Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LGC.V ·

Lavras Gold Drills 204 metres Grading 1.0 g/t gold starting at a drill hole depth of 31 metres at its Fazenda do Posto Discovery, LDS Project in Southern Brazil Hole 23FP006 includes 65 metres at 1.9 g/t gold and including 10 metres at 3.0 g/t gold

Drill Results

Lavras Gold Drills 204 metres Grading 1.0 g/t gold starting at a drill hole depth

of 31 metres at its Fazenda do Posto Discovery, LDS Project in Southern Brazil

Hole 23FP006 includes 65 metres at 1.9 g/t gold and including 10 metres at 3.0 g/t gold

• Hole 23FP006, a scissor hole that cuts across discovery hole 23FP002, confirms the lateral continuity of gold

mineralization for about 180 metres in a northeast direction and starting at a drill hole depth of 31 metres.

• The vertical extent of gold mineralization at the Fazenda do Posto discovery has been traced for 330 metres.

• Vertical Hole 23FP003 drilled 58 metres grading 1.0 g/t gold starting at a drillhole depth of 80 metres within a larger

gold mineralized interval of 214 metres.

TORONTO, Nov. 27, 2023 -- Lavras Gold Corp. (TSX-V: LGC, OTCQX: LGCFF) reports that follow up drilling at the Fazenda

do Posto discovery on the Company’s LDS Project in southern Brazil has validated the discovery reported in August 2023

(Lavras Gold press release August 29, 2023). The discovery has been confirmed in terms of gold grades, widths and continuity

and remains open in several directions to resource expansion.

The highlight in this press release is scissor hole 23FP006 which returned assay results with continuous mineralization of 230

metres grading 0.9 g/t gold starting at 31 metres and including:

• 204 metres grading 1.0 g/t gold from 31 metres including:

◦ 65 metres grading 1.9 g/t gold from 149 metres; and including

◦ 10 metres grading 3.0 g/t gold from 154 metres.

The Fazenda do Posto discovery is located roughly 150 metres west of the Lavras Gold Butiá Gold Deposit, which has an NI

43-101 gold resource (* footnote below) of approximately 500,000 ounces and is open to expansion.

Drill hole 23FP006, reported in this press release, tested the northeastern extension of Fazenda do Posto and was drilled

southwest on a 200-degree azimuth and a dip of 060 degrees. The hole was collared approximately 210 metres northeast of

23FP002 – the discovery hole announced on August 29, 2023. Continuous gold mineralization was encountered in 23FP006

starting at a drill hole depth of 31 metres (vertical depth of about 27 metres) for 230 metres. Table 1 tabulates the metre-by-

metre assay results.

“We are very pleased to validate the Fazenda do Posto gold discovery with this scissor hole, which cross cuts the earlier hole

that returned 340 m at 1.1 g/t gold,” commented Lavras Gold President & CEO Michael Durose. “While it is still early in the

drilling program, we are delighted to have intercepted another very long and continuous zone of gold mineralization starting at a

shallow depth and running for over 200 metres. This is a unique bulk tonnage near-surface gold system characterized by

remarkably continuous gold mineralization within an episyenite host rock. A higher-grade core of gold mineralization is

beginning to develop based on the limited drilling we have completed so far. Drilling is ongoing and we look forward to

additional drill results as we begin to unravel this new gold discovery.”

This discovery at Fazenda do Posto is ideally located adjacent to the 500,000 ounce Butiá gold deposit that outcrops at

surface, pointing to the development of a critical mass of gold mineralization in this area. These new results continue to move

Lavras Gold closer to its objective of developing an economically feasible bulk tonnage open pit gold mine.

Despite record rainfalls in the region that have hampered access to drilling sites and caused delays in the drilling program, the

Lavras team is fast-tracking the process of defining the geometry and grade distribution of this important new discovery. Two

drill rigs are working in this target area and have completed over 3,000 metres of drilling in 14 holes since making the discovery

at Fazenda do Posto. Assay results will be released in meaningful batches following interpretation.

[* Footnote: Butiá hosts an NI 43-101 compliant near-surface gold resource of about 500,000 ounces, as detailed in the NI 43-

101 Technical Report Mineral Resource for Butiá Gold Prospect dated and effective January 25, 2022. The report was

prepared by VMG Consultoria e Soluções Ltda. for Lavras Gold Corp. and is available on the Company’s website and

www.sedar.com under Lavras Gold’s issuer profile.]

