Leading Edge Materials Announces Positive Preliminary Economic Assessment Results FOR Its Woxna Graphite Anode Project with US$317M Pre-Tax NPV and 42.9% Pre-Tax IRR
NEWS RELEASE June 09, 2021
LEADING EDGE MATERIALS CORP.
1305 – 1090 West Georgia Street, Vancouver, BC, V6E 3V7
[email protected] | www.leadingedgematerials.com
TSX.V: LEM | Nasdaq First North: LEMSE | OTCQB: LEMIF
TSX.V: LEM | Nasdaq First North: LEMSE | OTCQB: LEMIF
LEADING EDGE MATERIALS ANNOUNCES POSITIVE PRELIMINARY ECONOMIC
ASSESSMENT RESULTS FOR ITS WOXNA GRAPHITE ANODE PROJECT WITH
US$317M PRE-TAX NPV AND 42.9% PRE-TAX IRR
Vancouver, June 09, 2021 – Leading Edge Materials Corp. (“Leading Edge Materials” or
the “Company”) (TSXV: LEM) (Nasdaq First North: LEMSE) (OTCQB: LEMIF) is pleased to
announce the results of a Preliminary Economic Assessment ("PEA" or the “Report”) for
the development of its 100%-owned Woxna Graphite mine and vertically integrated
anode material production located in Sweden (“Woxna” or the “Project”). The PEA was
prepared by Zenito Limited. All figures in the PEA are US dollars unless otherwise
specified.
Main PEA Highlights
• The PEA indicates the potential viability of a Swedish operation producing battery
grade graphite anode material utilizing an existing graphite mine and concentrator
with the addition of a value-add processing facility offsite;
• The proposed process route in the PEA uses a thermal purification process which,
combined with access to low cost hydropower offers a low carbon footprint for the
Project to be further demonstrated in an upcoming life cycle assessment (LCA)
report. The PEA also focused on improved waste management process for tailings
further improving the sustainability ambitions of the Project;
• The Report shows a financially robust Project with average annual EBITDA of $49m
and a pre-tax Internal Rate of Return (IRR) of 42.9%;
• The PEA utilizes one out of four deposits currently owned by Woxna under granted
exploitation concessions, where two of the other deposits also have indicated and
inferred mineral resource estimates offering potential upside for further
expansion in future development or studies;
Project Financial Highlights
• Pre-tax Net Present Value (NPV) of $317m using an 8% discount rate
• Pre-tax IRR of 42.9%
• Accumulated project revenues of $1,425m
• Average annual EBITDA of $49m
• Initial Capital Expenditures (CAPEX) of $121m
• Pre-tax Payback Period from first production of 2.24 years
• Operating cost per tonne of coated spherical purified graphite (CSPG) of $2,519
after revenue credit from micronized graphite product
Operational Highlights
• Life of Project (LOP) is 19 years
• Life of Mine (LOM) is 15 years
• LOM average annual plant feed of 159,967 tonnes
• LOM average annual CSPG product 7,435 tonnes
• LOM average annual micronized graphite product 8,421 tonnes
• LOM average strip ratio of 3.7:1
Filip Kozlowski, CEO of Leading Edge Materials states “I am pleased to share the exciting
results from the PEA for our vertically integrated Woxna Graphite mine to anode material
project. With forecast post tax IRR of 37.6% the project could potentially deliver a great
financial opportunity whilst enabling Europe to reduce reliance on Chinese imports, which
currently dominates 100% of the processing of natural flake graphite for lithium-ion battery
anode applications. The PEA demonstrates the competitive advantage of the project’s Swedish
location, with access to hydropower the planned production is not only shown to be potentially
cost competitive with current global alternatives but also enables a minimal carbon footprint
for our products. This is expected to be born-out in the previously announced planned LCA
report where independent consultancy Minviro Ltd. will use the data from the PEA to calculate
the environmental impact of the project.”
Location and Infrastructure
The Woxna Graphite project is located near the town of Edsbyn in Ovanåker Municipality,
Gävleborg County, in the Kingdom of Sweden approximately 300 km northwest of the
capital Stockholm. Woxna holds four separate deposits under exploitation concessions
with additional surrounding exploration licenses. The Kringel deposit has already been
developed as an existing mine with a partially exploited open pit and is the only deposit
used as a basis for the Project in the PEA. A modernized processing plant, tailings storage
facility (TSF), office and workshop buildings exist adjacent to the Kringel resource, are fully
connected with power and water services, and are currently under care and maintenance.
