Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LEM.V ·

Leading Edge Materials Announces Positive Preliminary Economic Assessment Results FOR Its Woxna Graphite Anode Project with US$317M Pre-Tax NPV and 42.9% Pre-Tax IRR

Economic Studies

NEWS RELEASE June 09, 2021

LEADING EDGE MATERIALS CORP.

1305 – 1090 West Georgia Street, Vancouver, BC, V6E 3V7

[email protected] | www.leadingedgematerials.com

TSX.V: LEM | Nasdaq First North: LEMSE | OTCQB: LEMIF

TSX.V: LEM | Nasdaq First North: LEMSE | OTCQB: LEMIF

LEADING EDGE MATERIALS ANNOUNCES POSITIVE PRELIMINARY ECONOMIC

ASSESSMENT RESULTS FOR ITS WOXNA GRAPHITE ANODE PROJECT WITH

US$317M PRE-TAX NPV AND 42.9% PRE-TAX IRR

Vancouver, June 09, 2021 – Leading Edge Materials Corp. (“Leading Edge Materials” or

the “Company”) (TSXV: LEM) (Nasdaq First North: LEMSE) (OTCQB: LEMIF) is pleased to

announce the results of a Preliminary Economic Assessment ("PEA" or the “Report”) for

the development of its 100%-owned Woxna Graphite mine and vertically integrated

anode material production located in Sweden (“Woxna” or the “Project”). The PEA was

prepared by Zenito Limited. All figures in the PEA are US dollars unless otherwise

specified.

Main PEA Highlights

• The PEA indicates the potential viability of a Swedish operation producing battery

grade graphite anode material utilizing an existing graphite mine and concentrator

with the addition of a value-add processing facility offsite;

• The proposed process route in the PEA uses a thermal purification process which,

combined with access to low cost hydropower offers a low carbon footprint for the

Project to be further demonstrated in an upcoming life cycle assessment (LCA)

report. The PEA also focused on improved waste management process for tailings

further improving the sustainability ambitions of the Project;

• The Report shows a financially robust Project with average annual EBITDA of $49m

and a pre-tax Internal Rate of Return (IRR) of 42.9%;

• The PEA utilizes one out of four deposits currently owned by Woxna under granted

exploitation concessions, where two of the other deposits also have indicated and

inferred mineral resource estimates offering potential upside for further

expansion in future development or studies;

Project Financial Highlights

• Pre-tax Net Present Value (NPV) of $317m using an 8% discount rate

• Pre-tax IRR of 42.9%

• Accumulated project revenues of $1,425m

• Average annual EBITDA of $49m

• Initial Capital Expenditures (CAPEX) of $121m

• Pre-tax Payback Period from first production of 2.24 years

• Operating cost per tonne of coated spherical purified graphite (CSPG) of $2,519

after revenue credit from micronized graphite product

Operational Highlights

• Life of Project (LOP) is 19 years

• Life of Mine (LOM) is 15 years

• LOM average annual plant feed of 159,967 tonnes

• LOM average annual CSPG product 7,435 tonnes

• LOM average annual micronized graphite product 8,421 tonnes

• LOM average strip ratio of 3.7:1

Filip Kozlowski, CEO of Leading Edge Materials states “I am pleased to share the exciting

results from the PEA for our vertically integrated Woxna Graphite mine to anode material

project. With forecast post tax IRR of 37.6% the project could potentially deliver a great

financial opportunity whilst enabling Europe to reduce reliance on Chinese imports, which

currently dominates 100% of the processing of natural flake graphite for lithium-ion battery

anode applications. The PEA demonstrates the competitive advantage of the project’s Swedish

location, with access to hydropower the planned production is not only shown to be potentially

cost competitive with current global alternatives but also enables a minimal carbon footprint

for our products. This is expected to be born-out in the previously announced planned LCA

report where independent consultancy Minviro Ltd. will use the data from the PEA to calculate

the environmental impact of the project.”

Location and Infrastructure

The Woxna Graphite project is located near the town of Edsbyn in Ovanåker Municipality,

Gävleborg County, in the Kingdom of Sweden approximately 300 km northwest of the

capital Stockholm. Woxna holds four separate deposits under exploitation concessions

with additional surrounding exploration licenses. The Kringel deposit has already been

developed as an existing mine with a partially exploited open pit and is the only deposit

used as a basis for the Project in the PEA. A modernized processing plant, tailings storage

facility (TSF), office and workshop buildings exist adjacent to the Kringel resource, are fully

connected with power and water services, and are currently under care and maintenance.