Discussion of drilling results

The Fazenda do Posto discovery is located along the western edge of the Lavras do Sul intrusive complex approximately 4.7

kilometres southwest of the town of Lavras do Sul (Figure 1). The discovery is in an area of recessive topography about 150

metres west of the Butiá Gold Deposit.

Follow-up Drilling Confirms Discovery at Fazenda do Posto

Assay results have been received for four drill holes that drilled a total of 1,520 metres at the Fazenda do Posto discovery. A

summary of these results is shown in Table 2. This also includes results from hole 23FP002 – the discovery hole that was

released on August 29, 2023.

A plan (aerial) view showing the location of all drill holes is shown in Figure 2. A cross-section facing west is shown in Figure

3.

Key highlights are as follows:

• Three drill holes – FP002, FP003 and FP006 have returned significant gold assay results displaying continuous gold

mineralization over very long intervals. The gold mineralization typically occurs within a brick-red coloured episyenite.

The gold is usually associated with fine grained disseminated pyrite and/or arsenian pyrite and usually occurs with iron-

rich dark green to black chlorite. Grey-white carbonate vesicles are typically associated with the gold mineralized zone.

Photos showing examples of mineralized episyenite are shown in Figure 4, Figure 5 and Figure 6.

• Gold mineralization has been traced over a northeast-southwest extent of about 180 metres, and a vertical distance of

330 metres. Gold mineralization starts at a vertical depth of about 26 metres in the northeast area, as defined by drill

hole 23FP006, and approximately 100 metres depth as defined by drill hole 23FP002.

• A higher-grade core of mineralization appears to be developing in the centre of the deposit, flanked by lower to

moderate gold grades along the margins.

Highlights of drilling are detailed below and summarized in Table 2.

Drillhole 23FP001 was collared along the southeast edge of Fazenda do Posto with a drill hole azimuth of north 020 degrees

and dip of 60 degrees. The hole returned narrow modest gold values and is interpreted to be on the eastern edge of the

mineralized block of Fazenda do Posto close to a northeast trending fault. This hole was drilled primarily in perthitic granite,

with a minor interval of mineralized episyenite. The hole appears to have stopped short of the main episyenite target interpreted

to occur to the northeast of the end of the hole.

Drill hole 23FP002 (previously released discovery hole) was collared in the southwestern portion of the target area with an

azimuth of north 020 and an inclined angle of 60 degrees. The highlights of drill hole 23FP002 are 340 metres grading 1.1 g/t

gold from 117 metres including:

• 160 metres grading 1.8 g/t gold from 199 metres including

◦ 27 metres grading 2.1 g/t gold from 208 metres

◦ 68 metres grading 2.1 g/t gold from 293 metres

This hole confirms gold mineralization to a vertical depth of about 390 metres.

Further details of this hole can be found in the Lavras Gold press release dated August 29, 2023.

Drillhole 23FP003 was collared 95 metres northeast of 23FP002 and drilled vertically. The hole encountered albitized

Fazenda do Posto granodiorite and then intersected a lamprophyre dike at 3 metres. This was followed by altered granodiorite

and then a small interval of mineralized episyenite at 24 metres. This was followed by another interval of altered granodiorite

until about 87.0 metres. Strongly mineralized episyenite was encountered at a drillhole depth of 87.0 metres (75 metres

vertical depth) continuously with intervals of mineralized perthitic granite to a depth of 294 metres (see Figure 4). Highlights of

gold mineralization include:

• 214 metres grading 0.50 g/t gold from 87 metres including

◦ 140 metres grading 0.7 g/t gold from 87 metres including

◾ 58 metres grading 1.0 g/t gold from 87 metres including

• 39 metres grading 1.2 g/t gold from 106 metres

Significantly, when intervals of less than 0.25 g/t gold within the mineralized envelope are removed, the remaining mineralized

interval of hole 23FP003 returns 0.9 g/t gold over 105 meters.

23FP004 was collared 130 metres northwest of 23FP002. The hole missed the target as the azimuth of the hole was oriented

200 degrees and pointed away from the target. However, hydrothermal alteration in the form of albite and chlorite was observed

throughout the hole suggesting the rocks have good potential for finding mineralization at depth.

23FP006 was collared 210 metres northeast of 23FP002. This hole is a scissor hole that was drilled southwest on a 200-

degree azimuth and a dip of 60 degrees. The purpose of the hole was to determine the depth and continuity of gold

mineralization along the northeastern portion of the target above the trace of hole 23FP002. As highlighted in the cross section

in Figure 3, the zone of gold mineralization starts at 31 metres down the drillhole (about 27 metres vertically below surface).

