlook and Vanadium Guidance; Reports

Positive Precious Metals Results on Recent

Copper Flotation Tests.

All amounts expressed are in U.S. dollars, denoted by "$".

Q4 and FY 2025 Highlights

• Q4 2025 V2O5 equivalent production totaled 2,961 tonnes (6.5 million lbs1) vs. 1,775

tonnes in Q4 2024. Note that 4Q24 production was impacted by the annual kiln

shutdown and not in 4Q25. The recently improved operational stability is allowing Largo

to postpone its annual kiln shutdown to mid-2026

• Annual V2O5 production of 9,150 tonnes (20.17 million lbs1) in 2025 vs. 9,264 tonnes in

2024 and within the Company's 2025 annual production guidance range of 9,000 - 11,000

tonnes

• Q4 2025 global V2O5 recovery was maintained at 77.9% flat versus Q4 2024. Annual

global V2O5 recovery improved to 80.1% in 2025 vs. 76.4% in 2024

• Q4 2025 sales totaled 2,396 tonnes of V2O5 equivalent in Q4 2025, down 21% compared

to the 3,033 tonnes sold Q4 2024 due to the impact of the US tariffs on Brazilian imports

of High Purity vanadium.

• Annual V2O5 equivalent sales of 8,686 tonnes in 2025 vs. 9,600 tonnes in 2024, within the

Company's annual 2025 sales guidance of 7,500 - 9,500 tonnes

• Q4 2025 ilmenite concentrate production totaled 7,328 tonnes, with annual production

of 30,282 tonnes in 2025 which was within company guidance. Sales of ilmenite

concentrate totaled 12,930 tonnes in Q4 2025 and 33,959 tonnes in 2025.

Copper and precious metal recent metallurgical test results

• Assay results from metallurgical test work to assess the recoverability of copper using

conventional flotation process yielded positive results indicating copper concentrates

with gold, platinum and palladium values as well as lower values of cobalt and nickel.

• Largo conducted internally 45 conventional copper flotation tests in recent months and

a composite of the best 12 flotation test results analysed externally in an accredited

laboratory (SGS-Geosol) yielded a copper concentrate containing 18.4% Cu, 9.1 grams

per ton ("gpt") Au, 6.6 gpt Pt, 5.4 gpt Pd, 66 gpt Ag, 0.52% Co, 0.55% Ni.

• Larger scale test using part of our ilmenite flotation circuits lead us to suspend our

ilmenite production and sales guidance for 2026 as we evaluate the optimum use of our

ilmenite flotation infrastructure to accommodate a potential use of part of it for copper/

PGM concentrate production

Vanadium Market Update2

• The average benchmark price per lb of V2O5 in Europe was $5.85 in Q4 2025, a 9.55%

increase from the average of $5.34 seen in Q4 2024; the average benchmark price at

December 31, 2025, was $5.89, a 9.68% increase from the average of $5.37 at December

31, 2024

• The average benchmark price per kg of ferrovanadium in the United States was $23.98

in Q4 2025, a -8.54% decrease from the average of $26.22 seen in Q4 2024; the average

benchmark price at December 31, 2025 was $24.15, a -7,45% decrease from the average

of $25.95 at December 31, 2024.

• The average benchmark price per kg of ferrovanadium in Europe was $23.85 in Q4 2025,

a -8.62% decrease from the average of $26.10 seen in Q4 2024; the average benchmark

price at December 31, 2025 was $23.83, a -6.12% decrease from the average of $25.38 at

December 31, 2024

• Vanadium spot demand remained soft in Q4 2025, primarily due to weaker demand in

the Chinese and European steel industries, while the U.S. steel market remained stable;

China's energy storage sector is expected to drive additional consumption in upcoming

quarters

• In 2026, U.S. steel demand is expected to remain stable, while European and Asian steel

markets face continued softness; China's energy storage market will continue to be a

key driver of vanadium consumption as the sector continues to accelerate.

Toronto, Ontario--(Newsfile Corp. - February 5, 2026) - Largo Inc. (TSX: LGO) (NASDAQ:

LGO) ("Largo" or the "Company") today announces annual production of 9,150 tonnes (20.17 million

lbs¹) of vanadium pentoxide ("V₂O₅") equivalent from its Maracás Menchen Mine and sales of 8,686

tonnes of V₂O₅ equivalent in 2025. Throughout the year, the Company implemented a robust and

efficient action plan across its open pit and industrial plant, enabling operations to achieve the

expected production level for 2025.