Regional access from all major cities and ports to Edsbyn is by sealed road and the last

local access to the Kringel concession is via unsealed all-weather forestry roads.

Geology and Mineral Resource Estimate

The mineralization found within the four Woxna Graphite deposits comprise of

metasomatically/hydrothermally formed graphite in association with prominent

pegmatitic intrusions into steeply-dipping calcareous quartz-rich meta-tuff, with

interbedded metasedimentary material. The Kringel concession’s tabular mineralization

extends to at least 150 m below surface with an average overburden thickness of 3.5 m

and over an approximate strike length of 600 m.

Systematic exploration took place from 1985 onwards initially only using geophysics and

later diamond drilling with current combined historical data for a total number of 92

drillholes for a total length of 6,581 m.

All of the mineral resource estimates were prepared in accordance with the NI43-101

Standards of disclosure and the classification of levels of confidence are considered

appropriate on the basis of drillhole spacing, sample interval, geological interpretation,

and all currently available assay data. Drillhole data for the concessions were verified by

ReedLeyton for the mineral resource estimate in the PEA.

Mineral Resource Estimate – Measured and Indicated

Property Classification of Mineral Resource Tonnes (Mt) Grade C (%)

Kringel

Measured 0.96 9.21

Indicated 1.65 9.09

Sub-total Measured + Indicated 2.61 9.13

Gropabo

Indicated

2.33 7.72

Mattsmyra 5.83 7.14

Total Measured + Indicated 10.77 7.75

Mineral Resource Estimate – Inferred

Property Classification of Mineral Resource Tonnes (Mt) Grade C (%)

Kringel

Inferred

0.39 8.72

Gropabo 0.61 8.07

Mattsmyra 1.51 8.06

Total Inferred 2.51 8.16

Source: ReedLeyton 2021

Notes:

• Inconsistencies in totals are due to rounding;

• 4% Cg mill cut-off grade applied for reporting purposes constrained within the MPlan 2021

pitshell;

• Reported according to CIM Definition Standards 2011;

• Reported according to CIM Mineral Exploration Best Practice Guidelines (Nov 2018);

• No geological losses applied;

• Default Density of 2.7 t/m3 applied to in situ, then Density of 2.82 t/m3 applied to Type A

Graphite and Density of 2.86 t/m3 applied to Type B Graphite for Gropabo and Mattsmyra;

and Default Density for Kringel remained at 2.7 t/m3;

• The previous Mineral Resource Estimates for the Project were developed without the

constraint of an applied mine plan and open-pit shell. In the light of more rigorous

compliance requirements, the Mineral Resources were reported by ReedLeyton within the

constraints of the PEA mine plan as a means of demonstrating “reasonable prospects for

economic extraction” as required by numerous international reporting codes. No new

exploration data was included in the reporting process;

• Effective date of Mineral Resource Estimate is June 9, 2021; and

• Mineral resources are not mineral reserves and do not have demonstrated economic

viability;

The preliminary economic assessment is preliminary in nature, it includes inferred

mineral resources that are considered too speculative geologically to have the

economic considerations applied to them that would enable them to be categorized

as mineral reserves, and there is no certainty that the preliminary economic

assessment will be realized.

The economic analysis in the PEA only considers the Kringel deposit for which a new

Mineral Resource Estimate has been disclosed within a constraining optimised open pit-

shell at 2.61 million tonnes Measured + Indicated Mineral Resources at a grade of 9.13%

and 0.39 million tonnes Inferred Mineral Resources at 8.72%.

It is the opinion of ReedLeyton that these Mineral Resource estimates for Kringel,

Mattsmyra and Gropabo satisfy the definitions Measured, Indicated and Inferred Mineral

Resources as per the CIM Definition Standards. The estimate for the Mansberg deposit

remains historical in nature and may be superseded when additional exploration and

verification has been undertaken.

Property Classification of Mineral Resource Tonnes (Mt) Grade C (%)

Mansberg Historical 1.35 9.44

Source: ReedLeyton 2021

Mining

Conventional open-pit drill and blast combined with trucks and shovel mining methods

have been selected to be operated by a local specialist mining contractor, to maximise the

operational efficiency, provide flexibility, and potentially lower investment risk to the

project.

The processing schedule assumes LOM 159,967 tonnes of Type A graphite (average LOM

grade of 10.2%) annual mill feed starting from Year 1 until Year 16 after which the lower

grade stockpiled Type B graphite is then fed into the mill. The production plan for the

process plant continues until Year 19 when the low-grade mill feed from the stockpile is

exhausted. In total the LOM production schedule will produce an expected approximately

258,000 tonnes of contained graphite in concentrate. The mine production schedule

includes approximately 10% inferred mineral resources over the life of the Project.