Significant hydrothermal alteration in the form of albite alteration occurs within cover rock above the zone of gold

mineralization.

The hole returned assay results with continuous mineralization of 230 metres grading 0.9 g/t gold starting at 31 metres

and including:

• 204 metres grading 1.0 g/t gold from 31 metres including:

◦ 65 metres grading 1.9 g/t gold from 149 metres; and including

• 10 metres grading 3.0 g/t gold from 154 metres.

Significantly, when intervals of less than 0.25 g/t gold within the mineralized envelope are removed, the remaining mineralized

interval of hole 23FP006 returns 1.2 g/t gold over 162.9 meters .

Table 1 tabulates the assay results for the mineralized interval of drill hole 23FP006. Sampling was completed on 1 metre

intervals for the entire length of the drill hole. Three 50 gram aliquots were assayed for each 1 metre sample, and the average

grade of the three aliquots was used to derive the final gold grade.

Next steps at Fazenda do Posto and Butiá

Indications are that a significant gold mineral system is developing at the Fazenda do Posto gold discovery and the adjacent

Butiá Gold Deposit.

Two drill rigs are on site testing these areas.

One near-term objective is to define the geometry and gold grade distribution of the Fazenda do Posto discovery and look for

more blind discoveries. A second near-term objective is to test for extensions to the mineralized footprint of the Butiá Gold

Deposit.

The medium-term goal is to de-risk the Fazenda do Posto discovery and Butiá Gold Deposit such that a preliminary economic

study defining the general scope of a gold mining project can be prepared.

Regional exploration is on-going, with the goal of defining new exploration targets on the very prospective 22,000-hectare LDS

Project.

OVERALL LDS EXPLORATION PROGRAM MARKED BY EXCEPTIONAL SUCCESS

In addition to these positive developments, Lavras Gold has had exceptional exploration success since going public in April

2022. A regional drone magnetic survey has been completed, and regional soil geochemistry programs are on-going. The

Caneleira Gold Discovery has been reinterpreted, and new gold mineral systems have been found at Zeca Souza, Galvao,

Matilde, Matilde Extension, and Vila Marieta. Although Butiá and Fazendo do Posto are developing into the centre of gravity at

LDS, the exploration upside on the property is very significant and on-going strategies are in place to continue exploring for

and testing new targets.

Qualified person

Michael Durose, Lavras Gold’s President and CEO, is a qualified person as defined by NI 43-101. He has reviewed and

approved the scientific and technical information contained in this release.

Quality assurance and quality control

For the Fazenda do Posto discovery, sample handling, preparation, and analysis are monitored through the implementation of

formal chain-of-custody procedures and quality assurance/quality control programs designed to follow industry best practices.

All drill hole samples in this drilling program consist of split NQ diamond drill core.

Drill core is logged and sampled in a secure facility located in Lavras do Sul, Rio Grande do Sul State, Brazil. Drill core

samples for gold assay are cut in half using a diamond saw and submitted to ALS Laboratories Inc. in Goiania, Goiás State,

Brazil for preparation by crushing to 85% passing 1.0 mm, riffle splitting to obtain 500 g aliquots, and pulverizing to 85%

passing 75 microns.

Pulps are shipped to ALS Laboratories Inc. in Lima, Peru and analyzed by a 50g fire assay and AAS finish. Three 50g aliquots

are taken for samples in the mineralized zone and one aliquot is taken in fresh rocks. The average grade of the three aliquots

is used to determine the final grade of the mineralized sample.

Certified standards, non-certified blanks and field duplicates are inserted into the sample    stream at regular intervals, so that

QA/QC accounted for about 10% of the total samples. Results are routinely evaluated for accuracy, precision, and

contamination.

Lavras Gold has been targeting larger intersections of greater than 0.25 g/t gold. Intersections that are lower than this

threshold may provide exploration insight and may therefore be disclosed.

About Lavras Gold

Lavras Gold Corp. (TSXV: LGC, OTCQX: LGCFF) is a Canadian exploration company focused on realizing the potential of a

multi-million-ounce gold district in southern Brazil. Its Lavras do Sul Project is located in Rio Grande do Sul State and is

primarily an intrusive hosted gold system of possible alkaline affinity. More than 24 gold prospects centred on historic gold

workings have been identified on the property, which spans more than 22,000 hectares. Follow Lavras Gold on

www.lavrasgold.com, as well as on LinkedIn, Twitter, and YouTube.

