Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LGD.TO ·

Liberty Gold Reports Additional Core Drill Results from the Discovery Zone at the Black Pine Oxide Gold Project, Idaho 0.74 g/t Au over 40.3 m including 1.06 g/t Au over 10.1 m 0.51 g/t Au over 58.4 m and 0.85 g/t Au over 22.7 m

Drill Results

Page 1 of 5

News Release 24-02 February 7, 2024

Liberty Gold Reports Additional Core Drill Results from the

Discovery Zone at the Black Pine Oxide Gold Project, Idaho

0.74 g/t Au over 40.3 m including 1.06 g/t Au over 10.1 m

0.51 g/t Au over 58.4 m and 0.85 g/t Au over 22.7 m

VANCOUVER, B.C. – Liberty Gold Corp. (TSX:LGD; OTCQX:LGDTF) (“Liberty Gold” or the

“Company”) is pleased to report assay results from an additional four core holes from the 11 hole,

property-wide 2023 core drill program at its Black Pine Oxide Gold Project (“Black Pine”) in

southeastern Idaho. Drill results released herein include core drilling from the Discovery Zone and

surrounding areas.

Cal Everett, CEO and Director of Liberty Gold commented, “These latest core drill results from 2023

drilling returned better than expected grades and widths and continue to increase our confidence in the

oxide gold deposit at Black Pine.”

Four core holes were drilled along the main resource periphery in J Zone (north) , Tallman (east),

and F Zone (south) and one hole in the center of the Discovery Zone.

• J Zone – The first ever core hole drilled in J Zone, LBP1010C, was planned to add metallurgical

data for this area and hit a thicker intercept than expected at 0.63 grams per tonne (“g/t”) gold

(“Au”) over 46.3 meters (“m”) beginning at 6.2 m depth. Initial cyanide solubility data indicate

this hole is oxide with recoveries similar to other areas already tested at Black Pine. J Zone is

a sparsely drilled resource area that has significant growth potential to the north, east and

west.

• Tallman – One vertical hole was drilled in this large, near surface resource area to confirm other

nearby metallurgical results and hit better than expected grades and widths of 0.51 g/t Au over

58.4 m and 0.85 g/t Au over 22.7 m including 1.83 g/t Au over 5.1 m. Overall this zone represents

a near surface, 81.1 m thick interval with cyanide solubility data indicating this zone will also

have high recoveries similar to other areas at Black Pine.

• F Zone – F Zone is a higher grade, near surface zone of mineralization extending 700 meters

south from the Main Discovery Zone toward the CD Pit area. The core hole drilled here

returned 0.74 g/t Au over 40.3 m starting from surface, which is a slightly better intercept than

a nearby Reverse Circulation hole (LBP660). Additional drilling in 2024 will be targeting infill

and extensions to this zone.

Page 2 of 5

• Discovery Main – One core hole (LBP1011C) was drilled in the central Discovery Zone and hit

a near continuous zone of mineralized material from surface to the end of hole at 350 m. Drill

intersection highlights from this drilling are included in the table below.

DRILL HOLE MAP:

For the map showing locations of drill holes in this release, click here:

h t t p s ://p r.g lo b e n e w s w ire .c o m /File D o w n lo a d e r/D o w n lo a d File ? s o u rc e =m l&file Gu id =

a 9 113 c f 0-b486 -43 40- 8655- a5c4 1 0 e d 58e 2

Page 3 of 5

DRILL RESULTS TABLE*

* Results are reported as drilled thicknesses, with true thicknesses approximately 50% to 90% of drilled thickness. Some inte rcepts have zones of

reduced cyanide solubility. Gold grades are uncapped. Au (g/t) = grams per tonne of gold.

2024 WORK PLAN

• The permit amendment Plan of Operations (“PoO”) #4 for the expanded exploration area

on United States Forest Service (“USFS”) lands is expected to be received in Q2 2024.

• An exploration drill program is being planned for new discovery in the currently permitted

lands as well as throughout this new expanded permit area.