Daniel Tellechea, Co-CEO of Largo, stated: "In 2025, our team remained focused on implementing

operational efficiencies, cost reduction, and later in the year dealing with the challenges of new US

tariffs for our High Purity vanadium while maintaining Largo's position as a reliable, western vanadium

supplier. While production in 2025 was impacted by lower ore grades in the first five months of the

year derived from our open pit mine sequencing plans and maintenance, the stronger second half of

the year made up for the weak production of 1H25 and achieved our production guidance targets. We

continue to take decisive steps to continue to reduce costs and enhance operational efficiencies at

the mine with initiatives designed to support future operational stability at the Maracás Menchen

Mine."

J. Alberto Arias, Co-CEO continued: "Our recent announcement of metallurgical flotation studies and

analysis of previous geologic data for copper, platinum and palladium and the potential use of part of

the ilmenite flotation plant infrastructure for copper/PGM production led us to suspend ilmenite

production guidance for 2026. The successful copper flotation laboratory is now being followed by

pilot tests at a commercial level using part of our ilmenite flotation infrastructure. Despite our

commitment on ilmenite production, we believe the copper-PGM opportunity is important enough to

re-evaluate the economics of potentially producing different combinations of copper PGM and

ilmenite in our existing infrastructure."

Maracás Menchen Mine Operational and Sales Results

Q4 2025 Q4 2024 2025 2024

Total Mined - Dry Basis (tonnes) 2,867,587 3,673,416 14,928,193 13,949,665

Total Ore Mined (tonnes) 665,953 476,742 2,209,355 2,249,759

Ore Grade Mined - Effective Grade (%)3 0.53 0.49 0.50 0.63

Concentrate Produced (tonnes) 129,565 75,051 385,271 389,520

Grade of Concentrate (%) 2.82 2.73 2.83 2.90

Global Recovery (%)4 77.9 77.9 80.1 76.4

V2O5 produced (Flake + Powder) (tonnes) 2,961 1,775 9,150 9,264

High purity V2O5 equivalent produced (%) 0% 26% 23% 23%

V2O5 produced (equivalent pounds) 1 6,527,888 3,913,200 20,171,651 20,423,599

Total V2O5 equivalent sold (tonnes) 2,396 3,033 8,686 9,600

Produced V2O5 equivalent sold (tonnes) 2,396 3,025 8,686 9,184

Purchased V2O5 equivalent sold (tonnes) 0 8 0 416

Ilmenite concentrate produced (tonnes) 7,328 10,292 30,282 44,863

Ilmenite concentrate sold (tonnes) 12,930 10,570 33,959 42,916

Q4 2025 and Other Updates

• V₂O₅ equivalent production in Q4 2025 was 2,775 tonnes, representing a 66.8% increase from

Q4 2024 (1,775 tonnes) and a 12.3% increase from Q3 2025 (2,636 tonnes). Enhanced

operational stability, together with higher ore availability, contributed to these results.

• Total ore mined in Q4 2025 was 665,953 tonnes, in line with the 476,742 tonnes mined in Q4

2024. The effective ore grade3 was 0.53% V₂O₅ in Q4 2025, higher than the 0.52% in Q3 2025

and 0.49% in Q4 2024. Global recovery4 in Q4 2025 was 77.9%, unchanged from Q4 2024.

Yearly global recovery increased to 80.1% in 2025 from 76.4% in 2024.

• Approximately 14% of the 2025 V2O5 production was generated through circular production

practices, including the reprocessing of non-magnetic tailings storage facilities and heap leach

materials, reinforcing operational efficiency and resource optimization.

• High-purity vanadium products represented 0% of total production in Q4 2025 vs. 26% in Q4

2024, as production was negatively impacted by U.S. tariffs.

• Ilmenite concentrate production in Q4 2025 was 7,328 tonnes. The Company continues to

refine its processes to improve efficiency and throughput. The recently installed scavenger

circuit is demonstrating improved metallurgical recoveries by reducing losses of valuable

minerals, resulting in increased productivity and lower operating costs.

2026 Guidance

Tables summarizing the Company's 2026 production, sales and cost guidance are provided below.

The Company expects higher V₂O₅-equivalent production in Q1 2026 than in the same period in

2025, driven by increased ore availability.

• V₂O₅ equivalent production of 5,391 tonnes (11.9 million lbs) in H1 2026 compared to 3,553

tonnes in H1 2025. Production is expected to increase by 51.7%, driven by higher ore

availability and magnetics content, alongside operational enhancements including a 5%

increase in rotary kiln throughput capacity and a 22% increase in milling feed capacity

following the stabilization of parallel milling circuits.

• Annual ore availability is expected to reach 2.5 million tonnes in 2026 vs. 2.2 million tonnes in

2025, a 14% increase of ore mass.

Largo is focused on advancing its productivity improvement initiatives, including a greater focus on

mining efficiency to enhance mine fleet availability, strengthen contractor oversight, improve

maintenance programs, and optimize drilling and blasting techniques. These actions are designed to

stabilize and enhance throughput in 2026 and beyond.