Contact information

Michael Durose , President & CEO, or Naomi Nemeth , Vice President, Investor Relations

+1-289-624-1377 | [email protected]

DISCLAIMER AND FORWARD-LOOKING INFORMATION

Neither the TSX Venture Exchange nor its Regulation Services Provider (as defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of the content of this news release.

This news release contains certain “forward-looking information” within the meaning of applicable securities laws. Forward-

looking information is frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”,

“estimate”, “may”, “will”, “would”, “potential”, “proposed” and other similar words, or statements that certain events or

conditions “may” or “will” occur. These statements, including those on planned exploration activities and goals, are only

objectives and predictions. Forward-looking information is based on the opinions and estimates of management at the date the

information is provided and is subject to a variety of risks and uncertainties and other factors that could cause actual events or

results to differ materially from those projected in the forward-looking information, including the risks and factors that generally

affect exploration and the uncertainty of exploration results. For a description of the risks and uncertainties facing the

Company and its business, refer to the Company’s Management’s Discussion and Analysis recently filed under the

Company’s profile on www.sedar.com. The Company undertakes no obligation to update forward-looking information if

circumstances or management’s estimates or opinions should change, unless required by law. The reader is cautioned not to

place undue reliance on forward-looking information.

FIGURE 1

Location of the Fazenda do Posto discovery relative to Butiá Gold Deposit, as well as the advanced gold discoveries at the

LDS Project.

FIGURE 2

Fazenda do Posto Drill holes -Plan View Showing location of Drill Holes 23FP001, 23FP002, 23FP003, 23FP004 and

23FP006.

FIGURE 3

Cross section of Fazenda do Posto Drilling looking west. Hole 23FP002 returned 340 metres grading 1.1 grams per tonne gold

from 117 metres. Hole 23FP006 was collared 210 metres northeast of hole 23FP002 and returned 230 metres grading 0.9

grams per tonne gold from 31 metres and including 65 metres grading 1.9 grams per tonne gold. 23FP003 returned 108 metres

grading 0.8 grams per tonne gold from 87 metres. Salmon colour represents the Fazenda do Posto granodiorite, yellow is

episyenite, pink is perthitic granite. Note scale at bottom of hole. 1 ppm gold = 1 gram per tonne

FIGURE 4

Typical example of albitized and potassic altered mineralized episyenite from drill hole 23FP003. The rock consists of 95-96%

brick red to whitish red potassium feldspar and albite, 1% black to dark green Fe-rich chlorite, 1-2% pyrite+- arsenian pyrite

and 1% white to gray carbonate. This sample is from drill hole 23FP003 from 123 to 124 metres and grades 2.873 g/t gold.

FIGURE 5

Typical example of gold mineralization in episyenite from drill hole 23FP006. The rock consists of 95% brick red potassium

feldspar and albite, 2-3% black to dark green iron-rich chlorite, 1-2% grey and white carbonate vesicles, and 1-3%

disseminated pyrite and arsenian pyrite. This example is from drill hole 23FP006 from 120 to 121 metres. This interval grades

1.405 g/t gold. The brick red colouration in the feldspar is from iron and barium. Note that the feldspar grain boundaries are sub

-rounded to sub-angular reflecting pervasive metasomatic alteration likely from alkaline fluids.

FIGURE 6

High-grade example of gold mineralization in episyenite from drill hole 23FP006. The rock consists of 95% brick red potassium

feldspar and whitish pink albite, 1-2% black to dark green iron-rich chlorite, 1-2% grey and white carbonate vesicles, and 3-4%

disseminated to network textured pyrite and arsenian pyrite. This example is from drill hole 23FP006 from 160 to 161 metres.

This interval grades 8.053 g/t gold.

TABLE 1

Summary table of metre-by-metre drilling assay results from drill hole 23FP006 on Fazenda do Posto target.

Hole

Azimuth

(degrees)

Dip

(degrees)

End of hole

(metres)

From

(metres)

To

(metres)

Gold interval

(metres)