Inferred Mineral Resources form part of the Potentially Mineable Resource upon which

the PEA is based. Inferred Mineral Resources cannot be directly converted into Mineral

Reserves and due to their uncertainty of existence it cannot be assumed that any part of

an Inferred Mineral Resource will ever be upgraded to a higher Mineral Resource

category.

The waste rock storage plan is designed to temporarily store 1.4 Mt of overburden soil

material over the life of mine for rehabilitation purposes of backfilling the open pit area.

The hard rock waste will amount to 10.1 Mt over the life of mine and may be utilised as

construction material for TSF maintenance.

Graphite Processing

In the PEA, the existing processing plant at the Kringel deposit and mine location are

planned to be utilized to produce a graphite concentrate product. The PEA includes

capital expenditure for minor upgrades of the plant to improve the quality of the

concentrate produced. Existing rod mill comminution circuit should be complemented

with a new crushing plant, crushed material stockpile and rod mill classifier. Material is

then beneficiated in a proven flotation circuit which is to be further upgraded with

additional flotation cells, vertical mills, dewatering cyclones and clarifiers to improve on

the carbon grade of the final graphite concentrate product.

The upgrade of the processing plant is based on metallurgical testwork commissioned by

the Company. The processing plant will receive LOM 159,967 tonnes per annum of

mineralized material at an average LOM grade graphite of 10.2%. At an average recovery

of 93.8% the LOM output of the processing plant is circa 16,584 tonnes per annum of a

graphite concentrate product grading an average 92.3% carbon which is then transported

to the value add processing facility for further upgrading.

Value-add Processing

For the purpose of the PEA an existing industrial brownfield site in the town of Edsbyn

has been used to evaluate the downstream upgrading of the graphite concentrate to

higher value products. The value-add facility receives the graphite concentrate which then

is milled, spheronized and classified to a particle size of d50 at 15μm.

The spheronized particles are then thermally treated in high temperature furnaces at

2,600°C which brings the purity up to a minimum of 99.95% C which is the minimum

requirement to be suitable for use in lithium-ion battery applications.

Lastly the spherical purified graphite is coated with a carbon material with further

thermal treatment to produce a suitable active anode material product suitable for

electric vehicle applications.

The milling and spheronization processing step results in a significant amount of the

material being rejected as too fine for the active anode material product. The PEA is

based on a 45% yield to the active anode material product stream. The rejected fines will

be further processed with jet mills to produce a micronized graphite product.

Market overview and price assumptions

Coated Spherical Purified Graphite product

For the purposes of the PEA, a high-level market study of the graphite anode market was

commissioned from Benchmark Mineral Intelligence which both provides forecasted

demand and supply data and estimated price ranges for the type of anode product that

the Project is looking to produce.

In 2020, flake graphite demand was still dominated by the refractory and foundry markets

representing a 52% of demand, with the lithium-ion battery market representing 27% of

demand. Going forward, most of the increase in demand is expected from the lithium-ion

battery markets.

Graphite is the main material used as anodes and is agnostic to the cathode chemistry.

Graphite for anodes can either be synthetic or natural where by 2030 natural graphite

anodes is expected to represent 49% of the material. Flake graphite demand for lithium-

ion batteries is expected to grow from 202,617 tonnes in 2020, to 1,108,448 tonnes in

2025 and 2,896,225 tonnes in 2030. In Europe, announcements have been made for

battery factories representing more than 700GWh annual capacity, which requires

approximately 700,000 tonnes per year of anode material. Assuming 50% of this is natural

graphite based anode material and a 50% spheronization yield, this would equal to an

annual demand for natural graphite for the lithium-ion battery industry of 700,000 tonnes

in Europe alone.

In 2020, China represented 71% of graphite raw material supply, whilst for spherical

graphite supply China’s share of world supply was 100%. There are a number of projects

globally looking to bring online new supply of graphite raw material. In reality a number

of these projects already have or will target to sell their material for further processing in

China. With its existing graphite mine and targeted vertically integrated production of

CSPG in the European Union, Woxna offers a unique proposition.

There is an increasing focus on the sustainability and environmental footprint of

materials for lithium-ion batteries and any material considering entering the European

market needs to demonstrate highest sustainability standards. Woxna’s thermal

purification process and access to hydropower provides a strategic advantage compared

with current supply where Environmental, Social, Governance (ESG) standards have been

questioned due to reagent intensity and poor waste management.

