Lahontan GOLD Announces Positive Preliminary Economic Assessment FOR Santa Fe

Economic Studies

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

NEWS RELEASE TSX.V LG, OTCQB LGCXF

LAHONTAN GOLD ANNOUNCES POSITIVE PRELIMINARY ECONOMIC

ASSESSMENT FOR SANTA FE

Toronto Ontario, December 11, 2024 – Lahontan Gold Corp. (TSXV:LG, OTCQB:LGCXF) (the

"Company" or "Lahontan") is pleased to announce results from a positive Preliminary Economic

Assessment ("PEA") on its flagship Santa Fe Mine gold-silver project located in Nevada’s prolific Walker

Lane Trend. The PEA was prepared by Kappes, Cassiday & Associates ("KCA") of Reno, Nevada with

mine planning and production scheduling contributions from RESPEC Company LLC (“Respec”), Reno,

Nevada and mineral resource estimation by Equity Exploration Consultants Ltd. (“Equity”), of Vancouver,

British Columbia, in accordance with Canadian National Instrument 43-101, Standards of Disclosure for

Mineral Projects ("NI 43-101").

PEA Highlights:

• Pre-tax Net Present Value at a 5% discount rate (“NPV5”) of US$265.1 M with a 41.0% IRR

with an After-tax NPV5 of US$200.0 M with a 34.2% IRR utilizing a $2,705/oz gold price and

a $32.60/oz silver price (“spot metal prices”) (see spot metal price to base case metal price

comparison in Table 1).

• Total Life-of-Mine (“LOM”) Pre-tax net cash flow of US$373.3 M and After-tax net cash flow

of US$288.9 M over a nine-year project life using spot metal prices.

• Total projected LOM revenue of US$930.8 M over a nine-year project life using spot metal

prices.

• LOM strip ratio of only 1.54 (waste to mineralized material ratio).

• Estimated pre-production capital costs of US$135.1 M including a 20% contingency, with a

payback of 2.9 years using spot metal prices.

Kimberly Ann, Lahontan Gold Corp Executive Chair, CEO, President, and Founder commented: “Lahontan

is very excited about the results of the PEA: a low-capex, highly profitable mining project with a quick

payback certainly bodes well for the future of Lahontan and all stakeholders. There is considerable potential

to expand gold and silver resources, therefore this is just the first step in restarting mining operations at

Santa Fe. With mine permitting well under-way, targeting a 2026 mine ground-breaking, the potential for

the Company to realize the economic outcomes outlined in the PEA is very real, especially given current

trends in gold and silver prices. Continued optimization of the mine plan, resource expansion drilling, and

refining the metallurgical flow sheet are planned for 2025, in parallel with our permitting activities.”

The PEA is preliminary in nature, includes Inferred Mineral Resources that are considered too speculative

geologically to have the economic considerations applied to them that would enable them to be categorized

as Mineral Reserves, and there is no certainty that the PEA will be realized. Mineral Resources that are not

Mineral Reserves do not have demonstrated economic viability. The Company has not defined any Mineral

Reserves at the Santa Fe Mine project.

Economic Sensitivities

Sensitivity of the project economics to metals prices is shown in Table 1, showing the base case metal

prices used for the PEA, as well as a low case, a high case and the spot case.

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

Table 1: Santa Fe Project 2024 PEA Economics

Low Case Base Case High Case Spot Case (1)

Gold Price (US$/oz) 1,800 2,025 2,200 2,705

Silver Price (US$/oz) 21.50 24.20 26.3 32.60

Net Revenue (US$) 618.6 M 696.2 M 756.5 M 930.8 M

Pre-Tax NCF(2) (US$) 65.0 M 141.6 M 201.2 M 373.3 M

Pre-Tax NPV5(3) (US$) 21.7 M 82.2 M 129.2 M 265.1 M

Pre-Tax IRR(4) 8.5% 17.4% 23.9% 41.0%

After-Tax NCF(2) (US$) 47.8 M 107.7 M 154.1 M 288.9 M

After-Tax NPV5(3) (US$) 8.7 M 56.5 M 93.3 M 200.0 M

After-Tax IRR(4) 6.4% 14.0% 19.5% 34.2%

Payback Period(5) (years) 5.1 4.2 3.8 2.9

(1) As of December 10, 2024

(2) NCF means net cash flow

(3) NPV5 refers to net present value at 5% discount rate

(4) IRR means internal rate of return

(5) Pre-production capital, excluding sustaining capital

Capital Costs

Capital costs for the project are summarized in Table 2. Capital costs associated with the mining operation

were estimated by RESPEC and based on mining by contractor. Pre-stripping costs were based on the

operating costs discussed below. Capital costs associated with processing such as crushing, heap leaching

and metal recovery, along with support and infrastructure costs associated with laboratory, water and power

distribution and general site services were estimated by KCA. Reclamation and closure costs of $12.5 M

were estimated by KCA.

