Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LG.V ·

Lahontan Drills 138.6m Grading 1.06 Gpt Au Eq at Santa Fe

Drill Results

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

NEWS RELEASE TSX.V LG, OTCQB LGCXF

LAHONTAN DRILLS 138.6m GRADING 1.06 GPT Au Eq AT SANTA FE

Toronto, Ontario – August 2 , 2022 – Lahontan Gold Corp. (TSX.V: LG , OTCQB: LG CXF) (the

“Company” or “Lahontan”) is pleased to announce drill results from ten reverse-circulation rotary (“RC”)

drill holes exploring the Santa Fe pit area of the Company’s 19 km2 Santa Fe Project in Nevada’s Walker

Lane. Eight drill holes, totaling 2,614 metres, are the final RC holes from the 2021 drilling campaign. These

drill holes targeted down -dip plus northwest and southeast step outs from known gold and silver

mineralization along the Santa Fe fault. Highlights include:

• SF21-015R and -016R: These two RC drill holes targeted expansion of known mineralization in

the high -wall of the Santa Fe Pit between the Bonanza and Big Horn zones and were collared

approximately 120 metres northwest of SF21 -007R (please see map below). SF21 -015R cut

138.6m grading 1.01 gpt Au and 3.4 gpt Ag (1.06 gpt Au Eq) while SF21-016R intercepted

102.1m grading 0.69 gpt Au and 1.7 gpt Ag (0.71 gpt Au Eq). These drill holes expand potential

resources in this portion of the Santa Fe pit and define the extent of transitional mineralized rock.

Kimberly Ann, CEO, President, Director, and Founder of Lahontan Gold Corp commented: “The Company

is excited to release the final results from our Phase One drilling program. In total, Lahontan drilled 9,410

metres in its 2021 Phase One drilling campaign resulting in the discovery of two new high grade “feeder”

zones, Bonanza and Big Horn, the expansion of the BH high-grade zone, and impressive volumes of good

grade shallow oxide and transition gold and silver mineralization at both the main Santa Fe pit target area

and at the Slab target area (see cross sections of the Santa Fe Pit below). RC drilling has resumed at Slab,

targeting more shallow o xide gold and silver mineralization. We remain on track to deliver o ur maiden

resource estimate in 2022 and take the next steps to advance the Santa Fe Project back into production.”

Cross section through all 2021 Lahontan drill holes in the Santa Fe pit area. The 2021 drilling campaign was extremely successful

in expanding the volume of gold and silver mineralization in areas adjacent to 0.17 gpt grade shell defined by pre vious drilling

(shown in red above). Note how Lahontan drilling has opened-up potential new gold and silver resources, especially in the newly

discovered high-grade zones and deeper portions of the BH zone.

BONANZA

BIG HORN

BH

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

Cross section through RC drill holes SF21-007R, SF21-008R, and SF21-015R through -018R, Santa Fe pit area, Santa Fe Project,

Mineral County, Nevada. These drill holes greatly expand the volume of gold and silver mineralized rock adjacent to the 0.17 gpt

Au grade shell defined by historic drilling (pink outline).

Central Santa Fe Pit Drill Holes: As noted above, RC drill holes, SF21-007R, -008R, -015R through -18R

targeted expanding potential resources in the central portion of the Santa Fe pit by stepping out into the pit

high-wall. While SF21 -008R was lost above the intended target, previously reported drill hole -007R

intercepted what may be the edge of more high -grade mineralization: 1.5m grading 3.50 gpt Au and 61.9

gpt Ag (4.33 gpt Au Eq, 240.8 – 242.3m). Drill holes SF21-015R and -016R successfully expanded the

volume of transition mineralization between the Big Horn and Bonanza high-grade zone (please see cross

sections above). Based on the silver grades, it appears that drill holes SF21 -015R and -016R drilled the

margins of the Big Horn high-grade zone, confirming tonnage potential of this important high-grade target.

Of note, SF21 -007R, -015R and -018R all bottomed in mineralized rock, emphasizing that the Santa Fe

deposit remains open at depth.

South-Southeast Extension of the Santa Fe Pit: RC drill holes SF21-010R through -013R were drilled to

further define the boundaries between transition mineralization and fresh rock south-southeast of the Santa

Fe pit. All four drill holes intercepted significant widths of mineralized material and confirmed suspected

boundaries of the metallurgical domains in this area.

Drill Hole Total Depth

(m) From (m) To (m) Interval

(m) Au (gpt) Ag (gpt) Au Eq

(gpt)

Metallurgical

Domain

SF21-010R 274.3 128.0 153.9 25.9 0.80 12.9 0.97 Fresh

SF21-011R 304.8 129.5 150.9 21.4 0.50 5.4 0.57 Fresh

SF21-012R 259.1 167.1 196.6 29.5 0.95 15.1 1.15 Fresh

SF21-013R 304.8 155.5 185.9 30.4 0.60 8.2 0.71 Fresh

SF21-015R 350.5 137.2 275.8 138.6 1.01 3.4 1.06 Transition & Fresh

SF21-016R 365.8 149.4 251.5 102.1 0.69 1.7 0.71 Transition & Fresh

SF21-017R 342.9 155.4 179.8 24.4 0.61 16.0 0.82 Transition

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

including: 164.6 169.2 4.6 1.65 54.8 2.38 Transition

253.0 342.9 89.9 0.79 2.2 0.82 Fresh

SF21-018R 411.5 175.3 204.2 28.9 0.97 12.1 1.13 Fresh

including: 189.0 193.6 4.6 2.93 26.7 3.29 Fresh

298.7 355.1 56.4 1.07 12.1 1.23 Fresh

*Notes: Au Eq equals Au (gpt) + (Ag gpt/75). Metallurgical recovery has not been factored as insuff icient test-work is available to determine potential Ag recoveries.

