Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LGC.V ·

Lavras Gold discovers new surface gold at LDS Project in Brazil CORRECTION: The news release was refiled on SEDAR to correct a drillhole number in Table 2.

Exploration Programs Regulatory & Compliance

News release 2023-5 (amended)

News release 2023-5: Lavras Gold discovers new surface gold at LDS Project in Brazil (May 2, 2023) 1

Lavras Gold discovers new surface gold at LDS Project in Brazil

CORRECTION: The news release was refiled on SEDAR to correct a drillhole number in Table 2.

TORONTO, ONTARIO – May 2, 2023 – Assay results from maiden drilling on the Vila

Marieta claim block suggest that Lavras Gold Corp. (TSXV: LGC, OTCQB: LGCFF) has

identified the southwest surface extension of its Cerrito Gold Deposit. Vila Marieta

and Cerrito are among the 23 known gold targets on the company’s LDS Project in

southern Brazil.

The assay results feature significant gold grades that begin at surface and long

intervals. For example, hole 22VM001 returned:

• significant surface mineralization of 28.00 metres at 1.30 g/t gold from 0.00 metres

including

o 4.00 metres at 2.42 g/t gold from 7.00 metres

o 5.00 metres at 2.49 g/t gold from 16.00 metres.

• long interval of 53.00 metres at 0.68 g/t gold from 139.00 metres including

o 7.72 metres grading 1.04 g/t gold from 148.00 metres.

At 1.30 g/t gold, the average gold grade from the surface mineralization is 85% higher

than the average grade of Cerrito, which has NI 43-101 resources of approximately

500,000 ounces at an average grade of 0.7 g/t gold. So, these results demonstrate the

potential for optimizing and enhancing the future mine plan for the deposit.

“This is a significant discovery of new gold mineralization at LDS,” said Michael

Durose, President and CEO. “We have always believed that we could improve the

overall quality of Cerrito, and these results potentially show that.”

Figure 1 locates Vila Marieta, the Butiá and Cerrito gold deposits, and four advanced

gold discoveries at the LDS Project.

Discussion of results

Two holes totalling 521 metres were drilled on the Vila Marieta claim block, which is

immediately south of the Cerrito Gold Deposit. Cerrito has an NI 43-101 compliant

mineral resource estimate, as follows:

TABLE 1: MINERAL RESOURCE ESTIMATE FOR CERRITO GOLD DEPOSIT

Category Tonnes

Gold grade

(g/t)

Contained gold

(ounces)

Indicated 8,249,225 0.70 186,870

Inferred 13,157,478 0.69 291,605

Notes

• Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty

that all or any part of the mineral resources estimated will be converted into mineral reserves.

• Assumes a gold cut-off grade of 0.3 g/t. High grade samples were cut to a gold grade of 3.07 g/t.

• This estimate should be read in conjunction with the full report NI 43-101 Technical Report for the Cerrito Gold

Prospect, Rio Grande do Sul, Brasil dated and effective May 31, 2022. It is authored by Volodymyr Myadzel, MAIG, and

Frank Richard Baker, MIMMM, MAusIMM, and is available on www.sedar.com under Lavras Gold’s issuer profile.

News release 2023-5: Lavras Gold discovers new surface gold at LDS Project in Brazil (May 2, 2023) 2

The higher-grade surface gold mineralization from drillhole 22VM001 is interpreted to

be the southwestern extension of Cerrito (see Figure 2). Table 2 shows all the

important assay results from the two holes completed at Vila Marieta.

Highlights from 22VM001 are:

• 28.00 metres at 1.30 g/t gold from 0.00 metres, including:

o 4.00 metres at 2.42 g/t gold from 7.00 metres

o 5.00 metres at 2.49 g/t gold from 16.00 metres.

• 53.00 metres at 0.68 g/t gold from 139.00 metres, including

several higher-grade intercepts:

o 7.72 metres at 1.04 g/t gold from 148.0 metres

o 3.00 metres at 1.08 g/t gold from 170.0 metres

o 4.00 metres at 2.02 g/t gold from 180.0 metres

o 3.77 metres at 1.00 g/t gold from 188.23 metres.

Highlights from 22VM002 are:

• 27.00 metres at 0.47 g/t gold from 0.00 metres, including:

o 11.00 metres grading 0.71 g/t gold from 0.00 metres.

