Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LGD.TO ·

Liberty Gold Drills Thick, High-Grade Carlin-Style Gold Mineralization at the Black Pine Project, Idaho, USA, Including 2.51 g/t Oxide Gold over 41.1 Metres and 0.94 g/t Au over 100.6 Metres Results Continue to Expand Second Zone of High-Grade Oxide Gold

Drill Results

N E W S R E L E A S E 1 9 - 1 8 O c t o b e r 1 , 2019

Liberty Gold Drills Thick, High-Grade Carlin-Style Gold Mineralization at the Black

Pine Project, Idaho, USA, Including 2.51 g/t Oxide Gold over 41.1 Metres and

0.94 g/t Au over 100.6 Metres

Results Continue to Expand Second Zone of High-Grade Oxide Gold

Mineralization; Still Open in All Directions

VANCOUVER, B.C. – Liberty Gold Co rp. (LGD-TSX) (“Liberty Gold” or the “Company”)

is pleased to announce that drilling at Black Pine in southern Idaho, USA, continues to

return thick, high-grade interval s of Carlin-style oxide gold m ineralization. New results

from Discovery 2 expand the footprint of mineralization and con firm the Company thesis

that previous operators did not test laterally and to depth in this 12 square kilometer (“km2)

sedimentary rock-hosted gold system.

DISCOVERY 2 ZONE DRILL HIGHLIGHTS INCLUDE1:

Hole ID (Az, Dip)   

(degrees)

From    

(m)

To        

(m)

Intercept  

(m)

Au      

(g/t)

Au        

Cut‐Off 

(g/t)

Hole 

Length 

(m)

Target Comments

LBP051 (187, -66) 131.1 172.2 41.1 2.51 0.2

including 137.2 144.8 7.6 6.69 1

and including 137.2 141.7 4.6 9.11 5

including 149.4 157.0 7.6 4.85 1

and including 152.4 155.4 3.0 8.52 5

LBP052 (35, -62) 74.7 96.0 21.3 0.61

and 102.1 126.5 24.4 0.34

and 202.7 231.6 29.0 0.28

and 269.7 309.4 39.6 0.77

LBP054 (52, -66) 39.6 68.6 29.0 0.31

and 248.4 349.0 100.6 0.94

incl 253.0 268.2 15.2 1.65

and incl 335.3 345.9 10.7 2.33

LBP055 (88, -68) 4.6 36.6 32.0 0.47

and 71.6 99.1 27.4 0.53

and 166.1 179.8 13.7 1.21

and 192 265.2 73.2 1.02

incl 192 208.8 16.8 2.39 1

LBP056 (245, -80) 199.6 225.6 25.9 0.48

and 231.6 271.3 39.6 1.89

incl 231.6 245.4 13.7 4.58 1

LPB057 (105, -74) 0.0 38.1 38.1 0.40

and 173.7 239.3 65.5 0.77

incl 179.8 195.1 15.2 1.68 1

0.2

Discovery 2 

Zone

Ended in 

Mineralization

0.2 342.9 Discovery 3 

Zone?

205.7

300.2 Discovery 2 

Zone

0.2

379.5 Discovery 2 

Zone1

0.2 266.7 Discovery 2 

Zone  

285.0 Discovery 2 

Zone

Ended in 

Mineralization

1A number of mineralized intervals were omitted from this table for brevity. Please refer to the full table at

the link below for complete results. Grams per Tonne Gold abbreviated as “g/t Au”.

