LithiumBank Files NI 43-101 Resource Estimate Technical Report for the Boardwalk Lithium Brine Project, West-Central Alberta

Resource Estimates Technical Reports (NI 43-101)

LithiumBank Files NI 43-101 Resource

Estimate Technical Report for the Boardwalk

Lithium Brine Project, West-Central Alberta

Calgary, Alberta--(Newsfile Corp. - April 7, 2025) -

LithiumBank Resources Corp. (TSXV: LBNK)

(OTCQX: LBNKF)

("

LithiumBank

" or the "

Company

") is pleased to announce the filing of a technical

report (the "

Report

") for an updated mineral resource estimate at its 100% owned Boardwalk lithium

brine project ("

Boardwalk

") located in west-central Alberta. The Report is entitled "LithiumBank

Resources Corp. Boardwalk NI 43-101 Technical Report" with an effective date of February 20, 2025.

The Boardwalk resource estimate highlights were originally announced by the Company on

February 20,

2025

. The Report can be found on the Company's website and on

SEDAR+

.

Boardwalk Resource Estimate Highlights:

Boardwalk hosts the highest-grade lithium brine measured or indicated current resource estimate

in Alberta at 81.6 mg/L lithium.

5,195,000 tonnes of measured or indicated of lithium carbonate equivalent ("

LCE

") within the

Leduc Formation ("

Fm

") aquifer at an average of 81.6 mg/L lithium (Table 2).

2,777,000 tonnes of inferred LCE within the Leduc Fm and Beaverhill Lake Group ("

Gp

")/Swan

Hills Fm aquifers, which directly underlies the Leduc Fm, at a weighted average of 79.0 mg/L

lithium (Table 1).

The resource estimate at Boardwalk increased by over 30% due to an increase in the lithium

grade via recent "10-06" drilling/testing program (Figure 1), additional measurements, refined

parameterization of Leduc Fm aquifer geometry and effective porosity, as well as confirming the

presence of lithium in the Beaverhill Lake Gp/Swan Hills Fm aquifer (Figure 3).

The subsurface reservoir model will assist in planning well networks and locations in future

economic and engineering studies.

The Report estimates the LCE measured resource at 1,671,000 tonnes at a grade of 81.2 mg/L lithium

and 3,524,000 tonnes of indicated LCE at a grade of 81.8 mg/L lithium within the Leduc Fm. This leads

to a combined total of measured and indicated resources of 5,195,000 tonnes LCE with an average

grade of 81.6 mg/L lithium (Table 2). Additionally, recent work estimates the inferred LCE resources of

1,128,000 tonnes at 81.8 mg/L lithium and 1,649,000 tonnes inferred LCE at 78.1 mg/L lithium within the

Leduc and Beaverhill Lake Gp/Swan Hills Fm (Table 1), respectively. The data and workflow process

were reviewed and validated by Alex Haluszka of Montrose Environmental Solutions Canada Inc.; a

Qualified Person as defined by National Instrument 43-101 -

Standards of Disclosure for Mineral

Projects

("

NI 43-101

").

The Boardwalk resource estimate is an increase in lithium grade of approximately 18% from the

previous resource estimate and an increase in overall lithium resources by approximately 30% (previous

Boardwalk resource estimate with effective date Feb. 22, 2024) and increasing the Company's overall

lithium resources as shown in Table 2 and Figure 3.

Table 1

: Boardwalk Lithium Measured, Indicated, and Inferred Mineral Resource Estimations

Resource Category

Reservoir

brine Volume

(km3)

Grade

(mg/L

lithium)

Sub total - tonnes

LCE

Category total

tonnes LCE

Category Grade

(mg/L lithium)

Measured

Leduc (oil saturated

zone)

0.25

71.8

91,000

1,671,000

81.2

Measured

Leduc (water

saturated zone)

3.82

81.8

1,580,000

Indicated

Leduc (water

saturated zone)

8.52

81.8

3,524,000

3,524,000

81.8

Inferred

Leduc (water

saturated zone)

2.73

81.8

1,128,000

2,777,000

79.0

Inferred

Beaverhill

Lake/Swan Hills

4.18

78.1

1,649,000

Note 1: Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no guarantee that all or any part of the

mineral resource will ever be upgraded to a higher category. The estimate of mineral resources may be materially affected by geology, environment,

permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

Note 2: The weights are reported in metric tonnes (1,000 kg or 2,204.6 lbs).