V2O5 Equivalent Production and Sales Guidance

Q1 Q2 Q3 Q4 2026 Low High Low High Low High Low High Low High

Production (tonnes) 2,400 2,700 2,500 3,000 2,600 3,100 3,000 3,200 10,500 12,000

Sales (tonnes)i 1,500 2,000 2,000 2,500 2,000 2,500 2,000 2,500 7,500 9,500

i. The annual 2026 sales guidance does not include purchased material, or any sold material related to the Company's previously

announced vanadium inventory supply agreement.

Update on Timing of Initial Payment Under Iron Ore Calcine Sale Agreement

The Company would like to provide an update on the definitive agreement announced on January 20,

2026, for the sale of iron ore calcine, a byproduct of its vanadium operations. Following the signing of

the agreement, the initial payment originally scheduled for January 30, 2026, was postponed until

February 9, 2026. The Company will provide further updates as appropriate.

Disclaimer

It is important to emphasize that the studies completed to date are based on diamond drill core

samples collected from drilling programs conducted by independent third-party contractors and on

chemical analyses performed by certified external laboratories. Preliminary geometallurgical results

were obtained internally and are considered indicative in nature, reflecting improvements in the

understanding of flotation processes currently in place.

This document does not disclose Mineral Resources or Mineral Reserves for copper or platinum

group elements. The project includes vanadium and titanium mineralization for which scientific and

technical information is set out in the National Instrument 43-101 ("NI 43-101") technical report titled:

"An Updated Life of Mine Plan (LOMP) for Gulçari A (Campbell Pit) and Pre-Feasibility Study for

Gulçari A Norte (GAN), Novo Amparo (NAO), Novo Amparo Norte (NAN) and São José (SJO)

Deposits", prepared by GE21 Consultoria Mineral Ltda with an effective date of January 30, 2024 filed

in Canada on SEDAR+ and in the United States with the U.S. Securities and Exchange Commission

on EDGAR under the Company's profile.

Largo is initiating a new phase of studies aimed at evaluating additional commodities that may

support a future update of Mineral Resources and Mineral Reserves in an independent technical

report prepared in compliance with NI 43-101.

Review of Technical Information

Mr. Emerson Ricardo Re., MSc, MBA, MAusIMM (CP) (No. 305892), Registered Member (No. 0138)

(Chilean Mining Commission) is the geology advisor and responsible for the geological management

of the Maracás Menchen Mine. Mr. Re is a Qualified Person as defined under NI 43-101 and has

reviewed and approved the scientific and technical information related to geology, drilling, sampling,

and analytical results in this press release. Information related to metallurgical test work, process

considerations and potential recoveries is based on the Company's internal assessments and is

presented as forward-looking information.

About Largo

Largo is a globally recognized supplier of high-quality vanadium and ilmenite products, sourced from

its world-class Maracás Menchen Mine in Brazil. As one of the world's largest primary vanadium

producers, Largo produces critical materials that empower global industries, including steel,

aerospace, defense, chemical, and energy storage sectors. The Company is committed to

operational excellence and sustainability, leveraging its vertical integration to ensure reliable supply

and quality for its customers.

Largo is also strategically invested in the clean energy storage sector through its 50% ownership of

Storion Energy, a joint venture with Stryten Energy focused on scalable domestic electrolyte

production for utility-scale vanadium flow battery long-duration energy storage solutions in the U.S.

The Company also holds a 100% interest in the Northern Dancer Tungsten-Molybdenum property

located in the Yukon Territory, Canada and 100% interest in the Currais Novos Tungsten Tailing

Project near Natal, Brazil. Preliminary economic assessments were completed for each asset in

2011.

Largo's common shares trade on the Nasdaq Stock Market and on the Toronto Stock Exchange

under the symbol "LGO". For more information on the Company, please visit www.largoinc.com.

###

For further information, please contact:

Investor Relations

Vera Abdo

Investor Relations Consultant

+1.640.223.6956

[email protected]

Cautionary Statement Regarding Forward-looking Information:

This press release contains "forward-looking information" and "forward-looking statements" within the

meaning of applicable securities legislation. Forward-looking information in this press release may

include, but is not limited to, the ability of the Company to continue as a going concern, the ability of

the Company to keep the Maracás Menchen Mine operating, the timing and amount of estimated

future production and sales, the future price of commodities, the cost of future activities and

operations, including, without limitation, the timing of ilmenite production; China's energy storage

sector driving additional vanadium consumption in upcoming quarters; U.S., European and Asian

steel demand and markets in 2026; the Company's ability to reduce costs and enhance operational

efficiencies; the potential that the Company may produce different combinations of copper PGM and

ilmenite in its existing infrastructure; the Company's 2026 expectations for production, operational

enhancements, annual ore availability and sales; the extent of capital and operating expenditures, the

ability of the Company to make improvements on its current short-term mine plan, and the Company's

ability to meet its set targets for the year.