The market study by Benchmark Mineral Intelligence provides a range of forecasted

prices depending on the quality of the CSPG anode material; with low quality material

targeting Chinese domestic electric vehicle or non-electric vehicle applications, average

quality material targeting tier 1 electric vehicle application and high quality material

targeting tier 1 applications in Japan, South Korea, North America and Europe. Over the

next decade, the average forecasted prices for the three price qualities are $6,650,

$11,000 and $15,350 per tonne. For the purposes of the PEA financial models, a

conservative price of $10,000 per tonne has been used for the Woxna CSPG. It should be

noted that CSPG is not a product traded on the open market but rather sold on long term

contracts with buyers after extensive product qualification and hence Woxna’s ability to

sell material at these prices will be dependent on successfully producing sample materials

to qualify with potential customers and sign the appropriate sales agreements.

Micronized Graphite product

For the micronized graphite product, a leading European graphite expert was

commissioned to produce a market report for this product stream. Micronized graphite is

a classification of very finely milled graphite powders, normally below 40μm at different

carbon grades that have broad industrial applications such as coatings, lubricants, battery

materials, conductive additives and insulation materials. The same European graphite

expert providing the market information has performed metallurgical testwork providing

an understanding of the Woxna graphite’s suitability to target these end-markets. The

market report gave an estimate of 19,000 tonnes per annum market size for Europe and

price ranges for both >12μm and <12μm material of €800-€1200 per tonne and €1400-

€2100 respectively. For the financial model of the PEA, a price of $1200 per tonne of

micronized graphite product has been conservatively used. It should be noted that these

products are not traded on a market and any sale and pricing of such will depend on the

success of Woxna to qualify material with potential customers and negotiate pricing to

sell those products.

Project Profitability, Capital and Operating costs

Project profitability

Parameter Value

Pre-Tax NPV(8%) $317m

Post-Tax NPV(8%) $248m

Pre-Tax IRR 42.9%

Post-Tax IRR 37.4%

Accumulated Project Revenues $1,425m

Accumulated Project EBITDA $936m

Initial Capital Expenditures (CAPEX) $121m

Average Annual Revenue $75m

Average Annual Operating Expenditures (OPEX) $26m

Average Annual EBITDA $49m

Pre-Tax Payback Period from first production 2.24 years

Post-Tax Payback Period from first production 2.51 years

USD$/SEK conversion rate 8.40

Pre-tax sensitivities

CSPG price per tonne $7,000 $8,500 $10,000 $11,500 $13,000

NPV(8%) $146m $231m $317m $403m $489m

IRR 25.1% 34.1% 42.9% 51.5% 60.0%

Post-tax sensitivities

CSPG price per tonne $7,000 $8,500 $10,000 $11,500 $13,000

NPV(8%) $112m $180m $248m $257m $384m

IRR 22.5% 30.1% 37.4% 44.5% 51.5%

The project cost estimates are compiled from supporting engineering documents and

cost information derived from quotations from equipment suppliers and local service

providers, historical cost information sourced from in-house and commercial databases

and Woxna Graphite derived data from existing operations. This Project estimate is AACE

Class 5 targeting overall accuracy of ±30%.

Initial Capital Expenditures

Direct

Buildings $1 689 478

Concrete $334 952

Control and Instrumentation $1 022 662

Earthworks $2 337 400

Electrical $3 773 693

Mechanical $69 354 246

Mechanical Installation $7 880 600

Mining Pre-strip $2 029 500

Mobile Equipment $133 390

Piping $2 110 985

Platework $581 168

Steelwork $328 417

Direct Total $91 576 492

Indirect

Commissioning $882 143

Construction Facilities $696 188

Contingency $17 441 918

EPCM $5 000 000

Owners Cost $654 890

Indirect Total $24 675 140

Working

Inventory $4 858 455

Working Total $4 858 455

Initial Grand Total $121 110 086

Average Annual Operating costs

Total

General and

Mining

Graphite

Processing

Value-add

Processing

General &

Administration $433 083 $433 083

Mining costs $3 731 931 $3 731 931

Labour $4 874 249 $2 827 670 $2 046 579

Maintenance & Spares $4 090 514 $893 200 $3 197 314

Mobile Equipment $139 266 $106 007 $33 259

Reagents $1 355 796 $85 676 $1 270 120

Utilities $2 954 716 $809 722 $2 144 995

Consumables $6 377 409 $174 308 $6 203 100

Sales Costs $1 650 927 $1 650 927

Total Annual

Operating Costs $25 607 891 $4 165 014 $4 896 583 $16 546 294