Gold grade

(g/t) Lithology

23FP006 200 -60 299.83 31.1 32.0 0.9 0.31 Episyenite

        33.0 35.0 2.0 0.14 Episyenite

        35.0 37.0 2.0 0.11 Episyenite

        37.0 39.0 2.0 0.35 Episyenite

        39.0 41.0 2.0 0.02 Episyenite

        41.0 43.0 2.0 0.01 Episyenite

        43.0 45.0 2.0 0.01 Episyenite

        45.0 47.0 2.0 0.02 Episyenite

        47.0 48.0 1.0 0.32 Episyenite

        48.0 49.0 1.0 0.55 Episyenite

        49.0 50.4 1.4 0.01 Episyenite

        50.4 51.7 1.3 0.01 Episyenite

        51.7 53.0 1.3 0.01 Episyenite

        53.0 54.0 1.0 0.01 Episyenite

        54.0 55.0 1.0 0.34 Episyenite

        55.0 56.0 1.0 0.74 Episyenite

        56.0 57.0 1.0 0.41 Episyenite

        57.0 58.0 1.0 0.50 Episyenite

        58.0 59.0 1.0 0.62 Episyenite

        59.0 60.0 1.0 0.65 Episyenite

        60.0 61.0 1.0 0.50 Episyenite

        61.0 62.0 1.0 0.35 Episyenite

        62.0 63.0 1.0 0.30 Episyenite

        63.0 64.0 1.0 0.43 Episyenite

        64.0 65.0 1.0 0.24 Episyenite

        65.0 66.0 1.0 0.57 Episyenite

        66.0 67.0 1.0 0.42 Episyenite

        67.0 68.0 1.0 0.16 Episyenite

        68.0 69.0 1.0 0.47 Episyenite

        69.0 70.0 1.0 0.41 Episyenite

        70.0 71.0 1.0 0.26 Episyenite

        71.0 72.0 1.0 0.40 Episyenite

        72.0 73.0 1.0 0.45 Episyenite

        73.0 74.0 1.0 0.27 Episyenite

        74.0 75.0 1.0 0.52 Episyenite

        75.0 76.0 1.0 0.44 Episyenite

        76.0 77.0 1.0 0.92 Episyenite

        77.0 78.0 1.0 0.70 Perthitic granite

        78.0 79.0 1.0 0.42 Episyenite

        79.0 80.0 1.0 0.34 Episyenite

        80.0 81.0 1.0 0.50 Episyenite

        81.0 82.0 1.0 0.68 Episyenite

        82.0 83.0 1.0 1.04 Episyenite

        83.0 84.0 1.0 0.59 Episyenite

        84.0 85.0 1.0 0.87 Episyenite

        85.0 86.0 1.0 0.92 Episyenite

        86.0 87.0 1.0 1.62 Episyenite

        87.0 88.0 1.0 1.21 Episyenite

        88.0 89.0 1.0 0.71 Episyenite

        89.0 90.0 1.0 0.45 Episyenite

        90.0 91.0 1.0 0.89 Episyenite

        91.0 92.0 1.0 0.59 Episyenite

        92.0 93.0 1.0 1.37 Episyenite

        93.0 94.0 1.0 1.81 Episyenite

        94.0 95.0 1.0 1.33 Episyenite

        95.0 96.0 1.0 0.50 Episyenite

        96.0 97.0 1.0 1.72 Episyenite

        97.0 98.0 1.0 0.95 Episyenie

        98.0 99.0 1.0 1.12 Episyenite

        99.0 100.0 1.0 1.09 Episyenite

        100.0 101.0 1.0 0.94 Episyenite

        101.0 102.0 1.0 0.67 Episyenite

        102.0 103.0 1.0 0.92 Episyenite

        103.0 104.0 1.0 0.73 Episyenite

        104.0 105.0 1.0 0.83 Episyenite

        105.0 106.0 1.0 1.13 Episyenite

        106.0 107.0 1.0 0.82 Episyenite

        107.0 108.0 1.0 0.54 Episyenite

        108.0 109.0 1.0 0.49 Episyenite

        109.0 110.0 1.0 1.06 Episyenite

        110.0 111.0 1.0 0.73 Episyenite

        111.0 112.0 1.0 1.01 Episyenite

        112.0 113.0 1.0 0.91 Episyenite

        113.0 114.0 1.0 0.36 Episyenite

        114.0 115.0 1.0 0.29 Episyenite

        115.0 116.0 1.0 0.11 Episyenite

        116.0 117.0 1.0 0.17 Episyenite

        117.0 118.0 1.0 0.42 Episyenite

        118.0 119.0 1.0 0.70 Episyenite

        119.0 120.0 1.0 0.53 Episyenite

        120.0 121.0 1.0 1.41 Episyenite

        121.0 122.0 1.0 0.66 Episyenite

        122.0 123.0 1.0 0.50 Episyenite

        123.0 124.0 1.0 0.59 Episyenite

        124.0 125.0 1.0 1.38 Episyenite

        125.0 126.0 1.0 0.02 Episyenite