News Release 25-16 August 19, 2025

Liberty Gold Reports Strong Phase 5A Column Leach Metallurgical Results

at Black Pine, Confirming Consistent Oxide Gold Recoveries Across Newly

Tested Zones

80.6% weighted average gold extraction from 24 column leach tests

VANCOUVER, B.C. – Liberty Gold Corp. (TSX: LGD; OTCQX: LGDTF) (“Liberty Gold” or the

“Company”) is pleased to report results from its Phase 5A metallurgical program at the Company’s

Black Pine Oxide Gold Project (“Black Pine”) in southeast Idaho . The new results confirm

consistent, robust gold recoveries across previously untested areas, supporting the feasibility

development of a run-of-mine (“ROM”) heap leach processing flowsheet at Black Pine.

Highlights

• Consistent Gold Extractions and Leach Performance: Weighted average column leach gold

extraction of 80.6%, with individual composites reaching up to 90.8%, demonstrating

metallurgical continuity across multiple mineralized zones; all of the Phase 5A composites

tested exhibit the typical Black Pine leach result of greater than 80% of the eventual gold

extraction achieved in under 10 days.

• Corroborated Bottle Roll Data: Gold and silver extractions from coarse crush bottle roll

tests strongly correlate with column leach results, 78.9% vs 80.6%, respectively, in line

with previous metallurgical results.

• De-risking Project Development: Phase 5A column tests reinforce the suitability of ROM

heap leach processing and provide key inputs into the ongoing feasibility study

metallurgical model.

• Expanded Metallurgical Coverage: Phase 5A testing included composites from Back Range

and J Zone, areas not previously tested and variability composite s infilling previous

sampling in the M Zone, Tallman and F zones.

• Ongoing Programs: Phase 5B (additional variability infill composites) results are expected

in Q3, 2025, Phase 7 (cut-off-grade (“COG”) composites) results expected in Q4, 2025 and

Phase 6 (bulk samples) and Phase 8 (legacy heap facility (“HLF”) sonic drilling composites)

expected in early H1, 2026.

Jon Gilligan, President and CEO, Liberty Gold, commented, “These results further demonstrate that

Black Pine’s oxide gold mineralization is highly amenable to ROM heap leaching, including areas outside

the main deposit zones. As we advance toward the completion of our feasibility study, this growing

metallurgical dataset will help optimize processing parameters, underpin robust project economics, and

reduce technical risk.”

Page 2 of 6

Phase 5A Metallurgical Test Summary

The Phase 5A program was designed to expand the metallurgical dataset into areas not previously

tested and fill gaps in the main deposit areas, confirming consistency of recoveries across the

broader mineralized footprint. See Figure 1 below for Phase 5A variability composite metallurgical

drill core locations. Metallurgical composites were made from PQ sized core drilled in 2023. A total

of 24 column leach tests were completed under standard test conditions for Black Pine oxide gold

mineralized material, with results summarized below in Table 1.

Figure 1 – Summary map of Black Pine Metallurgical Program Sample Locations

Page 3 of 6

Table 1 – Weighted Average Gold Extraction Results by Zone – Coarse Bottle Roll and Column

Leach Tests

Zone Average Calculated

Head Grade Au (ppm)

Weighted Average Bottle

Roll Gold Recovery (%)

P80

Weighted Average Column

Leach Gold Recovery (%)

P80

Back

Range

Zone

1.68 80.7% 81.9%

J Zone 0.59 78.9% 78.0%

Tallman

Zone 0.63 75.8% 81.1%

M Zone 0.58 77.3% 81.1%

F Zone 0.42 67.0% 67.3%

All Zones

78.9% 80.6%

Notes: Average Calculated Head Grade is the average of the composite column head grades tested within each

zone. Detailed sample-level results are provided in Table 2 below.

Silver

Column leach tests also showed silver (“Ag”) extractions ranging from 13.7% to 72. 3%. Silver

grades and extractions in M-Zone and Back Range appear higher than other mineralized areas at

Black Pine. Silver grades and extractions for J Zone, Tallman and F Zone are in line with results

from previous metallurgical test phases. Historic production of silver was in the approximate ratio

of ~0.4 ounces of silver for every ounce of gold. Liberty Gold is currently evaluating adding silver

to the resource estimate in the feasibility study.

Interpretation

• Phase 5A gold extractions are in line with previous metallurgical testing across the main

mineralized zones.

