Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LEM.V ·

Leading Edge Materials Receives Permit for Follow Up Drill

Permits & Approvals

NEWS RELEASE July 11, 2017

LEADING EDGE MATERIALS CORP.

1305 – 1090 West Georgia Street, Vancouver, BC, V6E 3V7

T +1 604 685 9316 | leadingedgematerials.com

TSX.V : LEM OTCQB : LEMIF

emerging materials, expanding markets

Leading Edge Materials Receives Permit for Follow Up Drill

Program at Bergby, Sweden

Vancouver, Canada – Leading Edge Materials Corp . (“Leading Edge Materials”) or (“the Company”)

(TSXV: LEM) (OTCQB: LEMIF) is pleased to announce the receipt of a new drilling permit for the Bergby

lithium project in Sweden. The new permit allows for up to 48 additional drill sites, and the Company is

targeting third quarter of calendar 2017 for drilling operations to commence.

The first drill program at Bergby (see Leading Edge Materials press releases dated April 25, June 5 and

June 19, 2017) produced positive results and a follow up program is warranted. Li 2O (lithium oxide)

mineralization in pegmatite was intersected in 17 of the 18 holes drilled during this first program, and

included high lithium grades and mineralized intervals exceeding 16m thickness (see Tables 1 and 2 in

June 19 release). Encouragingly, lithium mineralized pegmatite was discovered at very shallow depths,

extending from surface outcrop and dipping beneath thin glacial soil cover.

The proposed second phase drill program at Bergby w ill test along strike and down dip from previously

drilled mineralization, as mineralization lies open in all directions. Lithium mineralized outcrops and

boulders are known from a strike length of more than 1.5km, significantly exceeding the 600m of strike

that has been drill tested to date. The lithium mineralized pegmatite dips at shallow depth, and

multiple down dip holes are planned for each drill section.

A detailed program is now being prepared. A component of larger diameter drilling is planned to gain

adequate sample for metallurgical testwork.

Blair Way, President and CEO, stated “Following on from the excellent results we received in the first

Bergby drill program, our Swedish team has moved quickly to ensure we can continue our exploration

at a fast pace. We now have a permit in place for an expanded drilling program that will test the along

strike and down dip potential of the lithium minera lized pegmatite, both of which remain completely

open.”

Bergby lies in central Sweden, 25km north of the town of Gavle, secured by three exploration licenses

that cover a total of 1,903 Ha. The site is close to infrastructure, with major roads, rail and power

supply passing immediately adjacent to the claim boundaries. The potential for low cost and rapid

development is significantly enhanced by the presence of a deep-water port only 5km from the site.

Europe is playing a leading role in the transition to low-carbon energy generation from renewable

sources, and the efficient storage of that energy. Electric mobility (EV’s, HEV, PHEV’s) and stationary

electricity storage are dependent on high purity graphite, lithium and cobalt, where Leading Edge

Materials is an active European player. Lithium has a strong and expanding market, due to the

essential role it plays in lithium-based batteries for the automotive, consumer product and stationary

electrify storage industries. The high electrochemical potential of lithium results in the high power to

weight ratio that is essential for efficient mobile batteries.

In corporate news, Leading Edge Materials advises of the resignation of Mr. Mikael Ranggard from the

Board. Mr. Ranggard has played a critical role in th e development of Leading Edge Materials, and he is

thanked for his contribution. He shall continue to pr ovide on-going consulting and advisory support to

the Company.

On behalf of the Board,

"Blair Way"

Blair Way, President & CEO

For further information, contact: 1.604.685.9316

or [email protected]

www.leadingedgematerials.com

2

About Leading Edge Materials

Leading Edge Materials was formed with our sights fi rmly focused on the materi al demands of a once-in-a-

generation revolution, as the world shifts to the effici ent production, storage and preservation of low carbon

energy. From the lithium batteries in our electric vehicles to our ability to generate energy from the sun, wind and

waves LEM is focused on the green energy markets. Wi th a focus on Europe and assets in innovation-rich

Scandinavia, Leading Edge Materials is ideally placed to pl ay a pivotal role in the sustainable supply of critical

technology materials.

The TSX Venture Exchange nor its Regulati on Services Provider (as that term is defined in the policies of the TSX

Venture Exchange), accept responsibility for the adequacy or accuracy of this news release.

The qualified person as defined in National Instrument 43-101, Blair Way, President, Chief Executive Officer and a

director of the Company, and a Fellow of the Australasian Institute of Mining and Metallurgy, has reviewed and

verified the contents of this release.

Forward-Looking Information. This news release may contain forwar d-looking statements and information

based on current expectations. These statements should not be read as guarantees of future performance or

results. Such statements involve known and unknown risks, uncertainties and other fact ors that may cause actual

results, performance or achievements to be materially different from those implied by such statements. Such

statements include but are not limited to, timing and expectations of planned drill programs; unexpected geological

conditions; exploration activities to advance critical mate rial projects of the Company for energy storage markets,

delays in obtaining or failure to obtain necessary perm its and approvals from governm ent authorities. Although

such statements are based on management's reasonable as sumptions, there are risk factors which could cause the

Company's actual results, performance or achievements to be materially different from any future results,

performance or achievements expressed or implied by the forward-looking information contained herein. All

forward-looking information herein is qualified in its en tirety by this cautionary statement, and the Company

disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result

of any revisions to any of the forwar d-looking information contained herein to reflect future results, events or

developments, except as required by law.