Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LEAP.V ·

Durango Completes Program at Dianna Lake Silver, SASK.

Corporate Updates

DURANGO RESOURCES INC.

Suite 248 – 515 W. Pender Street

Vancouver, BC V6B 6H5

TSX Venture Exchange Trading Symbol:

DGO Frankfurt: 86A1 / OTC Grey: ATOXF

DURANGO COMPLETES PROGRAM AT DIANNA LAKE SILVER, SASK.

Vancouver, BC / TheNewswire / August 31, 2017 – Durango Resources Inc. (TSX.V-DGO) (OTC-

ATOXF) (Frankfurt-86A1), (the “Company” or “ Durango”) announces that further to the news

releases dated August 8 and August 22, 2017, the dewatering and sampling of Pit#1 on its Dianna

Lake Silver Project in northern Saskatchewan is complete.

Durango’s exploration crew has finished the follow- up program for the wholly owned Dianna

Lake property which began A ugust 18th and consisted of further investigation of the anomalies

discovered in 2016. The work also included sampling historical Pit#1 which was flooded with

water in 2016 and systematic sampling of historic trenches.

Durango’s team was successful in dewatering historical Pit #1 which hosted high grade silver grab

samples of up to 2,458 oz/t ( 76,452.34 g/t) Ag in the past. The crew also completed systematic

sampling of historical trenches in the area which hosted copper with historical results of to 1.6%

Cu.

52 channel samples from the various zones of historic workings and 63 grab samples from the

surrounding areas were taken for assay. All 115 samples have been sent to Ac tivation

Laboratories for assay.

In addition to sampling , the crew completed approximately 7 km of mag/gradient and 1 km of

VLF in the immediate area of the historical workings to help compare with historical reports in

the area to produce an updated geological map.

Marcy Kiesman, CEO of Durango, comments, “ Based on the historic information, the highest-

grade silver samples were recovered from Pit #1 so we are excited that our crew was able to

successfully dewater and sample the area. We hope to be able to verify the historically

documented silver results of Dianna Lake property during the August 2017 program and further

details on the exploration program will be released as assay results become available and

interpreted.”

Before and after de-watering of Pit #1

Figure 1: Sampling Locations Within Historical Pit Area (Highlights) Full size image at:

http://www.durangoresourcesinc.com/dianna-lake-silver-saskatchewan/

The technical contents of this release were approved by George Yordanov, P.Geo., a qualified

person as defined by National Instrument 43 -101. The property has not yet been the subject of

a National Instrument 43-101 report.

About Dianna Lake Silver, Saskatchewan

Durango’s Dianna Lake silver prospect covers an historical area in which, from 1968 to 1969, two-

high grade, primarily native silver- bearing exploration targets of between 30,000 tonnes and

50,000 tonnes grading five to ten ounces (155 to 311 g/t) per ton silver, approximately 600

meters apart, were determined by trench grab sample assays, according to an historical

evaluation report composed for Comaplex Resources in 1980(1)*.

* Potential quantities and grades are conceptual in nature. There has been insufficient exploration

to define a mineral resource, and it is uncertain if further exploration will result in the target being

delineated as a mineral resource.

References

(1) "Evaluation report of the Dianna Lake silver -copper property, CBS 3141, S- 97735 and S-

97736, Uranium City area, Saskatchewan, Canada, for Comaplex Resources International

Ltd.," E.G. Kennedy, P.Eng., 1980.

About Durango

Durango is a natural resources company engaged in the acquisition and exploration of mineral

properties. The Company has a 100% interest in the Mayner’s Fortune and Smith Island limestone

properties in northwest British Columbia, the Golden Triangle Properties in northern British

Columbia, the Decouverté and Trove gold properties in the Abitibi Region of Quebec, and certain

lithium properties near the Whabouchi mine, the Buckshot graphite property near the Miller

Mine in Québec, the Dianna Lake silver project in northern Saskatchewan, and the Whitney

Northwest property near the Lake Shore Gold and Goldcorp joint venture in Ontario.

For further information on Durango, please refer to its SEDAR profile at www.sedar.com.

Marcy Kiesman, Chief Executive Officer

Telephone: 604.428.2900 or 604.339.2243

Facsimile: 888.266.3983

Email: [email protected]

Website: www.durangoresourcesinc.com

Forward-Looking Statements

This document may contain or refer to forward- looking information based on current

expectations, including, but not limited to Durango achieving permits, engaging in future drilling

or work programs, raising additional funds, exploration results on any of its properties or the and

the impact on the Company of these events. Forward-looking information is subject to significant

risks and uncertainties, as actual results may differ materially from forecasted results. Forward -

looking information is provided as of the date hereof and we assume no responsibility to update

or revise them to reflect new events or circumstances. For a detailed list of risks and uncertainties

relating to Durango, please refer to the Company's prospectus filed on its SEDAR profile at

www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.