NEWS RELEASE   September 3, 2013 

FLINDERS’ WOXNA GRAPHITE PROJECT DELIVERS POSITIVE  PRELIMINARY ECONOMIC ASSESSMENT 

Vancouver,  Canada  –  Flinders  Resources  Limited  (“Flinders”)  (TSX.V  –  FDR)  is  pleased  to  report positive  results  from  its  preliminary  economic  analysis  (“PEA”)  of  the  100%‐owned  and  fully permitted Woxna graphite project in Sweden.

Financial Highlights 

Estimated in the PEA:

  • Low start‐up capital costs of $16.7 million1 (“M”) including contingency and working capital
  • Average production costs of $662 per tonne of graphite concentrate
  • $26.6M post tax net  present value (“NPV”) (8% discount);
  • 34% post‐tax internal rate of return (“IRR”)
  • Payback period of 3.9 years
  • Conservative average graphite sales price of $1, 199 per tonne used
  • Post tax NPV increases to $37.3M (8% discount) in a sensitivity analysis when 10% higher graphite prices of $1,318 per tonne are used. (see table 7)

Operational Highlights 

Estimated in the PEA:

  • 155, 000 tonnes / year  of mined material delivered to Run of Mine (“ROM”) with 10.3% average graphite head grade
  • Design production rate of 16, 600 tonnes / year of graphite concentrate
  • Excellent graphite recovery of 96%
  • 88%  to 95%  graphite purity and 40% by weight as premium large or extra‐large flake graphite
  • 13 year mine life
  • Stripping ratio of 5.3:1 overall, starting at 4:1

Mr Martin McFarlane, President and CEO states, “We are very encouraged by the positive results  from  the  Woxna  PEA,  which  demonstrate  a  very  low  capital,  low  operating  cost  project  that  generates  good  returns  for  shareholders.  Flinders’  on‐going  sales  of  stockpiled  flake  graphite  has  enabled  us  to  establish  relationships  with  consumers,  providing  a  firsthand  view  of  the  graphite  market  demand  in  Europe.  The  PEA  assumes  conservative  graphite  prices  and  requires  an  initial  capital investment that is an order of magnitude lower than peer projects.” 

1. Unless otherwise noted, all monetary figures presented in this document are in United States dollars.

“The  PEA  demonstrates  Woxna’s  strengths  in  the  flake  graphite  market,  which  include  its  full  operating  permit  allowing  immediate  restart,  an  established  processing  plant  and  related  mine  infrastructure, and close proximity to the European markets.  With Canadian $12.3 million cash on  hand as at July 31 2013, Flinders has a substantial portion of the start‐up capital available.  We thank  GBM and our other consultants for their input into this exciting project.” 

The PEA was prepared by GBM Minerals Engineering Consultants of the United Kingdom (Mineral Project Engineering), with contributions from Golder Associates AB of Sweden (Mining Plan), Reed Leyton  Consulting  (Mineral  Resource),  Aminpro  Metallurgical  Services  of  Chile  (Metallurgical  Test Work  and  Process  Design),  Tailings  Consultants  Scandinavia  (TCS)  (Tailings  Facility  Design)  and Woxna Graphite AB/Flinders Resources Limited (Project Owners).

MINERAL RESOURCES 

Woxna  Graphite  AB,  Flinders’  100%  owned  Swedish  subsidiary,  owns  4  mining  concessions  over graphite deposits (Kringel, Gropabo, Mattsmyra and Mansberg – the Woxna Project) located along a 40km trend in central Sweden. The PEA considers only one of these deposits, the Kringel deposit. The partially mined Kringel deposit lies adjacent to the processing plant, tailings dam and related infrastructure,  and  is  fully  permitted  for  an  immediate  restart.    Woxna  is  currently  reprocessing graphite and last mined graphite in 2001.

The Kringel mineral resource estimate was completed by independent geologist, Mr. Geoffrey Reed of Reed Leyton Consultants in April 2012. The resource estimate was recalculated for the PEA using more accurate drill hole collar locations and this has resulted in a moderately increased resource tonnage with higher grades.

The  recalculated  mineral  resource  at  Kringel  is drilled  across  an area  approximately  1200  metres (“m”)  length  by  100m  to  200m  width.      Mineralization  was  intersected  on  all  drill  sections  and continues to at least 150m below the surface.  Mineralization strikes east‐west, and dips between 60 and 80 degrees to the south.  Mineralization is present as four main and five smaller mineralized bodies.  The thickness in the section of the plane is usually more than 10m, but varies between 5m and  more  than  15m.    Mineralization  at  Kringel  remains  open  along  strike  and  at  depth,  and geophysical data suggests potential for significant expansion.