Regional access from all major cities and ports to Edsbyn is by sealed road and the last
local access to the Kringel concession is via unsealed all-weather forestry roads.
Geology and Mineral Resource Estimate
The mineralization found within the four Woxna Graphite deposits comprise of
metasomatically/hydrothermally formed graphite in association with prominent
pegmatitic intrusions into steeply-dipping calcareous quartz-rich meta-tuff, with
interbedded metasedimentary material. The Kringel concession’s tabular mineralization
extends to at least 150 m below surface with an average overburden thickness of 3.5 m
and over an approximate strike length of 600 m.
Systematic exploration took place from 1985 onwards initially only using geophysics and
later diamond drilling with current combined historical data for a total number of 92
drillholes for a total length of 6,581 m.
All of the mineral resource estimates were prepared in accordance with the NI43-101
Standards of disclosure and the classification of levels of confidence are considered
appropriate on the basis of drillhole spacing, sample interval, geological interpretation,
and all currently available assay data. Drillhole data for the concessions were verified by
ReedLeyton for the mineral resource estimate in the PEA.
Mineral Resource Estimate – Measured and Indicated
Property Classification of Mineral Resource Tonnes (Mt) Grade C (%)
Kringel
Measured 0.96 9.21
Indicated 1.65 9.09
Sub-total Measured + Indicated 2.61 9.13
Gropabo
Indicated
2.33 7.72
Mattsmyra 5.83 7.14
Total Measured + Indicated 10.77 7.75
Mineral Resource Estimate – Inferred
Property Classification of Mineral Resource Tonnes (Mt) Grade C (%)
Kringel
Inferred
0.39 8.72
Gropabo 0.61 8.07
Mattsmyra 1.51 8.06
Total Inferred 2.51 8.16
Source: ReedLeyton 2021
Notes:
• Inconsistencies in totals are due to rounding;
• 4% Cg mill cut-off grade applied for reporting purposes constrained within the MPlan 2021
pitshell;
• Reported according to CIM Definition Standards 2011;
• Reported according to CIM Mineral Exploration Best Practice Guidelines (Nov 2018);
• No geological losses applied;
• Default Density of 2.7 t/m3 applied to in situ, then Density of 2.82 t/m3 applied to Type A
Graphite and Density of 2.86 t/m3 applied to Type B Graphite for Gropabo and Mattsmyra;
and Default Density for Kringel remained at 2.7 t/m3;
• The previous Mineral Resource Estimates for the Project were developed without the
constraint of an applied mine plan and open-pit shell. In the light of more rigorous
compliance requirements, the Mineral Resources were reported by ReedLeyton within the
constraints of the PEA mine plan as a means of demonstrating “reasonable prospects for
economic extraction” as required by numerous international reporting codes. No new
exploration data was included in the reporting process;
• Effective date of Mineral Resource Estimate is June 9, 2021; and
• Mineral resources are not mineral reserves and do not have demonstrated economic
viability;
The preliminary economic assessment is preliminary in nature, it includes inferred
mineral resources that are considered too speculative geologically to have the
economic considerations applied to them that would enable them to be categorized
as mineral reserves, and there is no certainty that the preliminary economic
assessment will be realized.
The economic analysis in the PEA only considers the Kringel deposit for which a new
Mineral Resource Estimate has been disclosed within a constraining optimised open pit-
shell at 2.61 million tonnes Measured + Indicated Mineral Resources at a grade of 9.13%
and 0.39 million tonnes Inferred Mineral Resources at 8.72%.
It is the opinion of ReedLeyton that these Mineral Resource estimates for Kringel,
Mattsmyra and Gropabo satisfy the definitions Measured, Indicated and Inferred Mineral
Resources as per the CIM Definition Standards. The estimate for the Mansberg deposit
remains historical in nature and may be superseded when additional exploration and
verification has been undertaken.
Property Classification of Mineral Resource Tonnes (Mt) Grade C (%)
Mansberg Historical 1.35 9.44
Source: ReedLeyton 2021
Mining
Conventional open-pit drill and blast combined with trucks and shovel mining methods
have been selected to be operated by a local specialist mining contractor, to maximise the
operational efficiency, provide flexibility, and potentially lower investment risk to the
project.
The processing schedule assumes LOM 159,967 tonnes of Type A graphite (average LOM
grade of 10.2%) annual mill feed starting from Year 1 until Year 16 after which the lower
grade stockpiled Type B graphite is then fed into the mill. The production plan for the
process plant continues until Year 19 when the low-grade mill feed from the stockpile is
exhausted. In total the LOM production schedule will produce an expected approximately
258,000 tonnes of contained graphite in concentrate. The mine production schedule
includes approximately 10% inferred mineral resources over the life of the Project.
Inferred Mineral Resources form part of the Potentially Mineable Resource upon which
the PEA is based. Inferred Mineral Resources cannot be directly converted into Mineral
Reserves and due to their uncertainty of existence it cannot be assumed that any part of
an Inferred Mineral Resource will ever be upgraded to a higher Mineral Resource
category.
The waste rock storage plan is designed to temporarily store 1.4 Mt of overburden soil
material over the life of mine for rehabilitation purposes of backfilling the open pit area.
The hard rock waste will amount to 10.1 Mt over the life of mine and may be utilised as
construction material for TSF maintenance.
Graphite Processing
In the PEA, the existing processing plant at the Kringel deposit and mine location are
planned to be utilized to produce a graphite concentrate product. The PEA includes
capital expenditure for minor upgrades of the plant to improve the quality of the
concentrate produced. Existing rod mill comminution circuit should be complemented
with a new crushing plant, crushed material stockpile and rod mill classifier. Material is
then beneficiated in a proven flotation circuit which is to be further upgraded with
additional flotation cells, vertical mills, dewatering cyclones and clarifiers to improve on
the carbon grade of the final graphite concentrate product.
The upgrade of the processing plant is based on metallurgical testwork commissioned by
the Company. The processing plant will receive LOM 159,967 tonnes per annum of
mineralized material at an average LOM grade graphite of 10.2%. At an average recovery
of 93.8% the LOM output of the processing plant is circa 16,584 tonnes per annum of a
graphite concentrate product grading an average 92.3% carbon which is then transported
to the value add processing facility for further upgrading.
Value-add Processing
For the purpose of the PEA an existing industrial brownfield site in the town of Edsbyn
has been used to evaluate the downstream upgrading of the graphite concentrate to
higher value products. The value-add facility receives the graphite concentrate which then
is milled, spheronized and classified to a particle size of d50 at 15μm.
The spheronized particles are then thermally treated in high temperature furnaces at
2,600°C which brings the purity up to a minimum of 99.95% C which is the minimum
requirement to be suitable for use in lithium-ion battery applications.
Lastly the spherical purified graphite is coated with a carbon material with further
thermal treatment to produce a suitable active anode material product suitable for
electric vehicle applications.
The milling and spheronization processing step results in a significant amount of the
material being rejected as too fine for the active anode material product. The PEA is
based on a 45% yield to the active anode material product stream. The rejected fines will
be further processed with jet mills to produce a micronized graphite product.
Market overview and price assumptions
Coated Spherical Purified Graphite product
For the purposes of the PEA, a high-level market study of the graphite anode market was
commissioned from Benchmark Mineral Intelligence which both provides forecasted
demand and supply data and estimated price ranges for the type of anode product that
the Project is looking to produce.
In 2020, flake graphite demand was still dominated by the refractory and foundry markets
representing a 52% of demand, with the lithium-ion battery market representing 27% of
demand. Going forward, most of the increase in demand is expected from the lithium-ion
battery markets.
Graphite is the main material used as anodes and is agnostic to the cathode chemistry.
Graphite for anodes can either be synthetic or natural where by 2030 natural graphite
anodes is expected to represent 49% of the material. Flake graphite demand for lithium-
ion batteries is expected to grow from 202,617 tonnes in 2020, to 1,108,448 tonnes in
2025 and 2,896,225 tonnes in 2030. In Europe, announcements have been made for
battery factories representing more than 700GWh annual capacity, which requires
approximately 700,000 tonnes per year of anode material. Assuming 50% of this is natural
graphite based anode material and a 50% spheronization yield, this would equal to an
annual demand for natural graphite for the lithium-ion battery industry of 700,000 tonnes
in Europe alone.
In 2020, China represented 71% of graphite raw material supply, whilst for spherical
graphite supply China’s share of world supply was 100%. There are a number of projects
globally looking to bring online new supply of graphite raw material. In reality a number
of these projects already have or will target to sell their material for further processing in
China. With its existing graphite mine and targeted vertically integrated production of
CSPG in the European Union, Woxna offers a unique proposition.
There is an increasing focus on the sustainability and environmental footprint of
materials for lithium-ion batteries and any material considering entering the European
market needs to demonstrate highest sustainability standards. Woxna’s thermal
purification process and access to hydropower provides a strategic advantage compared
with current supply where Environmental, Social, Governance (ESG) standards have been
questioned due to reagent intensity and poor waste management.
The market study by Benchmark Mineral Intelligence provides a range of forecasted
prices depending on the quality of the CSPG anode material; with low quality material
targeting Chinese domestic electric vehicle or non-electric vehicle applications, average
quality material targeting tier 1 electric vehicle application and high quality material
targeting tier 1 applications in Japan, South Korea, North America and Europe. Over the
next decade, the average forecasted prices for the three price qualities are $6,650,
$11,000 and $15,350 per tonne. For the purposes of the PEA financial models, a
conservative price of $10,000 per tonne has been used for the Woxna CSPG. It should be
noted that CSPG is not a product traded on the open market but rather sold on long term
contracts with buyers after extensive product qualification and hence Woxna’s ability to
sell material at these prices will be dependent on successfully producing sample materials
to qualify with potential customers and sign the appropriate sales agreements.
Micronized Graphite product
For the micronized graphite product, a leading European graphite expert was
commissioned to produce a market report for this product stream. Micronized graphite is
a classification of very finely milled graphite powders, normally below 40μm at different
carbon grades that have broad industrial applications such as coatings, lubricants, battery
materials, conductive additives and insulation materials. The same European graphite
expert providing the market information has performed metallurgical testwork providing
an understanding of the Woxna graphite’s suitability to target these end-markets. The
market report gave an estimate of 19,000 tonnes per annum market size for Europe and
price ranges for both >12μm and <12μm material of €800-€1200 per tonne and €1400-
€2100 respectively. For the financial model of the PEA, a price of $1200 per tonne of
micronized graphite product has been conservatively used. It should be noted that these
products are not traded on a market and any sale and pricing of such will depend on the
success of Woxna to qualify material with potential customers and negotiate pricing to
sell those products.
Project Profitability, Capital and Operating costs
Project profitability
Parameter Value
Pre-Tax NPV(8%) $317m
Post-Tax NPV(8%) $248m
Pre-Tax IRR 42.9%
Post-Tax IRR 37.4%
Accumulated Project Revenues $1,425m
Accumulated Project EBITDA $936m
Initial Capital Expenditures (CAPEX) $121m
Average Annual Revenue $75m
Average Annual Operating Expenditures (OPEX) $26m
Average Annual EBITDA $49m
Pre-Tax Payback Period from first production 2.24 years
Post-Tax Payback Period from first production 2.51 years
USD$/SEK conversion rate 8.40
Pre-tax sensitivities
CSPG price per tonne $7,000 $8,500 $10,000 $11,500 $13,000
NPV(8%) $146m $231m $317m $403m $489m
IRR 25.1% 34.1% 42.9% 51.5% 60.0%
Post-tax sensitivities
CSPG price per tonne $7,000 $8,500 $10,000 $11,500 $13,000
NPV(8%) $112m $180m $248m $257m $384m
IRR 22.5% 30.1% 37.4% 44.5% 51.5%
The project cost estimates are compiled from supporting engineering documents and
cost information derived from quotations from equipment suppliers and local service
providers, historical cost information sourced from in-house and commercial databases
and Woxna Graphite derived data from existing operations. This Project estimate is AACE
Class 5 targeting overall accuracy of ±30%.
Initial Capital Expenditures
Direct
Buildings $1 689 478
Concrete $334 952
Control and Instrumentation $1 022 662
Earthworks $2 337 400
Electrical $3 773 693
Mechanical $69 354 246
Mechanical Installation $7 880 600
Mining Pre-strip $2 029 500
Mobile Equipment $133 390
Piping $2 110 985
Platework $581 168
Steelwork $328 417
Direct Total $91 576 492
Indirect
Commissioning $882 143
Construction Facilities $696 188
Contingency $17 441 918
EPCM $5 000 000
Owners Cost $654 890
Indirect Total $24 675 140
Working
Inventory $4 858 455
Working Total $4 858 455
Initial Grand Total $121 110 086
Average Annual Operating costs
Total
General and
Mining
Graphite
Processing
Value-add
Processing
General &
Administration $433 083 $433 083
Mining costs $3 731 931 $3 731 931
Labour $4 874 249 $2 827 670 $2 046 579
Maintenance & Spares $4 090 514 $893 200 $3 197 314
Mobile Equipment $139 266 $106 007 $33 259
Reagents $1 355 796 $85 676 $1 270 120
Utilities $2 954 716 $809 722 $2 144 995
Consumables $6 377 409 $174 308 $6 203 100
Sales Costs $1 650 927 $1 650 927
Total Annual
Operating Costs $25 607 891 $4 165 014 $4 896 583 $16 546 294