For a cross section and long sections of drill collars and traces for the current release,

please click

here: http://libertygold.ca/images/news/2019/october/BlackPine_NR10012019CS.pdf

For a map of drill collars and traces for the current release, please click

here: http://libertygold.ca/images/news/2019/october/BlackPine_NR10012019Map.pdf

For a complete table of drill results from all Liberty Gold drill holes at Black Pine, please

click here: http://libertygold.ca/images/news/2019/october/BP_Intercepts10012019.pdf

The Discovery 2 zone continues to deliver high grades along a n orth-northwest-striking

feeder fault corridor, as well as long intervals of approximate ly 1 g/t Au in the footwall

area to the east. Liberty Gold believes that this represents a small portion of the total

strike length of the Discovery 2 zone. The two zones are projected to converge near the

northern margin of and below the historic B Pit, with an averag e mined grade of 1.38 g/t

Au.

Key Points

 The Discovery 2 Zone remains open in all directions. The target

stratigraphic interval in the initial 1 km2 Focus Area (the “Focus Area”) is

still largely untested. This interval also extends throughout most areas of

the 12 km gold system, which also awaits drill testing.

 Drill holes LBP054 and LBP055 were drilled in the hangingwall of the

mineralized fault corridor represented by LBP043, representing a 50 to 100

m step-out to the east. Both returned long intercepts consisting of

approximately 100 m of gold mineralization averaging approximately 1 g/t

Au.

 In total, LBP055 contains 164.4 m of gold mineralization at or above the

reportable cut-off (0.2 g/t Au) in the first 265.2 m of the hole.

 Likewise, LBP054 contains 172.2 m of gold mineralization at or above the

reportable cut-off (0.2 g/t Au) in the first 345.9 m of the hole.

 All highlight intercepts to date are oxide. Weighted average cyanide

solubility for the primary high-grade interval in LBP051 is 89%, for LBP055,

89%, and for LBP056, 91%.

 Drill hole LBP052, located approximately 200 m northeast of the presently-

defined limits of the Discovery 2 Zone, may represent a new “Discovery 3”

zone of mineralization. Nearby historic RC hole 87-127 bottomed in 16.8 m

grading 2.42 g/t Au.

 With the new drilling in the Discovery 2 zone, seven of the top 10 unmined

intercepts on the Black Pine Property have been drilled by Liberty Gold.

 A core drill was added to the project on September 24 to obtain material for

metallurgical testing, specific gravity measurements, validation of RC drill

holes and structural, mineralogical and stratigraphic studies.

“We continue to be extremely happy with the results coming out of Black Pine,” stated

Moira Smith, VP, Exploration a nd Geoscience. “It is hard to ove rstate the potential

significance of the grades and widths of mineralization encountered in this drilling, given

that our target is a low capi tal and operating cost, bulk tonna ge, heap-leachable oxide

gold deposit. High-grade intercepts of greater than 1.0 g/t Au are hosted i n a relatively

flat-laying calcareous sandstone unit outcropping in the historic B Pit, A Basin and A Pit.

Our drilling to date is starting to connect these three areas u nder the ridge with zones of

continuous mineralization. His toric and Liberty Gold drilling demonstrates that the rock

overlying the high-grade zones als o contains broad areas of oxi de gold mineralization,

with intercepts typically ranging from 0.20 to 0.60 g/t Au. Bas ed on the results received

to date, we anticipate a low overall strip ratio. We intend to accelerate the drill program in

2020.”

DISCOVERY 1 ZONE NEW RESULTS

Results were also received for infill and step-out holes in the Discovery 1 zone. Additional

step out drilling will be carried out to extend this zone to the northwest, and to better define

the transition of this zone into historic B pit mineralization to the southeast. It is presently

approximately 150 to 200 m wide and 1 km long and may continue to the southeast on

the south side of the B pit complex, beyond the limits of the Focus Area.

DISCOVERY 1 ZONE DRILL HIGHLIGHTS INCLUDE:

Drilling in October will continue to focus on step-outs to the Discovery 1 and 2 zones, as

well as testing of two potential new zones located further to the east.

Hole ID (Az, Dip)   

(degrees)

From    

(m)

To        

(m)

Intercept  

(m)

Au      

(g/t)

Au        

Cut‐Off 

(g/t)

Hole 

Length 

(m)

Target Comments

LBP024 (248, -64) 181.4 210.3 29.0 0.57 0.2 233.2 Discovery 1

LBP034 (68, -46) 45.7 71.6 25.9 0.35

and 144.8 169.2 24.4 0.39

and 245.4 266.7 21.3 1.11

including 245.4 251.5 6.1 3.19 1

and 294.1 301.8 7.6 1.80 0.2

including 295.7 300.2 4.6 2.56 1

and 307.8 313.9 6.1 0.62 0.2

LBP035 (100, -60) 164.6 179.8 15.2 0.69 0.2

including 175.3 178.3 3.0 1.94 1

and 213.4 227.1 13.7 1.18 0.2

including 221.0 225.6 4.6 2.68 1

LBP038 (0, -90) 210.3 248.4 38.1 0.57

and 294.1 313.9 19.8 0.87

LBP042 (094, -58) 32.0 51.8 19.8 0.39

and 102.1 109.7 7.6 0.62

and 240.8 263.7 22.9 1.53

including 242.3 259.1 16.8 1.88 1

0.2

0.2 300.2 Discovery 1 

Zone

0.2 324.6 Discovery 1 

Zone

288.0 Discovery 1 

Zone

374.9 Discovery 1 

Zone

ABOUT THE 2019 BLACK PINE DRILL PROGRAM

One Reverse Circulation (“RC”) drill was deployed on April 23, 2019, with a second drill

added on June 18, to drill an estimated 20,000 m in 80 to 100 h oles to provide a

comprehensive test of a portion of the core of an oxide gold system estimated at over 12

km2 in size. A diamond core drill was added on September 24 to drill an estimated 1600

m program. The drill program repre sents the culmination of over 2 years of intensive

compilation, modeling and interpretation of the complex geology of the project, as well as

a 20 month permitting process. The goal of the 2019 drill progr am is to carry out a

comprehensive test of the geological and mineralization model o ver a roughly one km 2

Focus Area encompassing a highly prospective location near the historic A and B historic

pits, in order to establish an d refine the model for use throug hout the project area.

Extensive data compilation, involving over 1800 historic drill holes, thousands of surface

soil and rock samples and 5 shallow pits, suggests that a large volume of rock under and

adjacent to zones of previously drill-tested and/or mined gold mineralization contains

highly prospective stratigraphy and favourable structural setti ngs for hosting Carlin-style

gold mineralization.

ABOUT BLACK PINE

Black Pine is located in the northern Great Basin, immediately adjacent to the Utah/Idaho

border. It is a Carlin-style gold system, similar in many ways to the prolific deposits located

along Nevada’s Carlin trend. Like Newmont’s Long Canyon deposi t, Black Pine

represents a growing number of Carlin-style gold systems located off the main Carlin and

Cortez trends in underexplored parts of the Great Basin. The h istoric Black Pine Mine

operated from 1992 to 1997, during a period of historically low gold prices, with 435,000

ounces of gold produced from five composite, shallow pits, at a n average grade of 0.63

g/t Au and average recovery of approximately 66%.

A virtual site tour and 3D model of Black Pine property, including details about the geology

and mineralization, is availabl e on the homepage of the Company ’s website,

www.libertygold.ca, and in a Technical Report also available on the Company website.

Moira Smith, Ph.D., P.Geo., Vice-President Exploration and Geoscience, Liberty Gold, is the Company's designated Qualified Person for this news release within the meaning of

National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed and validated that the i nformation contained in the release is accurate.

Drill composites were calculated using a cut-off of 0.20 g/t. Drill intersections are reported as drilled thicknesses. True wid ths of the mineralized intervals vary between 30 and

100% of the reported lengths due to varying drill hole orientations, but are typically in the range of 60 to 100% of true width. Drill samples were assayed by ALS Limited in Reno,

Nevada for gold by Fire Assay of a 30 gram (1 assay ton) charge with an AA finish, or if over 5.0 g/t were re-assayed and completed with a gravimetric finish. For these samples,

the gravimetric data were utilized in calculating gold intersections. For any samples assaying over 0.20 ppm an additional cyan ide leach analysis is done where the sample is

treated with a 0.25% NaCN solution and rolled for an hour. An aliquot of the final leach solution is then centrifuged and analyzed by Atomic Absorption Spectroscopy. QA/QC for

all drill samples consists of the insertion and continual monitoring of numerous standards and blanks into the sample stream, a nd the collection of duplicate samples at random

intervals within each batch. Selected holes are also analyzed for a 51 multi-element geochemical suite by ICP-MS. ALS Geochemis try-Reno is ISO 17025:2005 Accredited, with

the Elko prep lab listed on the scope of accreditation.

ABOUT LIBERTY GOLD

Liberty Gold is focused on exploring the Great Basin of the United States, home to

large-scale gold projects that are ideal for open-pit mining. This region is one of the

most prolific gold-producing regions in the world and stretches across Nevada and into

Idaho and Utah. We know the Great Basin and are driven to discover and advance big

gold deposits that can be mined profitably in open-pit scenarios. Our flagship projects

are Black Pine, Goldstrike and Kinsley Mountain, all of which are past producing open-

pit mines, where previous operators only scratched the surface.

For more information, visit www.libertygold.ca or contact:

Susie Bell, Manager, Investor Relations

Phone: 604-632-4677 or Toll Free 1-877-632-4677

[email protected]

All statements in this press release, other than statements of  historical fact, are "forward‐looking information" with respect  to Liberty Gold within the meaning  of applicable securities la ws, 

including statements regarding timing of the anticipated metall urgical results, potential quantity and/or grade of minerals, p otential size and expansion of a mineralized zone, proposed tim ing 

of exploration and development plans. Forward‐looking informati on is often, but not always, identified by the use of words suc h as "seek", "anticipate", "plan", "continue", "planned", "expect", 

"project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "go al", or variation of such words and phrases or state that certa in actions, 

events or results "may", "should", "could", "would", "might" or  "will" be taken, occur or be achi eved. Forward‐looking information is not a guarantee of future performance and is based upon  a 

number of estimates and assumptions of management at the date t he statements are made including, among others, assumptions abo ut future prices of gold, and other metal prices, currency 

exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licenses and permits 

and obtaining required licenses  and permits, labour stability,  stability in market conditions,  availability of equipment, accu racy of any mineral resources,  the availability of drill rigs,  successful 

resolution of disputes and anticipated costs and expenditures.  Many assumptions are based on factors and events that are not w ithin the control of Liberty Gold and there is no assurance the y 

will prove to be correct. 

Such forward‐looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward‐

looking information, including, risks related to the interpreta tion of results and/or the reliance on technical information pr ovided by third parties as related to the Company’s mineral pro perty 

interests; changes in project parameters as plans continue to b e refined; current economic conditions; future prices of commod ities; possible variations in grade or recovery rates; the cost s and 

timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration activities 

generally;  delays  in  permitting;  possible  claims against  the  Company;  labour  disputes  and  other risks  of the  mining  industry; delays  in  obtaining  governmental  approvals,  financing  or  in the 

completion of exploration as well as those factors discussed in  the Annual Information Form of the Company dated March 27, 201 9 in the section entitled "Risk  Factors", under Liberty Gold’s 

SEDAR profile at www.sedar.com.Although Liberty Gold has attempted to identify important factors that could cause actual actions, events or results to diffe r materially from those described in 

forward‐looking information, there may be other factors that ca use actions, events or results n ot to be as anticipated, estima ted or intended. There can be no assurance that such informatio n 

will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Liberty Gold disclaims any intention or obligation to update or revise 

any forward‐looking information, whether as a result of new information, future events or otherwise unless required by law