Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LAM.TO ·

Laramide Outlines 2024 Australian Exploration Plans

Exploration Programs

Laramide Outlines 2024 Australian Exploration Plans

TORONTO

,

March 20, 2024

/CNW/ -

Laramide Resources Ltd.

("Laramide" or the "Company") (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF) is pleased to

announce 2024 work plans for

Australia

which include a large drill campaign of up to 12,000m across multiple targets at the Westmoreland Uranium Project in

NW

Queensland

and into the Murphy Uranium Project in the Northern Territory. Two drill rigs have been secured and logistical plans are well advanced for a campaign

that will build on last year's successful exploration effort which saw 40 holes completed across 4,000 cumulative meters. Drilling is expected to commence in

approximately 6-8 weeks' time at the conclusion of the current wet season.

The Westmoreland Uranium Project in

Australia

is considered one the world's best development stage uranium deposits not under control of a major mining

company. The current JORC and NI 43-101 resource model defines 51.9Mlb U

3

O

8

1

across three deposits: Redtree, Huarabagoo and Junnagunna. Internal review

of the historical data, which was further encouraged by 2023 drilling, has determined that there is potential to significantly increase the size of the deposit at

minimal expense due to the shallow nature of the mineralization.

Plans for 2024 include returning to the Murphy Project in the Northern Territory to investigate drilling completed in 2007

2.

A

1,500m

drill program will revisit the

areas of interest identified in Laramide's 2006-2007 exploration program and includes Mageera (formerly called

NE Westmoreland

, see Figure 1,) which appears

to be a geological analogue of

Westmoreland

.

Commenting on the 2024 work plans, Laramide's President and CEO,

Marc Henderson

said:

"The Westmoreland Uranium Project is a Tier 1 asset that is likely to become increasingly more important as the world looks for new sources of uranium

supply. While the current resource is substantial, we see the potential for significant growth that could serve to increase the attractiveness of the deposit, both

economically and for the potential future benefit of western nuclear utilities and

Queensland

stakeholders. 2024 is an election year for

Queensland

and we are

encouraged by recent political developments that suggest a change in government – or government policy – is a distinct possibility."

Resource Extension Drilling

Currently mineral resources are defined across three deposits: Redtree, Huarabagoo and Junnagunna. These zones follow the Redtree dyke zone (approximately

10 km) on a NW trend as discrete ore bodies. The 2016 PEA

3

optimized pit designs and labelled them as South, Central and North Pits respectively. However,

the mineralisation in the 2.5km corridor between the deposits, which is hosted in the coarse-grained to granular

Westmoreland

conglomerate and includes higher

grades (>0.1%) associated with the fractured footwall contact of intrusive dolerite dykes, remains sparsely drill tested. The goal is to investigate whether the

three known deposits can be linked and if so, whether this could substantially increase the deposit size.

Accordingly, the Company plans to test the linking zone (JG-HB, Link see Figure 1) by drilling northern extensions to the high-grade Huarabagoo

4

northeast

toward Junnagunna. The Company is encouraged by a zone of mineralisation existing halfway between the deposits as reported in 2013 drill program (WDD12-

152 –

11m

@0.13% U

3

O

8

)

5

that remains open to the NE and SW.

Further resource growth is targeted through northern extensions to the 11Mlb U

3

O

8

Junnagunna deposit. The northern extensions of the dyke are sparsely drill

tested between Junnagunna and the Wanigarango uranium prospect 1.5km to the northeast (Figure 1).

Figure 1: Westmoreland and Murphy Projects (CNW Group/Laramide Resources Ltd.)

Long Pocket

Long Pocket is located 7km to the east of Junnagunna (Figure 1). In-house modelling of the Long Pocket deposit has highlighted zones where infill drilling will

support a maiden mineral resource estimation. Accordingly, the Company has planned up to

1,000m

drilling to ensure drill spacing is appropriate to show

continuity of mineralisation. It is anticipated that the addition of Long Pocket, which is shallow and easily accessed, to the Westmoreland Resource base would

enhance the economics of the project or contribute to an extended mine life profile.

Exploration Drilling

Black Hills

The Black Hills prospect is located 1.5km northeast of the Long Pocket prospect and presents as a broad 1.5 x 1km east-west airborne radiometric anomaly (see

Figure 1). Recent exploration drilling at the Black Hills target has discovered multiple zones of mineralisation in previously undrilled zones at the project's southern

end with results including BH23DD003 -

3.0m

@ 1844ppm (0.18%) U

3

O

8

from

88m

6

.

Those results, combined with a review of historical data from the 1970s, promote Black Hills to one of Laramide's priority exploration targets for the 2024 field

season and will include validation and qualification of historical work.

U-Valley

U-Valley presents an interesting greenfield target about 1.5km south of Long Pocket with previously reported "off-scale" radiometric anomalism. Four in-situ, rock

chips samples taken during reconnaissance work in 2023 returned significant uranium mineralisation grading up to 1.49% U

3

O

8

over a broad area

7

.