Table 2: Project Capital Costs

Pre-Production

(US$ M)

LOM Sustaining

(US$ M)

Mining 2.5 0.8

Processing, Support & Infrastructure 116.0 17.0

Owner’s Costs 5.3 0.0

Initial Fills 0.5 0.0

Working Capital(1) 10.7 0.0

TOTAL(2) 135.1 17.8

(1) Working capital is credited in Year 9

(2) Values are rounded and may not sum perfectly

Operating Costs

Operating costs for the project are summarized in Table 3. Mining operating costs were estimated by

RESPEC and based on estimated anticipated equipment hours and personnel requirements at a 25% markup

for contractor rates. The off-road red-dye diesel fuel price in this estimate was assumed to be $0.74/L. All

other operating costs were estimated by KCA and based on first principles on certain components where

possible, such as reagent and power consumption, along with benchmarking with similar operations for

other components, such as labor, maintenance and discretionary expenses

Table 3: Project Operating Costs

LOM Total

(US$ M)

Per Tonne

Processed ($/t)

Mining 204.2 7.36

Processing 138.7 5.00

Support & Infrastructure 17.3 0.62

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

G&A 35.8 1.29

TOTAL(1) 402.5 14.28

(1) Values are rounded and may not sum perfectly

Mine Production Schedule

The PEA mine production schedule includes mining of leach material and waste for the Santa Fe, Calvada,

Slab, and York deposits. Leach material was assumed to be sent to a centralized crushing plant and then

stacked on a leach pad and the waste material was sent to designed waste rock storage facilities (WRSF) or

used as partial backfill into the Calvada pit.

Because the Santa Fe Mine is a brown-field project, minimal pre-stripping is required to develop sufficient

stockpiles to feed the crusher. The mine production schedule requires 2 months of preproduction which

begins in the Santa Fe deposit. The Calvada deposit is started in year 2 and mined concurrently with Santa

Fe. Calvada mining is followed by mining of Slab and York deposits.

The process schedule was developed with a ramp up of production from year 1 through year 3 to a full 4.56

million tonnes per year. Table 4 shows the process production schedule.

Table 4: Projected Production Summary

Year

Tonnes

Processed

(kt)

Gold

Grade

(g/t)

Silver

Grade

(g/t)

Gold

Produced

(koz)

Silver

Produced

(koz)

Gold

Equivalent

Produced(1)

(koz)

1 3,468 0.47 4.1 30.3 88.1 31.4

2 4,517 0.58 4.6 51.4 168.9 53.4

3 4,563 0.66 3.7 60.2 155.7 62.0

4 4,563 0.70 3.0 60.5 124.2 62.0

5 4,563 0.73 2.5 62.0 93.5 63.1

6 4,563 0.61 2.2 49.9 56.9 50.5

7 1,497 0.58 2.1 20.1 23.1 20.4

8(2) 0 2.3 4.2 2.3

TOTAL(3) 27,731 0.63 3.3 336.7 714.7 345.2

(1) Equivalent gold calculation is based on base case metal prices

(2) Residual leaching production only

(3) Values are rounded and may not sum perfectly

Table 5 shows the key production parameters for the mine and processing units used in the generation of

the production and cash flow profiles.

Table 5: Key Mining and Processing Production Parameters

LOM

Mining

Total Waste Tonnes Mined (Mt) 42.9

Total Processed Tonnes Mined (Mt) 27.7

Total Tonnes Mined (Mt) 70.6

Heap Recovery – Gold

Santa Fe Oxide 71%

Santa Fe Transition 49%

Calvada Oxide 71%

Calvada Transition 45%

Slab Oxide 50%

York Oxide 60%

York Transition 45%

Heap Recovery – Silver

Santa Fe Oxide 30%

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

Santa Fe Transition 30%

Calvada Oxide 13%

Calvada Transition 0%

Slab Oxide 12%

York Oxide 0%

York Transition 0%

Mining and Processing

The mineralized material will be mined by standard open-pit mining methods using a contractor-owned and

operated mining fleet consisting of 92-tonne haul trucks and 11.5-m3 loading units and transported to the

crushing circuit for processing.

Mineralized material from the Santa Fe, Calvada, Slab and York deposits will be processed by conventional

heap leaching methods. The nominal processing rate will be 4.6 million tonnes per annum or 12,500 tonnes

per day. Three-stage crushing of the material to 12.7 mm, will be followed by conveyor stacking on to a

multi-lift heap leach pad. Dilute sodium cyanide solution will be applied to the heap, with the pregnant

gold and silver-bearing solution effluent from the heap being processed in a carbon adsorption-desorption-

recovery (ADR) plant. Gold and silver will be produced in the form of doré bars from the on-site smelting

process.