The following are some of the assumptions upon which forward-looking information is based: that

general business and economic conditions will not change in a material adverse manner; demand for,

and stable or improving price of V2O5 and other vanadium products, ilmenite and titanium dioxide

pigment; receipt of regulatory and governmental approvals, permits and renewals in a timely manner;

that the Company will not experience any material accident, labour dispute or failure of plant or

equipment or other material disruption in the Company's operations at the Maracás Menchen Mine;

the availability of financing for operations and development; the Company's ability to fund operations

and meet its financial obligations as they come due; the availability of funding for future capital

expenditures; the ability to replace current funding on terms satisfactory to the Company; the ability to

mitigate the impact of heavy rainfall; the reliability of production, including, without limitation, access

to massive ore, the Company's ability to procure equipment, services and operating supplies in

sufficient quantities and on a timely basis; that the estimates of the resources and reserves at the

Maracás Menchen Mine are within reasonable bounds of accuracy (including with respect to size,

grade and recovery and the operational and price assumptions on which such estimates are based);

the accuracy of the Company's mine plan at the Maracás Menchen Mine; the ability to obtain funding

through government grants and awards for the Green Energy sector; that the Company's current

plans for vanadium, ilmenite and TiO2 products can be achieved; the Company's "two-pillar" business

strategy will be successful; the Company's ability to protect and develop its technology; the

Company's ability to maintain its IP; the competitiveness of the Company's product in an evolving

market; that the Company will enter into agreements for the sales of vanadium, ilmenite and TiO2

products on favourable terms and for the sale of substantially all of its annual production capacity; the

Company's ability to attract and retain skilled personnel and directors; the ability of management to

execute strategic goals; uncertainty regarding future sales volumes and customer demand; and

changes in global trade policies, including the imposition of tariffs or other trade restrictions by the

United States or other jurisdictions;

Forward-looking statements can be identified by the use of forward-looking terminology such as

"plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts",

"intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases

or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken",

"occur" or "be achieved", although not all forward-looking statements include those words or phrases.

In addition, any statements that refer to expectations, intentions, projections, guidance, potential or

other characterizations of future events or circumstances contain forward-looking information.

Forward-looking statements are not historical facts nor assurances of future performance but instead

represent management's expectations, estimates and projections regarding future events or

circumstances. Forward-looking statements are based on our opinions, estimates and assumptions

that we considered appropriate and reasonable as of the date such information is stated, subject to

known and unknown risks, uncertainties and other factors that may cause the actual results, level of

activity, performance or achievements of Largo to be materially different from those expressed or

implied by such forward-looking statements, including but not limited to those risks described in the

annual information form of Largo and in its public documents filed on www.sedarplus.ca and available

on www.sec.gov from time to time. Forward-looking statements are based on the opinions and

estimates of management as of the date such statements are made. Although management of Largo

has attempted to identify important factors that could cause actual results to differ materially from

those contained in forward-looking statements, there may be other factors that cause results not to be

as anticipated, estimated or intended. There can be no assurance that such statements will prove to

be accurate, as actual results and future events could differ materially from those anticipated in such

statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Largo does not undertake to update any forward-looking statements, except in accordance with

applicable securities laws. Readers should also review the risks and uncertainties sections of Largo's

annual and interim MD&A which also apply.

Trademarks are owned by Largo Inc.

Future Oriented Financial Information:

Any financial outlook or future oriented financial information contained in this press release, as such

term is defined by applicable securities laws, has been approved by management of Largo as of the

date hereof and is provided for the purpose of providing information about management's current

expectations and plans relating to the Company's 2026 guidance. Readers are cautioned that any

such future oriented financial information contained herein should not be used for purposes other

than those for which it is disclosed herein. The Company and its management believe that the

prospective financial information as to the Company's anticipated 2026 guidance has been prepared

on a reasonable basis, reflecting management's best estimates and judgments. However, because

this information is highly subjective, it should not be relied on as necessarily indicative of future

results.

1 Conversion of tonnes to pounds, 1 tonne = 2,204.62 pounds or lbs.

2 Fastmarkets Metal Bulletin.

3 Effective grade represents the percentage of magnetic material mined multiplied by the percentage of V2O5 in the magnetic concentrate.

4 Global recovery is the product of crushing recovery, milling recovery, kiln recovery, leaching recovery and chemical plant recovery.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/282945