• Final work is being completed on an update to the mineral resource that is expected to be

released in Q1 2024.

• A Phase 5 Metallurgical program is expected to begin on core samples from 2023.

• Work i s well underway on the Pre -Feasibility Study for the Black Pine with results

expected in Q3 2024.

QUALIFIED PERSON

Peter Shabestari, P.Geo., Vice -President Exploration, Liberty Gold, is the Company's designated

Qualified Person for this news release within the meaning of National Instrument 43- 101

Standards of Disclosure for Mineral Projects ("NI 43 -101") and has reviewed and validated that

the information contained in the release is accurate.

Hole ID (Az, Dip)

(degrees) From (m) To (m) Intercept

(m) Au (g/t) Au

Cut-Off

Hol e Length

(m) Target g/t x m

LBP1001C (310, -65) 0.0 40.3 40.3 0.74

incl 15.0 25.1 10.1 1.06

and 43.7 58.6 14.9 0.23

LBP1008C (0, -90) 17.1 75.4 58.4 0.51

and 81.7 104.4 22.7 0.85

incl 59.9 65.0 5.1 1.83 1.00

LBP1010C (20, -70) 6.2 52.5 46.3 0.63 0.15

incl 34.0 39.8 5.8 1.36 1.00

and 70.7 75.3 4.6 0.92 0.15

LBP1011C (85, -60) 9.6 11.2 1.5 0.94

and 24.2 33.6 9.4 0.21

and 40.1 46.2 6.1 0.40

and 92.0 102.6 10.5 0.26

and 117.5 123.3 5.8 0.21

and 192.5 212.7 20.2 1.25

incl 203.2 207.4 4.3 2.59 1.00

and 227.6 231.9 4.3 1.37

and 237.7 244.8 7.0 0.76

and 251.6 257.7 6.0 1.72

and 286.1 291.2 5.1 0.45

and 294.3 299.1 4.8 0.31

and 312.5 317.5 5.0 0.54

33.1

Discovery - Tallman

Zone 48.80.15 113.7

0.15 79.9 F Zone

79.8 J Zone 33.3

0.15

349.5 Discovery - Main

Zone 63.2

0.15

Page 4 of 5

ABOUT LIBERTY GOLD

Liberty Gold is focused on exploring for and developing open pit oxide deposits in the Great Basin

of the United States, home to large -scale gold projects that are ideal for open -pit mining. This

region is one of the most prolific gold-producing regions in the world and stretches across Nevada

and into Idaho and Utah. We know the Great Basin and are driven to discover and advance big

gold deposits that can be mined profitably in open-pit scenarios.

For more information, visit libertygold.ca or contact:

Susie Bell, Manager, Investor Relations

Phone: 604-632-4677 or Toll Free 1-877-632-4677

[email protected]

QUALITY ASSURANCE – QUALITY CONTROL

Drill composites were calculated using a cut-off of 0.15 g/t Au. Drill intersections are reported as

drilled thicknesses. True widths of the mineralized intervals vary between 30% and 100% of the

reported lengths due to varying drill hole orientations but are typically in the range of 50% to 90%

of true width. Drill samples were assayed by ALS Limited in Reno, Nevada for gold by Fire Assay

of a 30 gram (1 assay ton) charge with an AA finish, or if over 5.0 g/t Au were re-assayed and

completed with a gravimetric finish. For these samples, the gravimetric data were utilized in

calculating gold intersections. For any samples assaying over 0.10 parts per million an additional

cyanide leach analysis is done where the sample is treated with a 0.25% NaCN solution and rolled

for an hour. An aliquot of the final leach solution is then centrifuged and analyzed by Atomic

Absorption Spectroscopy. QA/QC for all drill samp les consists of the insertion and continual

monitoring of numerous standards and blanks into the sample stream, and the coll ection of

duplicate samples at random intervals within each batch. All holes are also analyzed for a 51 multi-

element geochemical suite by ICP -MS. ALS Geochemistry -Reno is ISO 17025:2005 Accredited,

with the Elko and Twin Falls prep lab listed on the scope of accreditation.