Note 3: Tonnage numbers are rounded to the nearest 1,000 unit.

Note 4: In a 'confined' aquifer (as reported herein), effective porosity is an appropriate parameter to use for the resource estimate.

Note 5: The resource estimation was completed and reported using a cut-off of 50 mg/L Li.

Note 6: To describe the resource in terms of industry standard, a conversion factor of 5.323 is used to convert elemental Li to Li2CO3, or Lithium

Carbonate Equivalent (LCE).

Table 2

: LithiumBank lithium resource holdings from Boardwalk and Park Place

Project

Resource Category

Lithium Grade

(mg/L)

Tonnes LCE

LithiumBank

Combined

Resources

(tonnes LCE)

Lithium Grade

(mg/L)

Combined Category

Boardwalk

Measured

81.2

1,671,000

5,195,000

81.6

Measured &

Indicated

Indicated

81.8

3,524,000

Inferred

79.0

2,777,000

24,474,000

80.1

Inferred

Park Place

Inferred

80.2

21,697,000

*The NI 43-101 compliant Park Place resource estimate entitled "LithiumBank Resources Corp. Park Place NI 43-101 Technical Report" effectively dated

June 24, 2024, is available on SEDAR+

**LithiumBank is following the same systematic development strategy at Park Place as it has with Boardwalk.

Boardwalk consists of 395,369 acres of contiguous Brine Hosted Mineral Licenses ("

BHML

") owned

100% by LithiumBank. The Company has consolidated 100% of BHML's overlying the Leduc Fm and

Beaverhill Lake Gp/Swan Hills Fm at Boardwalk with no freehold mineral rights or any carbon

sequestration/pore space permits or applications existing over Boardwalk. Boardwalk is situated

approximately 85 km east of Grande Prairie and approximately 270 km northwest of Edmonton.

Boardwalk is also approximately 50 km to the north of the Company's Park Place lithium brine project

("

Park Place

"). Boardwalk and the surrounding area have seen over 70 years of hydrocarbon extraction

resulting in a well-established and well-trained labour force, networks of all-weather gravel roads, drill

sites that can be easily accessed from Provincial highways, and electrical transmission lines that run

through the project (see Figure 1).

Figure 1

: Map of the Boardwalk showing NI 43-101 measured, indicated, and inferred lithium resources

with surface infrastructure and A-A' cross-section line from Figure 2.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10140/247741_9834a015e4e7982e_001full.jpg

Figure 2

: Cross-section through Boardwalk showing effective porosity. Cross-section line shown on

Figure 1.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10140/247741_9834a015e4e7982e_002full.jpg

Figure 3

: Comparable lithium brine and lithium clay projects in North America (as of Feb. 20, 2025).

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10140/247741_9834a015e4e7982e_003full.jpg

Mineral Resource Quality Assurance and Quality Control

Samples collected in 2021 and used in the resource estimate were analysed at AGAT Laboratories, an

ISO 17025:2017 certified lab, in Calgary Alberta ("

AGAT

"). LithiumBank implemented strict Quality

Control and Quality Assurance ("

QA/QC

") protocols for the analysis (as per the news release

June 28,

2022

) . Initial testing of the four wells included six brine samples from each well. Well number 100/09-26-

068-22W5/00 was sampled first and included six lab duplicates, blanks, standard reference material,

and check lab analysis.

LithiumBank conducted a second round of QA/QC with a new standard reference material sample made

to mimic the Sturgeon Lake brine grades. The second round also included blanks and duplicates and

consisted of an additional 13 samples from well 100/09-26-068-22W5/00 and one additional sample

from the other three wells. All samples were analysed at AGAT Labs in Calgary, AB.

LithiumBank later acquired well 100/10-06-069-21W5/00 ("

10-6

") which was extended, via a sidetrack,

from the top of the Leduc Fm to the bottom of the Beaverhill Lake Gp/Swan Hills Fm (as per the news

release

September 23, 2024

). The sampling at the 10-6 was done under the supervision and guidance

of Gord McMillan, P. Geo., who was on site at the 10-6 during the sampling campaign to ensure QA/QC.