Mineral Resource Estimation

The mineral resource estimate (“MRE”) was prepared in accordance with the CIM Definition Standards

and Canadian National Instrument NI-43-101. The effective date of the MRE prepared by Equity is October

9, 2024. The MRE is shown in Table 6.

Table 6: Project-wide Resources, Santa Fe Mine, Mineral County, Nevada

(Au Eq. k.oz.)

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

Notes to Table 6:

1. Mineral Resources have an effective date of October 9, 2024. The Mineral Resource Estimate for the Santa Fe Mine was

prepared by Trevor Rabb, P.Geo., of Equity Exploration Consultants Ltd., an independent Qualified Person as defined by NI

43-101.

2. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. Inferred Resources are

considered too speculative geologically to have economic considerations applied to them that would enable them to be classified

as Mineral Reserves. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral

Resource and must not be converted to a Mineral Reserve. It is reasonably expected that most of the Inferred Mineral Resources

could be upgraded to Indicated Mineral Resources with continued exploration.

3. Resources are reported in accordance with NI43-101 Standards of Disclosure for Mineral Projects (BCSC, 2016) and the CIM

Definition Standards for Mineral Resources and Mineral Reserves (CIM, 2014).

4. Mineral Resources were estimated for gold, silver, and gold equivalent (Au Eq) using a combination of ordinary kriging and

inverse distance cubed within grade shell domains.

5. Mineral resources are reported using a cut-off grade of 0.15 g/t Au Eq for oxide resources and 0.60 g/t Au Eq for non-oxide

resources. Au Eq for the purpose of cut-off grade and reporting the Mineral Resources is based on the following assumptions

gold price of US$1,950/oz gold, silver price of US$23.50/oz silver, and oxide gold recoveries ranging from 45% to 79%, oxide

silver recoveries ranging from 10% to 30%, and non-oxide gold and silver recoveries of 71%, mining costs for resource and

waste of US$2.50/t, processing cost (oxide) US$3.49/t, processing cost (non-oxide) US$25/t.

6. An optimized open-pit shell was used to constrain the Mineral Resource and was generated using Lerchs-Grossman algorithm

utilizing the following parameters: gold price of US$1,950/oz gold, silver price of US$23.50/oz silver, and selling costs of

US$29.25/oz gold. Mining costs for resource and waste of US$2.50/t, processing cost (oxide) US$3.49/t, processing cost (non-

oxide) US$25/t, G&A cost US$1.06/t. Royalties for the Slab, York and Calvada deposits are 1.25%, and maximum pit slope

angles of 50 degrees.

7. Totals may not sum due to rounding.

Estimation Approach: Lithology and gold and silver bearing domains were modelled using Leapfrog 2024.

These domains are mainly defined by logged jasperoid and limestone-breccia lithologies and continuity of

gold grades above 0.1 g/t gold. Metallurgical domains for oxide, transition and non-oxide were modelled

based on ratio of cyanide leachable gold assay values to fire assay gold values in addition to drillhole logs

recording abundance of pyrite and oxidation intensity. Transition material represents approximately 35%

of oxide tonnes and comes almost entirely from the Santa Fe deposit. Transition domain material is included

in the oxide resource. Domains representing lithology, weathering and mineralization models were assigned

to a block model with a block size of 5 m x 5 m x 6 m. Average bulk densities representative of the

mineralization and lithology models were assigned to the block model and vary from 2.4 t/m3 to 2.6 t/m3.

Grade capping and outlier restrictions were applied to gold and silver values and interpolation parameters

respectively. Top cut values for gold and silver were evaluated for each domain independently prior to

compositing to 1.52 m lengths that honor domain boundaries. Estimation was completed using Micromine

Origin with Ordinary Kriging (OK) and Inverse Distance cubed (ID3) interpolants. Blocks were classified

in accordance with the 2014 CIM Definition Standards. The nominal drillhole spacing for Indicated Mineral

Resources is 50 m or less. The nominal drillhole spacing for Inferred Mineral Resources is 100 m or less.

Prospects for eventual economic extraction were evaluated by performing pit optimization using Lerchs-

Grossman algorithm with the following parameters: gold price of US$1,950/oz gold, silver price of

US$23.50/oz silver, selling costs of US$29.25/oz gold. Mining costs for resource and waste of US$2.50/t,

processing cost (oxide) US$3.49/t, processing cost (non-oxide) US$25/t, G&A cost US$1.06/t. Royalties

for the Slab, York and Calvada deposits are 1.25%. Maximum pit slope is 50 degrees. Processing recoveries

range from 45% to 79% for oxide, silver recoveries range from 10% to 30% for oxide and non-oxide gold

and silver recoveries are 71%.

More information regarding the Santa Fe Mine project’s MRE update is included in the NI 43-101 Technical

Report titled Santa Fe Project Technical Report with an effective date of October 9, 2024, Report Date:

November 27, 2024*.

Qualified Persons

The qualified persons are Kenji Umeno, P.Eng. of Kappes, Cassiday & Associates; Thomas Dyer, P.E. of

RESPEC; Trevor Rabb, P.Geo. and Darcy Baker, P.Geo. of Equity Exploration Consultants Ltd. each of

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

whom is an independent “Qualified Person” under NI 43-101. A technical report supporting the results

disclosed herein will be published within 45 days. The effective date of the technical report will be

December 10, 2024.

About Lahontan Gold Corp.

Lahontan Gold Corp. is a Canadian mine development and mineral exploration company that holds,

through its US subsidiaries, four top-tier gold and silver exploration properties in the Walker Lane of

mining friendly Nevada. Lahontan’s flagship property, the 26.4km2 Santa Fe Mine project, had past

production of 356,000 ounces of gold and 784,000 ounces of silver between 1988 and 1995 from open pit

mines utilizing heap-leach processing (Nevada Division of Minerals, www.ndomdata.com). The Santa Fe

Mine has a Canadian National Instrument 43-101 compliant Indicated Mineral Resource of 1,539,000 oz

Au Eq (grading 0.99 g/t Au Eq) and an Inferred Mineral Resource of 411,000 oz Au Eq (grading 0.76 g/t

Au Eq), all pit constrained (Au Eq is inclusive of recovery, please see Santa Fe Project Technical Report*).

For more information, please visit our website: www.lahontangoldcorp.com

* Please see the Santa Fe Project Technical Report, Authors: Trevor Rabb, P. Geo, Darcy Baker, PhD, P. Geo., and Kenji Umeno,

P. Eng., Effective Date: October 9, 2024, Report Date: November 27, 2024. The Technical Report is available on the Company’s

website and SEDAR+.

On behalf of the Board of Directors

Kimberly Ann

Founder, CEO, President, and Director

FOR FURTHER INFORMATION, PLEASE CONTACT:

Lahontan Gold Corp.

Kimberly Ann

Founder, Chief Executive Officer, President, Director

Phone: 1-530-414-4400

Email:

[email protected]

Website: www.lahontangoldcorp.com

Cautionary Note Regarding Forward-Looking Statements:

This news release contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking

statements") within the meaning of Canadian and United States securities legislation, including the United States Private

Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, are forward-looking statements.

Forward-Looking statements in this news release relate to, among other things: the Company's strategic plans; the results of the

PEA; the economic potential and merits of the Project; the estimated amount and grade of mineral resources at the Project;

precious metals prices; the PEA representing a viable development option for the Santa Fe Mine project (“the Project”); the

timing and particulars of the development phases as identified in the PEA; estimates with respect to LOM, operating costs,

sustaining capital costs, capex, AISC, cash costs, LOM production, processing plant throughput, NPV and after-tax IRR, payback

period, production capacity and other metrics; the estimated economic returns from the Project; mining methods and extraction

techniques; the exploration potential of the Project and its inclusion in future mining studies.

These forward-looking statements reflect the Company's current views with respect to future events and are necessarily based

upon several assumptions that, while considered reasonable by the Company, are inherently subject to significant operational,

business, economic and regulatory uncertainties and contingencies. These assumptions include, among other things: conditions

in general economic and financial markets; tonnage to be mined and processed; grades and recoveries; prices for silver and

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

gold remaining as estimated; currency exchange rates remaining as estimated; reclamation estimates; reliability of the updated

MRE and the assumptions upon which it is based; future operating costs; prices for energy inputs, labor, materials, supplies and

services (including transportation); the availability of skilled labor and no labor related disruptions at any of the Company's

operations; no unplanned delays or interruptions in scheduled production; performance of available laboratory and other

related services; availability of funds; all necessary permits, licenses and regulatory approvals for operations are received in a

timely manner; the ability to secure and maintain title and ownership to properties and the surface rights necessary for

operations; and the Company's ability to comply with environmental, health and safety laws. The foregoing list of assumptions is

not exhaustive.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release. Except for statements of historical fact, this news

release contains certain "forward-looking information" within the meaning of applicable securities law. Forward-looking

information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate"

and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are

based on the opinions and estimates at the date the statements are made and are subject to a variety of risks and uncertainties and

other factors that could cause actual events or results to differ materially from those anticipated in the forward-looking statements

including, but not limited to delays or uncertainties with regulatory approvals, including that of the TSXV. There are

uncertainties inherent in forward-looking information, including factors beyond the Company’s control. The Company

undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should

change except as required by law. The reader is cautioned not to place undue reliance on forward-looking statements. Additional

information identifying risks and uncertainties that could affect financial results is contained in the Company’s filings with

Canadian securities regulators, which filings are available at www.sedar.com