A total of 90 diamond drill holes for 6,581m drilled between 1988 and 2012 were included in the current mineral resource  estimation.   Hole  spacing is on a 50 metre by 50  metre drill pattern. A lower cut‐off grade of 7% graphite was used as the base case to calculate the resource.  Flinders considers the cut‐off grade to be conservative.

ClassificationTonnes (Mt)Graphite (“Cg”)
Measured1.010.7%
Indicated1.810.7%
Total2.810.7%

Table 1 – Kringel Mineral Resource Estimate (7 % Cg lower cut‐off grade) 

Cautionary  Note:  Mineral  Resources  that  are  not  Mineral  Reserves  do  not  have  demonstrated  economic viability. The PEA is preliminary in nature and there is no certainty that the PEA will be realized.

In addition to the Kringel graphite resource, the Gropabo, Mattsmyra and Mansberg flake graphite deposits contain historic resources.  These will continue to be classified as historic resources until Flinders has the opportunity to upgrade them to NI43‐101 standards. These historic resources are not included in the economic analysis of the PEA.

MINING 

The PEA estimates for the life of the mine(“LOM”):

  • Mining costs of $240/tonne of graphite; $25.80/tonne to ROM; $4.1/tonne mined
  • Average graphite grade to ROM 10.3%
  • Graphite mineralization mined per year 155,000 tonnes
  • Average stripping ratio 5.3:1
  • Mine life 13 years

Golder Associates AB (Golder) completed the mining study for this PEA.  Pit optimisation, pit design and  mine  production  schedules  were  performed  using  industry  standard  Gemcom  Whittle™  4x optimisation software, Maptek Vulcan™ and Gemcom Surpac™ mine planning software using only graphite under Measured and Indicated mineral resources categories within the provided resource model. The model produced a quantity of mineralized material and waste tonnes, distributed over the life of the mine.  Inferred resources were not used in the mining or economic models produced in the PEA.

The model shell was then used to generate operational pit designs.  Two distinct open pits were designed around the Whittle shells.  The pits included haulage ramps located on the south wall of the pits.

SourceMineralisedGraphite GradeWaste (Mt)Total (Mt)Stripping Ratio
Material (Mt)%
East Pit8.910.53.84.84.4
West Pit9.311.45.76.66.1
Total1.811.09.611.45.3

Table 2: Materials contained in proposed pits 

The pits were then scheduled over the LOM by months for the first year, quarters for years 2 and 3 and then annually for the remainder of the life of the project. The Whittle production schedule was set at 100 000 t/a ROM however, for the purposes of economic modelling, the mine throughput was increased to 155,000 t/a ROM, and therefore the Whittle production schedule was accelerated on a pro rata basis accordingly. The waste to mineralised material ratio increases over time due to the depth of the pits and designed strip ratios until the final years when the benches are predominantly mineralised material.

The Company plans to use contract mining and the operating costs were derived from contractor quotes obtained by Golder.

PROCESSING & RECOVERY 

The PEA estimates:

  • Processing costs $662/tonne of graphite concentrate, $71/tonne of material processed
  • Annual average processing rate 155,000 tonnes
  • Annual average production 16,600 tonnes of graphite concentrate
  • Average graphite recovery 96%

The Woxna project has an existing graphite processing plant which was last fully operated in 2001. A comprehensive  metallurgical  test  work  programme  by  Aminpro  led  to  a  new  process  flow  sheet designed  by  Aminpro  and  GBM.    This  flow  sheet  predicts  a  significant  improvement  in  quantity, grade and graphite flake size distribution compared to historic production.  Engineering under the PEA proposes utilising as much of the existing facilities and infrastructure as possible in line with the new design, to minimise the initial capital cost and enable production to commence in the shortest possible time.

The  process  flow  sheet  incorporates  conventional  mineral  processing  technology  starting  with  2 stage crushing of the run‐of‐mine material followed by grinding in the existing rod mill. The ground product  is  treated  by  flash  and  rougher  flotation  to  maximise  the  recovery  of  large  flake.  The rougher  tailings  are  treated  in  a  scavenger  flotation  circuit  to  maximise  recovery.    The  flash  and rougher  concentrates  then  undergo  2  stages  of  regrinding  and  cleaner  flotation  while  scavenger concentrate has 3 stages of regrinding and cleaner flotation. Most of the flotation section uses new equipment.  Graphite concentrate is dewatered in a new filter press then dried in the existing drier. Screening and packing of graphite product largely utilises existing equipment. A new flake product exceeding  250  micron  and  94%  purity  is  produced  in  addition  to  the  graphite  grades  produced historically.

The nominal throughput of the plant is 155,000 tonne/year based on the maximum rate that can be milled  in the  existing  rod  mill.  There  is  potential  to  significantly  increase throughput  by  using  an existing  re‐grinding  mill  as  a  ball  mill  in  the  primary  milling  circuit  along  with  commensurate expansions of the flotation, drying, screening and packing sections. An expansion of capacity would be considered once markets permit.