Brine samples were sent to AGAT. Duplicate samples were sent to Isobrine Laboratory and Bureau

Veritas Laboratory in Edmonton Alberta as duplicate check lab samples. Each batch of samples

included duplicate samples and standard reference material to ensure QA/QC.

The scientific and technical information relating to the mineral resource estimate presented in this news

release has been reviewed and approved by Alex Haluszka P. Geo. of Montrose Environmental

Solutions Canada Inc., Alex Haluszka is independent of LithiumBank and a Qualified Person as defined

by NI 43-101.

The Report was prepared by the following Qualified Persons; Alex Haluszka P. Geo. of Montrose

Environmental Solutions Canada Inc., George C Brindle, P.Eng., of Skoki Energy Advisors Inc., Kevin

Piepgrass, P.Geo. The updated resource estimate was prepared in collaboration with global technology

and services company SLB.

Risks and Uncertainties

There is no guarantee that a company can successfully extract lithium in a commercial capacity. Initial

mineral processing bench-scale and/or demonstration pilot test work may not translate to a full-scale

commercial operation.

About LithiumBank Resources Corp.

LithiumBank Resources Corp. (TSXV: LBNK) (OTCQX: LBNKF), is a publicly traded lithium company

that is focused on developing its two flagship projects, Boardwalk and Park Place, in Western Canada,

which host some of the largest lithium brine resources in North America (Figure 3). The Company holds

1,855,915 acres of brown-field brine hosted mineral licenses, across three (3) districts in Alberta and

Saskatchewan. The Company has pilot tested multiple mature Direct Lithium Extraction ("DLE")

technologies and is working toward establishing commercial lithium production by a modular approach.

Contact:

Rob Shewchuk

CEO & Director

[email protected]

(778) 987-9767

Neither the TSX Venture Exchange nor its Regulation Services Provider (as defined in the

policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of

this release.

Cautionary Statement Regarding Forward Looking Statements

This release includes certain statements and information that may constitute forward-looking

information within the meaning of applicable Canadian securities laws. All statements in this news

release, other than statements of historical facts, including statements regarding future estimates,

plans, objectives, timing, assumptions or expectations of future performance, including without

limitation, the Company's expectations regarding that the subsurface reservoir model will assist in

planning well networks and locations in future economic and engineering studies, and that the

Company will continue working towards commercial lithium production by a modular approach are

forward-looking statements and contain forward-looking information. Generally, forward-looking

statements and information can be identified by the use of forward-looking terminology such as

"intends" or "anticipates", or variations of such words and phrases or statements that certain actions,

events or results "may", "could", "should" or "would" or occur.

Forward-looking statements are based on certain material assumptions and analysis made by the

Company and the opinions and estimates of management as of the date of this press release,

including that the subsurface reservoir model will assist in planning well networks and locations in

future economic and engineering studies, that the Company will continue to work towards establishing

commercial lithium production, and the commercial lithium production will be achieved by a modular

approach.

These forward-looking statements are subject to known and unknown risks, uncertainties and other

factors that may cause the actual results, level of activity, performance or achievements of the

Company to be materially different from those expressed or implied by such forward-looking

statements or forward-looking information. Important risks that may cause actual results to vary,

include, without limitation, the risk that the subsurface reservoir model will not be used in planning well

networks and locations in future economic and engineering studies, that the Company will not

continue working towards establishing commercial lithium production, or that commercial lithium

production will not be achieved by a modular approach.

Although management of the Company has attempted to identify important factors that could cause

actual results to differ materially from those contained in forward-looking statements or forward-looking

information, there may be other factors that cause results not to be as anticipated, estimated or

intended. There can be no assurance that such statements will prove to be accurate, as actual results

and future events could differ materially from those anticipated in such statements. Accordingly,

readers should not place undue reliance on forward-looking statements and forward-looking

information. Readers are cautioned that reliance on such information may not be appropriate for other

purposes. The Company does not undertake to update any forward-looking statement, forward-looking

information or financial outlook that are incorporated by reference herein, except in accordance with

applicable securities laws.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/247741