• The strong correlation between bottle roll and column leach data validates process

predictability and supports a simple, low-cost ROM leach processing flowsheet for Black

Pine oxide ores.

• These results further de-risk the processing strategy ahead of the feasibility study.

Page 4 of 6

Ongoing Metallurgical Program

Liberty Gold has an active feasibility-level metallurgical program:

• Phase 5B: Twenty-one “infill” variability composites from Rangefront and Discovery Zone

have completed column leaching and final results are expected in Q3, 2025.

• Phase 6: Seven (Six in-pit and one surface) 20 tonne ROM surface bulk samples sourced

from the main mineralized lithology types, will be tested in Pilot -Scale columns (4 feet

diameter x 20 feet high) at Kappes, Cassiday & Associates (“KCA”) in Reno. Three bulk

samples are currently under leach and the remaining four are in sample collection and

preparation. Results are expected in H1 2026.

• Phase 7: Nine cut-off grade variability composites currently under column leach.

• Phase 8: 24 sonic drill holes (~1,400 meters) have been completed in the legacy heap leach

pad, with initial gold assays received. Metallurgical studies and composites are currently

being planned. It is expected that test work will commence in late Q3, 2025. This material

will be tested for the potential to act as over-liner material and also as direct leach feed.

These programs are designed to finalize gold leach recoveries and optimize process design

criteria as inputs to the Feasibility Study targeted for completion in Q4, 2026.

Quality Assurance – Quality Control

All metallurgical work at Black Pine was conducted at KCA Labs in Reno and is supervised by Gary

Simmons, MMSA, formerly Director of Metallurgy and Technology for Newmont Mining Corp. Mr.

Simmons has managed metallurgical programs on multiple Carlin-style oxide deposits in the Great

Basin.

Peter Shabestari, P.Geo., Vice President Exploration, Liberty Gold, is the Qualified Person

responsible for reviewing and approving the technical content of this release.

Page 5 of 6

Table 2 – Phase 5A Gold Extraction Results

Sample ID Test Area Bottle Roll %

Extraction

Calculated

Head Grade

Au (ppm)

Column Leach

% Au Ext

Calculated Head

Grade Au (ppm)

98104 B Backrange 66.6 0.433 64.3 0.412

98105 A Backrange 83.9 2.143 85.5 2.107

98106 A Backrange 80.9 5.039 80.1 4.689

98107 B Backrange 86.8 1.167 89.6 1.116

98107 A Backrange 75.3 0.347 76.5 0.306

98108 B Backrange 64.1 0.381 61.8 0.340

98110 B Backrange 83.6 3.983 85.4 4.682

98111 B Backrange 75.4 1.372 79.6 1.355

98112 A Backrange 48.4 0.173 37.6 0.125

98113 A J Zone 78.6 0.562 81.2 0.527

98114 B J Zone 62.7 0.417 64.7 0.337

98115 A J Zone 79.9 1.057 81.0 0.919

98116 A J Zone 86.0 0.836 column abandoned

98117 B Tallman 70.4 0.492 81.0 0.400

98118 B Tallman 65.6 0.342 71.0 0.276

98119 A Tallman 81.0 1.191 83.5 1.204

98120 A M Zone 64.2 0.735 73.6 0.747

98121 B M Zone 73.9 0.263 82.6 0.242

98122 A M Zone 83.4 0.509 86.6 0.461

98123 B M Zone 68.7 0.321 72.8 0.309

98124 B M Zone 82.2 0.859 77.5 0.883

98125 B M Zone 84.9 0.779 90.8 0.840

98126 B F Zone 69.3 0.849 67.3 0.837

98127 B F Zone 56.2 0.245 56.1 0.244

98128 A F Zone 71.6 0.165 81.8 0.187

Averages 78.9% 0.986 ppm Au 80.6% 0.981 ppm Au

Footnote: ppm = parts per million or grams per tonne (g/t)

ABOUT LIBERTY GOLD

Liberty Gold is focused on developing open pit oxide deposits in the Great Basin of the United

States, home to large-scale gold projects that are ideal for open -pit mining. This region is one of

the most prolific gold-producing regions in the world and stretches across Nevada and into Idaho

and Utah. The Company is advancing the Black Pine Project in southeastern Idaho, a past -

producing, Carlin-style gold system with a large, growing resource and strong economic potential.

We know the Great Basin and are driven to advance big gold deposits that can be mined profitably

in open-pit scenarios and in an environmentally responsible manner.

Page 6 of 6

For more information, visit libertygold.ca or contact:

Susie Bell, Manager, Investor Relations

Phone: 604-632-4677 or Toll Free 1-877-632-4677

[email protected]

This news release contains “forward-looking information” and “forward-looking statements” within the meaning of applicable securities laws,

including statements or information concerning, future financial or operating performance of Liberty Gold and its bu siness, operations,

properties and condition; planned de-risking activities at Liberty Gold’s mineral properties; the potential quantity, recoverability and/or grade

of minerals; the potential size of a mineralized zone or potential expansion of mineralization; proposed exploration and development of Liberty

Gold’s exploration property interests; the results of mineral resource estimates or mineral reserve estimates and preliminary feasibility studies;

and the Company’s anticipated expenditures.

Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue" , "planned",

"expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of

such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be

achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of

management at the date the statements are made including, among others, assumptions about future prices of gold, and other me tal prices,

currency exchange rates and interest rates, favourable operating conditions, political stability, timely receipt of governmental or regulatory

approvals, including any stock exchange approvals; receipt of a financing on time, obtaining renewals for existing licenses a nd permits and

obtaining required licenses and permits, labour stability, stability in market conditions, availability of equipment, , the scalability of results of

metallurgical testing, results or timing of any mineral resources, feasibility study, EIS, mineral reserves, or pre-feasibility study; the availability of

drill rigs, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are

not within the control of Liberty Gold and there is no assurance they will prove to be correct.

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any

future results expressed or implied by such forward -looking information, including, risks related to the interpretation of results and/or the

reliance on technical information provided by third parties as related to the Company’s mineral property interests; changes in project parameters

as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the

costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted

parties to perform; the timing and success of exploration activities generally; recoveries being inconsistent with metallurgical test results; the

timing or results of the publication of any mineral resources, mineral reserves EIS or feasibility studies; delays in permitting; possible claims

against the Company; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing, timing of

the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated March 25, 2025, in the

section entitled "Risk Factors", under Liberty Gold’s SEDAR+ profile at www.sedarplus.ca.

Although Liberty Gold has attempted to identify important factors that could cause actual actions, events or results to diffe r materially from

those described in forward -l o o k i n g i n f o r m a ti o n , t h e r e m a y b e o t h e r f a c t o r s t h a t c a u s e a c ti o n s , e v e n t s o r r e s u l t s not to be as anticipated,

estimated or intended. There can be no assurance that such information will prove to be accurate as actual results, and futur e events could

differ materially from those anticipated in such statements. Liberty Gold disclaims any intention or obligation to update or revise any forward-

looking information, whether as a result of new information, future events or otherwise, except for material differences between actual results

and previously disclosed material forward-looking information, or as otherwise required by law.

E x c e p t f o r s t a t e m e n t s o f h i s t o r i c a l f a c t , i n f o r m a ti o n c o n t a i n e d h e r e i n o r i n c o r p o r a t e d b y r e f e r e n c e h e r e i n c o n s ti t u t e s forward-looking

statements and forward -looking information. Readers should not place undue reliance on forward- looking information. All forward-looking

statements and forward-looking information attributable to us is expressly qualified by these cautionary statements.

Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources

The information, including any information incorporated by reference, and disclosure documents of Liberty Gold that are filed with Canadian

securities regulatory authorities concerning mineral properties have been prepared in accordance with the requirements of sec urities laws in

effect in Canada, which differ from the requirements of United States securities laws.

Without limiting the foregoing, these documents use the terms “measured resources”, “indicated resources”, “inferred resources” and “mineral

reserves”. These terms are Canadian mining terms as defined in, and required to be disclosed in accordance with, NI 43-101, which references

the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) – CIM Definition Standards, adopted by the

CIM Council, as amended. However, these standards differ significantly from the mineral property disclosure requirements of the United States

Securities and Exchange Commission (the “SEC”) in Regulation S -K S u b p a rt 1 300 ( th e “SE C M od er ni z a ti o n R u les ”) u nd er th e U ni t ed S t a t e s

Securities Act of 1934, as amended. The Company does not file reports with the SEC and is not required to provide disclosure on its mineral

properties under the SEC Modernization Rules and will continue to provide disclosure under NI 43-101 and the CIM Definition Standards.