GRAPHITE MARKETS, PRICES & SALES REVENUE 

The European graphite market is estimated to consume approximately 20% of the global demand for natural  flake  graphite  of  circa  500  000  tonnes/year.  Today  more  than  90%  of  Europe’s  graphite demand is imported, mainly from China.

The Woxna graphite project will primarily target the European graphite market due to its proximity to  Sweden,  short  transit  times  and  low  transport  costs.  At  16,600  tonnes/year,  the  design production  volume  in  the  Woxna  PEA  is  deliberately  sized  so  that  graphite  sales  may  be  readily absorbed into the European market without creating an oversupply situation. Further expansion of the  Woxna  graphite  project  is  possible  and  will  be  evaluated  when  European  market  conditions permit.

Graphite prices have risen considerably since the Woxna mine was last operated in 2001. In 2010, following a long period of flat prices, graphite prices, particularly for flake grades, rose rapidly as a result  of  a  surge  in  demand  due  to  restocking,  growth  from  China  and  lithium  batteries. Simultaneously, the imposition of taxes and permits on Chinese graphite exports restricted supply. Graphite prices peaked in 2012 and eased to today be approximately double the level seen in 2001. Graphite market commentators predict that prices may be approaching the bottom and with signs of economic recovery in the USA and the worst of the recession behind Europe, graphite prices may again strengthen.

Graphite is not an openly traded mineral with prices negotiated privately between customers and producers under spot or term contracts. The sale price used in the PEA was based on graphite prices published by Industrial Minerals magazine (‘’IM’’).

It has been common practice to use a 24 month trailing average graphite price in graphite PEAs. The Woxna PEA utilized a 12 month trailing average graphite price so as to exclude the peak price period occurring  in  2011/12.  Applying  Woxna’s  planned  product  distribution  to  IM’s  12  month  trailing average graphite prices produces an average selling price of $1,199/tonne for the Woxna PEA. This selling  price  is  considered  to  be  conservative  when  compared  to  the  24 month  trailing  average graphite price of $1,548/tonne or prices used in other graphite project PEAs.

Size (µm)PurityProportion of Production1 year trailing
averageAnnual QuantityRevenue
($/t)(t)($M/year)
+ 25095 %18 %1 8242 9905.5
+ 180, - 25094 %22 %1 5263 6505.6
+ 100, - 18092 %28 %1 0094 6504.7
- 10088 %32 %7875 3104.2
Average / Total1 19916 60020.0

Table 3: Woxna average sale price and revenue estimated in the PEA 

INFRASTRUCTURE AND PERMITS 

The  Woxna  mine  site  is  fully  permitted  and  has  a  partially  exploited  open  pit,  waste  rock  dump areas,  mine  site  roads,  processing  facility,  tailings  management  facility  and  clarification  ponds. Woxna is connected to public roads and has a sufficient water and electricity supply.

Modest upgrades are contemplated to the infrastructure with the most significant change being the upgrade  of  the  tailings  storage  facility  to  both  increase  its  capacity  and  improve  environmental performance to current best practice.  As this work has to be performed when the ground is not frozen, this task is the critical item in a re‐start schedule.

The  Woxna  project  is  fully  permitted  to  extract  100,000  tonnes  /  annum  of  mineralised  rock  for processing. The PEA proposes increasing production to 155,000 tonnes / annum of mineralised rock. The PEA assumes that production can commence under the existing permit (concession) while an increase in capacity is sought. Expanded capacity is assumed in the second year once the permit is obtained.

CAPITAL & OPERATING COSTS, FINANCIAL ASSUMPTIONS & SENSITIVITY 

ItemCost $M
Mining0.2
Processing6.4
Tailings and Water Management2.9
Infrastructure1.0
Direct Capital10.5
Indirect Capital including Contingency3.8
Working Capital2.4
Total16.7

Table 4: Initial Capital Breakdown 

ItemCost $/ tonne
Mining240
Reagent18
Labour217
Grinding Media17
Power37
G&A34
Fuel39
Maintenance49
Tailings Management10
Total662

Table 5: LOM Average operating cost breakdown per tonne graphite concentrate 

ItemValue
Plant availability85%
Swedish Kronor: US $ exchange rate6.54
Swedish corporation tax rate22%
End of mine life rehabilitation cost$6.0M
Discount rate8%
Historical loss and depreciation carry forward$8.7M

Table 6: Key financial model assumptions

ItemBase Case+ 10% Case-10% Case
ValueNPV ($M)ValueNPV ($M)ValueNPV ($M)
Graphite Price $/t1 19926.61 31937.31 07915.9
Exchange Rate6.5426.67.1932.05.8920.0
Capex $M16.726.618.424.815.028.5
Mining Costs $/t Cg24026.626424.521628.7
Labour Costs $/t Cg21726.623924.719628.6

Table 7: Woxna Project Financial Sensitivity (8% discount rate) 

WOXNA PROJECT LOCATION  

The Woxna project is located some 8 kilometres (“km”) WNW of the town of Edsbyn in the Kingdom of Sweden, approximately 3.5 hour drive north of Stockholm.  Access is via 10 km of all‐weather forest road from Highway 301.