True thickness of the intercepts shown above are estimated to be 80 -90% of the drilled interval

Drill hole location map, Santa Fe pit area, Santa Fe Project, Mineral County, Nevada. Bright green drill hole traces are those

reported here, black traces were previously reported holes . The high-grade Bonanza, Big Horn and BH zones are outlined and

remain open down-dip and along strike. Line of long section is shown.

QA/QC Protocols:

Lahontan conducts an industry standard QA/QC program for its core and RC drilling programs. The QA/QC

program consisted of the insertion of coarse blanks and Certified Reference Materials (CRM) into the

sample stream at random intervals. The targeted rate of insertion was one QA/QC sample for every 16 to

20 samples. Coarse blanks were inserted at a rate of one coarse blank for every 65 samples or approximately

1.5% of the total samples. CRM’s were inserted at a rate of one CRM for every 20 samples or approximately

5% of the total samples. The standards utilized include three gold CRM’s and one blank CRM that were

purchased from Shea Clark Smith Laboratories (MEG) of Reno, Nevada. Expected gold values are 0.188

gpt, 1.107 gpt, 10.188 gpt, and -0.005 gpt, respect ively. The coarse blank material comprised of

commercially available landscape gravel with an expected gold value of -0.005 gpt.

As part of the RC drilling QA/QC process, duplicate samples were collected of every 20th sample interval

at the drill rig to e valuate sampling methodology. Samples were collected from the reject splitter on the

drill rig cyclone splitter. Samples were collected at each 95- to 100-foot (28.96 - 30.48m) mark and labeled

with a “D” suffix on the sample bag. No duplicates were submitted for core.

All drill samples were sent to American Assay Laboratories (AAL) in Sparks, Nevada, USA for analyses.

Delivery to the lab was either by a Lahontan Gold employee or by an AAL driver. Analyses for all RC and

core samples consisted of Au analys is using 30-gram fire assay with ICP finish, along with a 36 -element

geochemistry analysis performed on each sample utilizing two acid digestion ICP-AES method. Tellurium

CalvadaFault?

Santa Fe Fault Zone

Santa Fe Pit

SF21-015RSF21-016R

Cross Section Line

SF21-008R

SF21-018R

SF21-012R

SF21-013R

SF21-011R

SF21-010R

SF21-007R

SF21-017R

BONANZA

BIG HORN

BH

ATCHISON TA RG E T

217 Queen Street West, Suite 401, Toronto, ON M5V 0R2 www.lahontangoldcorp.com

analyses were performed on select drill holes utilizing ICP -MS method. Cyanide leach analyses, using a

tumble time of 2 hours and analyzed with ICP -AES method, were performed on select drill holes for Au

and Ag recovery. AAL inserts their own blanks, standards and conducts duplicate analyses to ensure proper

sample preparation and equipment calibration. We have all results reported in grams per tonne (gpt).

About Lahontan Gold Corp:

Lahontan Gold Corp. (TSX.V: LG; OTCQB: LGCXF) is a Canadian mineral exploration company that

holds, through its US subsidiaries, three top-tier gold and silver exploration properties in the Walker Lane

of mining friendly Nevada. Lahontan’s flagship property, the 19 km2 Santa Fe Project, is a past producing

gold and silver mine with excellent potential to host significant gold and silver resources (past production

of 375,000 ounces of gold and 710,000 ounces of silver between 1988 and 1992; Nevada Bureau of Mines

and Geology, 1996). Modeling of over 110,000 metres of historic drilling, geologic mapping, and

geochemical sampling outline both shallow, oxidized gold and silver mineralization as well as deeper high

grade potential resources. The Company is completing an aggressive 25,000 metre drilling program with

the goal of publishing a National Instrument 43 -101 (“NI 43-101”) compliant mineral resource estimate

in 2022. For more information, please visit our website: www.lahontangoldcorp.com

All scientific and technical information in this press release has been reviewed and approved by Quentin J.

Browne, P.Geo., Consulting Geologist to Lahontan Gold Corp., who is a qualified person under the

definitions established by National Instrument 43-101.

On behalf of the Board of Directors

Kimberly Ann

Founder, Chief Executive Officer, President, and Director

FOR FURTHER INFORMATION, PLEASE CONTACT:

Lahontan Gold Corp.

Kimberly Ann

Founder, Chief Executive Officer, President, Director

Phone: 1-530-414-4400

Email:

[email protected]

Website: www.lahontangoldcorp.com

Cautionary Note Regarding Forward-Looking Statements:

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Except for statements of historic fact, this news release contains certain "forward-looking information" within the meaning of

applicable securities law. Forward-looking information is frequently characterized by words such as "plan", "expect", "project",

"intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or

"will" occur. Forward-looking statements are based on the opinions and estimates at the date the statements are made and are

subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from

those anticipated in the forward-looking statements including, but not limited to delays or uncertainties with regulatory

approvals, including that of the T SXV. There are uncertainties inherent in forward -looking information, including factors

beyond the Company’s control. The Company undertakes no obligation to update forward-looking information if circumstances

or management's estimates or opinions should change except as required by law. The reader is cautioned not to place undue

reliance on forward-looking statements. Additional information identifying risks and uncertainties that could affect financial

results is contained in the Company’s filings with Canadian securities regulators, which filings are available at www.sedar.com