All statements in this press release, other than statements of historical fact, are "forward -looking information" with respect to Liberty Gold

within the meaning of applicable securities laws, including statements that address potential quantity and/or grade of minerals, the potential

size of the mineralized zone, the proposed timing of exploration and development plans, the timing of metallurgical program, the timing of the

receipt of any PoO, the expansion and future resource growth expected at Black Pine, the timing of any Pre-Feasibility study, expected capital

costs at Black Pine, expected gold recoveries from the Black Pine mineralized material, the potential upgrade of inferred min eral resources to

measured and indicated mineral resources, the potential for future additions to the current mineral resource estimate, the 2024 work program

and the results thereof. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan",

"continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes

a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could" , "would", "might" or

"will" be taken, occur or be achieved. Forward -looking information is not a guarantee of future performance and is based upon a number of

estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of

gold, and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stabilit y, obtaining

governmental approvals and financing on time, obtaining renewals for existing licenses and permits and obtaining required licenses and permits,

labour stability, stability in market conditions, availability of equipment, the availability of drill rigs, successful resol ution of disputes and

anticipated costs and expenditures. Many as sumptions are based on factors and events that are not within the control of Liberty Gold and

there is no assurance they will prove to be correct.

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any

future results expressed or implied by such forward -looking information, including, risks related to the interpretation of results and/or the

reliance on technical information provided by third parties as related to the Company’s mineral property interests; changes in project

parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery

rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of

Page 5 of 5

contracted parties to perform; the timing and success of exploration activities generally; the timing of the publication of any updated resources;

delays in permitting; possible claims against the Company; labour disputes and other risks of the mining indu stry; delays in obtaining

governmental approvals, financing or in the completion of exploration as well as those factors discussed in the Annual Information Form of the

Company dated March 28, 2023 in the section entitled "Risk Factors", under Liberty Gold’s SEDAR profile at www.sedar.com.

Although Liberty Gold has attempted to identify important factors that could cause actual actions, events or results to diffe r materially from

those described in forward- looking information, there may be other factors that cause actions, events or results not to be as anticipated,

estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could

differ materially from those anticipated in such statements. Liberty Gold disclaims any intention or obligation to update or revise any forward-

looking information, whether as a result of new information, future events or otherwise.

Cautionary Note for United States Investors

The information in this news release, including any information incorporated by reference, and disclosure documents of Libert y Gold that are

filed with Canadian securities regulatory authorities concerning mineral properties have been prepared in accordance with the requirements

of securities laws in effect in Canada, which differ from the requirements of United States securities laws.

Without limiting the foregoing, these documents use the terms “measured resources”, “indicated resources”, “inferred resources” and “probable

mineral reserves”. Shareholders in the United States are advised that, while such terms are defined in and required by Canadian securities laws,

the United States Securities and Exchange Commission (the “SEC”) does not recognize them. Under United States standards, mine ralization

may not be classified as a reserve unless the determination has been made that the mineralization could be economically and legally produced

or extracted at the time the reserve determination is made. United States investors are cautioned not to assume that all or any part of measured

or indicated resources will ever be converted into reserves. Further, inferred resources have a great amount of uncertainty as to their existence

and as to whether they can be mined legally or economically. It cannot be assumed that all or any part of the inferred resour ces will ever be

upgraded to a higher resour ce category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility,

pre-feasibility or other technical reports or studies, except in rare cases. Therefore, United States investors are also cautione d not to assume

that all or any part of the inferred resources exist, or that they can be mined legally or economically. Disclosure of contained ounces is permitted

disclosure under Canadian regulations; however, the SEC normally only permits issuers to report resource s as in place tonnage and grade

without reference to unit measures. Accordingly, information concerning descriptions of mineralization and resources containe d in these

documents may not be comparable to information made public by United States companies su bject to the reporting and disclosure

requirements of the SEC.