Amphitheatre

Located 16km NE of the Junnagunna deposit, exploration drilling at Amphitheatre will focus on building upon the 2022 and 2023 exploration results by testing

interpreted northern extensions to mineralisation under cover. Potential for discovery where alluvial cover obscures the radiometric response is supported by

historical drilling results approximately

300m

north of the Amphitheatre prospect however validation drilling is required.

Murphy Uranium Project, Northern Territory

Mageera

The Mageera Prospect (formerly

NE Westmoreland

"NEWM", see Figure 1) represents a geological analogue to the

Westmoreland

system. Mineralization is

associated with a 10km NE trending mafic dyke which truncates the

Westmoreland

conglomerate and Siegal volcanic package under variable depths of alluvial

cover. Historical reports suggest uranium is hosted at dyke margins and the adjacent sandstones, but also at the unconformable contact between the

Westmoreland Conglomerate and Seigal Volcanics.

In 2006-2007, reconnaissance drilling at Mageera returned encouraging results including, drillhole NEWM204 intercepting

4m

@ 0.42% U

3

O

8

8

. This year, plans

include up to

1,000m

follow-up drilling.

Qualified/Competent Person

The information in this announcement relating to Exploration Results is based on information compiled or reviewed by Mr.

Rhys Davies

, a contractor to the

Company. Mr. Davies is a Member of The Australasian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation and

type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC 2012 Edition of the

'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves', and is a Qualified Person under the guidelines of the National

Instrument 43-101. Mr. Davies consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

To learn more about Laramide, please visit the Company's website at

www.laramide.com

Follow us on Twitter @LaramideRes

About Laramide Resources Ltd.:

Laramide is focused on exploring and developing high-quality uranium assets in

Australia

and the western

United States

. The Company's portfolio comprises

predominantly advanced uranium projects in districts with historical production or superior geological prospectivity. The assets have been carefully chosen for their

size, production potential, and the two large projects are considered to be late-stage, low-technical risk projects.

The

Westmoreland

project in

Queensland, Australia

, is one of the largest uranium development assets held by a junior mining company. This project has a PEA

that describes an economically robust, open-pit mining project with a mine-life of 13 years. Additionally, the adjacent Murphy Project in the Northern Territory of

Australia

is a greenfield asset that Laramide strategically acquired to control the majority of the mineralized system along the

Westmoreland

trend.

In

the United States

, Laramide's assets include the NRC licensed Crownpoint-Churchrock Uranium Project. An NI 43-101 PEA study completed in 2023 has

described an in-situ recovery ("ISR") production methodology. The Company also owns the La Jara Mesa project in the historic Grants mining district of

New

Mexico

and an underground project, called

La Sal

, in Lisbon Valley,

Utah

.

Forward Looking Statement

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of

historical facts, that address events or developments that management of the Company expect, are forward-looking statements. Forward-looking statements are

frequently, but not always, identified by words such as "expects", "anticipates", "believes", "plans", "projects", "intends", "estimates", "envisages", "potential",

"possible", "strategy", "goals", "objectives", or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be

taken, occur or be achieved, or the negative of any of these terms and similar expressions. Actual results or developments may differ materially from those in

forward-looking statements. Laramide disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new

information, future events or otherwise, save and except as may be required by applicable securities laws.

Since forward-looking information address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results could

differ materially from those currently anticipated due to a number of factors and risks. These include, but are not limited to, exploration and production for

uranium; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of resource estimates; health,

safety and environmental risks; worldwide demand for uranium; uranium price and other commodity price and exchange rate fluctuations; environmental risks;

competition; incorrect assessment of the value of acquisitions; ability to access sufficient capital from internal and external sources; and changes in legislation,

including but not limited to tax laws, royalties and environmental regulations.

________________________________________

1

https://laramide.com/projects/westmoreland-uranium-project/

2

20

th

May 2020 -

Independent Technical Report on the Murphy Project, Northern Territory, Australia (wp-laramide-2023.s3.ca-central-1.amazonaws.com)

3

ASX: Laramide Announces positive results from the updated PEA on the Westmoreland Uranium Project, Australia (22 April 2016)

4

ASX: Laramide Confirms Uranium Expansion Potential, Westmoreland (21 February 2024)

5

TSX: Laramide Continues to Expand New Zone of Mineralization at Westmoreland High grade gold also drilled at Huarabagoo (January 9

th

, 2013)

6

ASX: Laramide assays results from Long Pocket and Black Hills prospects support expansion potential at Westmoreland (09 February 2024)

7

Press release, October 31, 2023

https://laramide.com/laramide-updates-progress-on-2023-drilling-program-and-makes-new-discovery-with-off-scale-radioactivity-reading-from-surface-reconnaissance/

8

20th May 2020

INDEPENDENT TECHNICAL REPORT ON THE MURPHY PROJECT, NORTHERN TERRITORY, AUSTRALIA (wp-laramide-2023.s3.ca-central-1.amazonaws.com)

SOURCE

Laramide Resources Ltd.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/March2024/20/c3772.html

%SEDAR: 00003540E

For further information:

Marc Henderson, President and CEO, Toronto, Canada, +1 (416) 599 7363; Ann Baines, Director, Investor Relations, Toronto,

Canada, +1 (647) 832-9904

CO: Laramide Resources Ltd.

CNW 12:24e 20-MAR-24