These two holes confirm gold mineralization starts at surface and is interpreted to

dip to the northwest (see Figure 3). Gold mineralization is associated with 1 to 2 per

cent very fine grain disseminated pyrite hosted within pervasively altered

granodiorite. Alteration includes sericite, chlorite and silica cross-cut by mm-scale

quartz-carbonate veinlets. Pinkish-orange potassic alteration is observed to develop

at depth (see figures 4 and 5).

It is significant that the gold grade returned from 22VM001, averaging 1.30 g/t gold

and beginning at surface to 28.00 metres, is 85% higher than the average grade of

the Cerrito Gold Deposit. This has important positive implications for optimizing

future potential open pit mining scenarios since higher-grade surface mineralized

material would ideally be mined first.

Equally important is that gold mineralization found at Vila Marieta remains open to

the south and southeast as defined by surface gold in soil anomalism (see Figure 6).

Next steps

Exploration continues at the LDS Project. Historical information is being

reinterpreted, a regional soil sampling program is on-going, and a 16,000-metre

drilling program with two drills on site continues to probe priority targets. Future

exploration results will be released after being reviewed and interpreted by the

geological team.

Qualified person

Michael Durose, Lavras Gold’s President and CEO, is a qualified person as defined by

NI 43-101. He has reviewed and approved the scientific and technical information

contained in this release.

News release 2023-5: Lavras Gold discovers new surface gold at LDS Project in Brazil (May 2, 2023) 3

Quality assurance and quality control

Sample handling, preparation, and analysis are monitored through the

implementation of formal chain-of-custody procedures and quality assurance/quality

control programs designed to follow industry best practices.

All drillhole samples in this drilling program consist of split NQ diamond drill core.

Drill core is logged and sampled in a secure facility located in Lavras do Sul, Rio

Grande do Sul State, Brazil. Drill core samples for gold assay are cut in half using a

diamond saw and submitted to ALS Laboratories Inc. in Goiania, Goiás State, Brazil for

preparation by crushing to 70% passing 2.0 mm, riffle splitting to obtain

500 g aliquots, and pulverizing to 85% passing 75 microns.

Pulps are shipped to ALS Laboratories in Lima, Peru and analyzed by a 30 g fire assay

and AAS finish. For assays above 10 ppm gold, a cut of the original pulp is re-assayed

with a gravimetric finish.

Certified standards, non-certified blanks and field duplicates are inserted into the

sample stream at regular intervals, so that QA/QC accounted for about 10% of the

total samples. Results are routinely evaluated for accuracy, precision, and

contamination.

About Lavras Gold

Lavras Gold (TSXV: LGC, OTCQB: LGCFF) is a Canadian exploration company focused

on realizing the potential of a multi-million-ounce gold district in southern Brazil. Its

Lavras do Sul Project is in Rio Grande do Sul State and primarily an intrusive hosted

gold system of possible alkaline affinity. More than 23 gold prospects centred on

historic gold workings have been identified on the property, which spans more than

22,000 hectares.

Follow Lavras Gold on www.lavrasgold.com, as well as on LinkedIn, Twitter, and

YouTube.

Contact information

Michael Durose, President & CEO, or Annemarie Brissenden, Investor Relations

+1-416-844-6284 | [email protected]

www.lavrasgold.com

DISCLAIMER AND FORWARD-LOOKING INFORMATION

Neither the TSX Venture Exchange nor its Regulation Services Provider (as defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of the content of this news release.

This news release contains certain “forward-looking information” within the meaning of applicable securities laws. Forward-

looking information is frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”,

“estimate”, “may”, “will”, “would”, “potential”, “proposed” and other similar words, or statements that certain events or conditions

“may” or “will” occur. These statements, including those on planned exploration activities and goals, are only objectives and

predictions. Forward-looking information is based on the opinions and estimates of management at the date the information is

provided, and is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ

materially from those projected in the forward-looking information, including the risks and factors that generally affect

exploration and the uncertainty of exploration results. For a description of the risks and uncertainties facing the Company and its

business, refer to the Company’s Management’s Discussion and Analysis recently filed under the Company’s profile on

www.sedar.com. The Company undertakes no obligation to update forward-looking information if circumstances or

management’s estimates or opinions should change, unless required by law. The reader is cautioned not to place undue reliance

on forward-looking information

News release 2023-5: Lavras Gold discovers new surface gold at LDS Project in Brazil (May 2, 2023) 4

FIGURE 1

Location of the gold deposits, Butiá and Cerrito, as well as the advanced gold discoveries, including

Vila Marieta, at the LDS Project.

FIGURE 2

Location of Vila Marieta drillholes and implicit 0.25 g/t gold grade shell (green) relative to

Cerrito Gold Deposit (yellow).

News release 2023-5: Lavras Gold discovers new surface gold at LDS Project in Brazil (May 2, 2023) 5

FIGURE 3

East-Facing Cross-Section of Vila Marieta drillholes relative to Vila Marieta 0.25 g/t gold implicit grade shell

(green) and to Cerrito Gold Deposit grade shell (yellow).

FIGURE 4

Vila Marieta drillhole 22VM001: musky green hydrothermally altered granodiorite (sericite and silica)

hosting very fine grain disseminated pyrite (yellow circle) and millimetre-scale cross-cutting quartz

carbonate veinlets at 22.00 metres. Width of view is approximately 3 centimetres.

News release 2023-5: Lavras Gold discovers new surface gold at LDS Project in Brazil (May 2, 2023) 6

FIGURE 5

Vila Marieta drillhole 22VM001: musky green and pink hydrothermally altered granodiorite (sericite, silica,

potassic feldspar) hosting very fine grain disseminated pyrite and mm-scale cross-cutting quartz-chlorite

veinlets at 173.50 metres. Width of view is approximately 3 centimetres.

FIGURE 6

Vila Marieta drillholes and implicit 0.25 g/t gold grade shell (green) relative to Cerrito Gold

Deposit (yellow) and gold in soil anomalies (various bright colours).

News release 2023-5: Lavras Gold discovers new surface gold at LDS Project in Brazil (May 2, 2023) 7

TABLE 2: SUMMARY OF ASSAY RESULTS FROM VILA MARIETA

Hole

Azimuth

(degrees)

Dip

(degrees)

End of hole

(metres)

From

(metres)

To

(metres)

Interval

(metres)

Gold grade

(g/t)

22VM001 180 -60.0 241.99 0.00 28.00 28.00 1.30

including 4.00 21.00 17.00 1.89

including 7.00 11.00 4.00 2.42

including 16.00 21.00 5.00 2.49

45.00 46.00 1.00 0.57

48.00 51.00 3.00 0.62

including 50.00 51.00 1.00 1.24

56.00 57.00 1.00 1.36

66.00 69.00 3.00 0.31

including 56.00 57.00 1.00 0.55

71.00 77.00 6.00 0.44

including 71.00 72.00 1.00 0.88

76.00 77.00 1.00 0.80

80.00 81.00 1.00 0.38

85.00 86.00 1.00 0.34

123.00 126.00 3.00 0.46

including 125.00 126.00 1.00 0.84

137.00 138.00 1.00 0.25

139.00 192.00 53.00 0.68

including 143.00 144.00 1.00 1.39

including 147.67 155.72 8.05 1.04

including 147.67 149.00 1.33 1.24

including 149.00 150.00 1.00 1.30

including 151.00 152.00 1.00 1.04

including 154.24 155.00 0.76 1.80

including 155.00 155.72 0.72 1.47

including 170.00 173.00 3.00 1.08

including 172.00 173.00 1.00 1.53

including 180.00 184.00 4.00 2.02

including 181.00 182.00 1.00 4.67

including 188.23 192.00 3.77 1.00

including 188.23 189.00 0.77 1.39

including 190.00 191.00 1.00 1.24

203.00 205.00 2.00 0.62

219.00 227.00 8.00 0.47

including 223.73 227.00 3.27 0.91

including 225.00 226.00 1.00 1.27

231.00 232.00 1.00 0.43

236.00 240.00 4.00 0.55

22VM002 180 -60.0 279.04 0.00 27.00 27.00 0.47

including 0.00 11.00 11.00 0.71

including 10.00 11.00 1.00 1.65

35.00 36.00 1.00 0.41

84.00 85.00 1.00 1.28

129.00 131.00 2.00 0.42