A  National  Instruments  43‐101  Technical  Report  for  the  Woxna  PEA  will  be  posted  on  Flinders’ website  at  www.flindersresources.com  and  filed  on  SEDAR  at  www.sedar.com  within  45  days following this news release.

Quality Control and Assurance 

Chris Stinton, BSc (Hons) (Minerals Engineering), CEng MIMMM, Senior Process Engineer with GBM Minerals  Engineering  Consultants  of  the  United  Kingdom,  an  independent  consultant  to  the Company, is the qualified person as defined under National Instrument NI 43‐10 and has reviewed and approved the PEA disclosure within this release.

Geoffrey Reed of Reed Leyton Consulting completed the verification of data on which the Kringel Resource  Estimate  was  based.  This  verification  included  an  assessment  of  QA/QC  data,  sample preparation  and  assay  methodologies,  density  data,  data  inputs  and  survey  data  used  in  the estimate. Data was validated by using field checks, statistical methods and evaluating the Company’s protocols.

On behalf of the Board

“Martin McFarlane”

Martin McFarlane, President and CEO

For more information contact:

Jim Powell +1 647‐478‐5806 [email protected]

Certain  information  set  out  in  this  news  release  may  constitute  forward‐looking  statements  or forward‐looking information within the meaning of applicable securities laws (collectively, “Forward‐ Looking  Statements”).  All  statements,  other  than  statements  of  historical  fact,  that  address activities,  events  or  developments  that  the  Company  believes,  expects  or  anticipates  will  or  may occur in the future including the PEA are Forward‐Looking Statements. Forward‐Looking Statements are  often,  but  not  always,  identified  by  the  use  of  words  such  as  “seek,”  “anticipate,”  “believe,” “plan,”  “estimate,”  “expect,”  and  “intend”  and  statements  that  an  event  or  result  “may,”  “will,” “can,” “should,” “could,” or “might” occur or be achieved and other similar expressions. Forward‐ Looking  Statements  are  based  upon  the  opinions  and  expectations  of  the  Company  based  on information  currently  available  to  the  Company.  Forward‐Looking  Statements  are  subject  to  a number of factors, risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the Forward‐Looking Statements including, among other things, the Company has yet to generate a profit from its activities; there can be no guarantee that the estimates  of  quantities  or  qualities  of  minerals  disclosed  in  the  Company’s  public  record  will  be economically recoverable; uncertainties relating to the availability and costs of financing needed in the  future;  competition  with  other  companies  within  the  mining  industry;  the  success  of  the Company is largely dependent upon the performance of its directors and officers and the Company’s ability  to  attract  and  train  key  personnel;  changes  in  world  metal  markets  and  equity  markets beyond the Company’s control; the PEA mineral reseources are, in the large part, estimates and no assurance  can  be  given  that  the  anticipated  tonnages  and  grades  will  be  achieved  or  that  the indicated level of recovery will be realized; production rates and capital and other costs may vary significantly  from  estimates;  unexpected  geological  conditions;  delays  in  obtaining  or  failure  to obtain  necessary  permits  and  approvals  from  government  authorities;  all  phases  of  a  mining business present environmental and safety risks and hazards and are subject to environmental and safety regulation, and rehabilitation and restitution costs; the Company does not maintain insurance against  environmental  risks;  and  management  of  the  Company  have  experience  in  mineral exploration  but  may  lack  all  or  some  of  the  necessary  technical  training  and  experience  to successfully  develop  and  operate  a  mine.  Although  the  Company  believes  that  the  expectations reflected in the Forward‐Looking Statements, and the assumptions on which such Forward‐Looking Statements are made, are reasonable, there can be no assurance that such expectations will prove to be correct. Readers are cautioned not to place undue reliance on Forward‐Looking Statements, as there  can  be  no  assurance  that  the  plans,  intentions  or  expectations  upon  which  the  Forward‐ Looking Statements are based will occur. Forward‐Looking Statements herein are made as at the date hereof, and unless otherwise required by law, the Company does not intend, or assume any obligation, to update these Forward‐Looking Statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS SUCH TERM IS DEFINED  IN  THE  POLICIES  OF  THE  TSX  VENTURE  EXCHANGE)  ACCEPTS  RESPONSIBILITY  FOR  THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE