Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LGD.TO ·

Liberty Gold Announces 20,000 Metre, Phase 1 Drill Program at Black Pine Oxide Gold Project, Idaho Drilling Commenced on Seven New High-Priority Targets

Exploration Programs

Page 1 of 4

News Release 24-14 July 17, 2024

Liberty Gold Announces 20,000 Metre, Phase 1 Drill Program at Black Pine

Oxide Gold Project, Idaho

Drilling Commenced on Seven New High-Priority Targets

VANCOUVER, B.C. – Liberty Gold Corp. (TSX:LGD; OTCQX:LGDTF) ( “Liberty Gold ” or the

“Company”) is pleased to announce the commencement of a 20,000 metre (“m”) drill program at

its Black Pine Oxide Gold Project (“Black Pine” or the “Project”) in southeast Idaho. This strategic

campaign, focused on seven new high-priority targets, aims to significantly enhance the Project’s

resource base and unlock new areas of oxide gold mineralization within the recently expanded

exploration permit area.

This drilling initiative follows a major permitting milestone for Liberty Gold. A recent amendment

to the existing exploration permit (see press release dated June 11, 2024) from the United States

Forest Service (“USFS”) has expanded the permitted exploration area by 51%, bringing it to a total

of 37.3 square kilometres (“km2”) (the “Expanded Permit Area”). The Expanded Permit Area opens

up access to previously unexplored regions with high potential for the discovery of oxide gold

mineralization.

The amendment to the permit also aligns access criteria across the USFS and adjacent Bureau of

Land Management lands and opens up large areas that previously had timing restrictions for

exploration activity. This greatly facilitates drill access to several lower -elevation areas , in

particular South Rangefront and M Zone, for unrestricted, year-round drilling. With two drills on

site, we anticipate drilling 3,000 m to 3,500 m per month.

“The commencement of this drill program is a pivotal step in our exploration strategy at Black Pine,”

commented Pete Shabestari, Vice President of Exploration at Liberty Gold. “ Our focus on these

high-priority targets is driven by our confidence in the geological potential of these areas. We have been

eagerly awaiting access to these targets and are excited to be once again drilling for new discovery and

resource growth at Black Pine.”

Phase 1 Drill Program

The first reverse circulation (“RC”) drill rig arrived on site at Black Pine in mi d-June and has

commenced the 20,000 m program operating on a double shift ; a second RC rig arrived on site

this week and will further accelerate the exploration activities.

Page 2 of 4

FIGURE 1 – BLACK PINE PROJECT DRILL TARGET AREAS MAP

Link to Figure 1 - Black Pine project drill target areas map:

https://ml.globenewswire.com/resource/download/ca1670ba-1692-4a8c-b56f-ef8ef730d4e2

Evaluate Seven High-Priority Targets

The Expanded Permit Area includes seven compelling previously untested targets that are now

open to exploration drill-testing. These targets range from first tests of prospective horizons within

the strongest linear mineralization trends on the property , to gold-in-soil anomalies ‘leaking’

through Upper Plate cover rocks, suggestive of strong gold systems hosted within the underlying

Middle Plate rocks – similar targets have recently yielded +1 million ounce oxide gold discovery at

Black Pine (see press release date February 15, 2024). All targets have been selected based on

their structural, geochemical and geological similarities to areas of adjacent gold mineralization.

Page 3 of 4

Brief target summaries, not in order of priority or prospectivity, are presented below:

1. Section 36: Drilling has commenced on this ~1.1 km2 target area, which is a step-out target

from the Rangefront Zone (+1 million ounce resource). Gravity data indicates a number of

shallow bedrock blocks in this area, any of which could host near-surface oxide gold

mineralization.

2. Rangefront South: Gold-bearing jasperoids and a strong gold-in-soil anomaly within Upper

Plate cover rocks , similar to the Rangefront Zone , present a compelling target area of

~1.1 km2 to test the highly-prospective underlying Middle Plate rocks.

3. MEX: The M Zone Extension target (“MEX”) has only seen, sparse, shallow historic drilling,

which did not test to target depth, similar to the early Discovery Zone target. Drilling will

be focused on extending oxide gold resources to the north of M Zone, where the highest

average grade deposit at Black Pine is open for extension to the north and west.

4. Back Range Connector: This ~0.6 km2 target area, represents a 1 kilometre (“km”) long gap

that is undrilled to prospective target horizons, lying within an overall 6 k m linear trend,

stretching from Back Range to Rangefront, which hosts ~75% of the gold resource at Black

Pine.

5. Burnt Basin: This ~3.1 km2 target area, with a thin cover of Upper Plate rocks , hosts

multiple, strong and widespread gold-in-soil ‘leakage’ anomalies, similar to those observed

within overlying Upper Plate rocks at Rangefront. Field mapping and drill target refinement

is underway in this large, highly-prospective target which has not had any historic drilling.

6. Crescent: This ~3.4 km2 target is anchored by 2023 drilling in the southeastern -most

corner of the property that intercepted oxide gold mineralization within Middle Plate rocks,

suggesting that the widespread mineral system at Black Pine is still open for further

discovery back to the defined resource areas to the north and west . This target area is

further bolstered by gravity data suggesting potential alteration in shallow blocks of Middle

Plate rocks.

7. Black Pine Canyon: This ~0.5 km2 target covers the southwestern extension of the E Zone,

which hosts the highest-grade mineralization at Black Pine. Gold-bearing structures ‘roll-

over’ at E Zone and switch from dipping predominantly to the northeast throughout the

majority of the deposit, to dipping southwest into Black Pine Canyon, where a strong gold-

in-soil anomaly overlies where these structures should outcrop.

Enhanced Geological Understanding

The drill program will contribute to a wider -scale geological understanding of the lithologic and

structural controls at Black Pine. Detailed analysis of drilling will help refine the geological model,

providing valuable insights into the distribution and characteristics of oxide gold mineralization in

the Project area.

QUALIFIED PERSON

Peter Shabestari, P.Geo., Vice -President Exploration, Liberty Gold, is the Company's designated

Qualified Person for this news release within the meaning of National Instrument 43- 101

Standards of Disclosure for Mineral Projects ("NI 43 -101") and has revie wed and validated that

the information contained in the release is accurate.

Page 4 of 4

ABOUT LIBERTY GOLD

Liberty Gold is focused on exploring for and developing open pit oxide deposits in the Great Basin

of the United States, home to large -scale gold projects that are ideal for open -pit mining.  This

region is one of the most prolific gold-producing regions in the world and stretches across Nevada

and into Idaho and Utah.  We know the Great Basin and are driven to discover and advance big

gold deposits that can be mined profitably in open-pit scenarios. 

For more information, visit libertygold.ca or contact:

Susie Bell, Manager, Investor Relations

Phone: 604-632-4677 or Toll Free 1-877-632-4677

[email protected]

All statements in this press release, other than statements of historical fact, are “ forward-looking information” with respect to

Liberty Gold within the meaning of applicable securities laws, the use of proceeds of the offering, the timing and completion of

the Preliminary Feasibility Study, the timing and completion of formal mine permitting, and the potential quantity and/or grade

of minerals and Liberty Gold’s mineral resources. Forward-looking information is often, but not always, identified by the use of

words such as “seek”, “anticipate”, “plan”, “continue”, “planned”, “expect”, “project”, “predict”, “potential”, “targeting”, “intends”,

“believe”, “potential”, and similar expressions, or describes a “goal”, or variation of such words and phrases or state that certain

actions, events or results “ may”, “should”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward -looking

information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management

at the date the statements are made including, among others, assumptions about future prices of gold, and other metal prices,

currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental

approvals and financing on time, obtaining renewals for existing licenses and permits and obt aining required licenses and

permits, labour stability, stability in market conditions , the timing and success of future plans and objectives in the areas of

sustainable development, health, safety, environment, community development ; successful resolution of disputes and

anticipated costs and expenditures and the timing of regulatory approvals. Many assumptions are based on factors and events

that are not within the control of Liberty Gold and there is no assurance they will prove to be correct.

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially

different from any future results expressed or implied by such forward -looking information, including, risks related to the

interpretation of results and/or the reliance on technical information provided by third parties as related to the Company’s

mineral property interests; changes in project parameters as plans continue to be refined; current economic conditions; future

prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits;

failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success

of exploration activities generally; delays in permitting; possible claims against the Company; labour disputes and other risks

of the mining industry; delays in obtaining governmental approvals, the completion of exploration as well as those factors

discussed in the Annual Information Form of the Company dated March 28, 2024 in the section entitled "Risk Factors", under

Liberty Gold’s SEDAR+ profile at www.sedarplus.ca.

Although Liberty Gold has attempted to identify important factors that could cause actual actions, events or results to diffe r

materially from those described in forward-looking information, there may be other factors that cause actions, events or results

not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as

actual results and future events could differ materially from those anticipated in such statements. Liberty Gold disclaims an y

intention or obligation to update or revise any forward -looking information, whether as a result of new information, future

events or otherwise.