Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

LAM.TO ·

Laramide Initiates Exploration Program at Murphy Uranium Project, Northern Territory, Australia

Mergers & Acquisitions Exploration Programs

Laramide Initiates Exploration Program at

Murphy Uranium Project, Northern Territory,

Australia

TICKER SYMBOLS: TSX:LAM; ASX:LAM; OTCQX:LMRXF

TORONTO

,

Nov. 15, 2021

/CNW/ - Laramide Resources Ltd. ("

Laramide

" or the "

Company

")

(TSX: LAM) (ASX: LAM) (OTCQX: LMRXF) is pleased to announce it has commenced a helicopter

supported reconnaissance stream and soil sampling program designed to test for uranium, gold and

a suite of other precious and base metals, hosted within favourable geological units on ELs 9319

and 9414 in the Northern Territory. These tenements comprise the Murphy Project ("Murphy" or "the

Project") and the current program is the first one undertaken by Laramide since completing the

acquisition of Murphy from Rio Tinto Exploration ("RTX") on

October 22

, 2020. Laramide had

previously been in a joint venture earn-in agreement with RTX and, since its involvement with the

Project, has commissioned several different types of airborne geophysical surveys including

combined magnetics-radiometrics, time-domain electromagnetics, and gravity gradiometry surveys.

A 43-101 technical report incorporating all of these results was filed on

May 22, 2020

.

The strategically located Project consists of 683.5 km

2

of granted exploration tenure, which lies

contiguous to and along strike from Laramide's Westmoreland Project in northwest

Queensland

.

The Northern Territory of

Australia

is a jurisdiction that is supportive of both uranium development

and mining and hosts several well-known deposits including the Ranger Mine which produced in

excess of 120,000 tonnes of U

3

O

8

over a 35-year period. The Murphy Uranium Province itself

produced high-grade uranium during the 1950s and stands out amongst the world's attractive

underexplored uranium provinces, having not seen any meaningful exploration since the 1970s.

Figure 1 – Murphy Project (CNW Group/Laramide Resources Ltd.)

The current program will be comprised of approximately 80 stream samples over EL9414 (only) and

15 to 20 soil traverses (approximately 300 soil samples), covering radiometric anomalies on both

leases. The stream sediment samples comprise a 50 – 100g sample of -80# material sieved down

from a 1 – 2kg / -10# bulk. The soil samples will be collected at

200 m

along 1 to 2 km long

traverses. The program is expected to be completed in 3-4 weeks' time and results of the

geochemistry and general reconnaissance undertaken are intended to inform an initial drilling

program on Murphy which is planned for the next field season in 2022.

The Murphy leases are located on Aboriginal Land Trust land owned by the Waayni and Garawa

people and, prior to commencement of the current program, Laramide sought and received the

approval of the traditional owners through the Northern Land Council. The traditional owners are

also represented on the field team currently carrying out the sampling program.

Qualified Person

The technical information in this news release has been prepared in accordance with the Canadian

regulatory requirements set out in NI 43-101. The information has been reviewed and approved by

Rob Sowerby

, a Qualified Person under the definition established by National Instrument 43-101 and

JORC. Mr. Sowerby is an independent consultant and has sufficient experience which is relevant to

the style of mineralization and type of deposit under consideration and to the activity he is

undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian

Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.

To learn more about Laramide, please visit the Company's website at

www.laramide.com

.

About Laramide Resources:

Laramide is a Canadian-based company with diversified uranium assets strategically positioned in

the United States

and

Australia

that have been chosen for their low-cost production potential.

Laramide's Churchrock and

Crownpoint

properties form a leading In-Situ Recovery (ISR) division

that benefits from significant mineral resources and near-term development potential. Additional U.S.

assets include La Jara Mesa in

Grants, New Mexico

, and

La Sal

in the Lisbon Valley district of

Utah

.

The Company's Australian advanced stage

Westmoreland

is one of the largest uranium projects

currently held by a junior mining company. Laramide is listed on the TSX: LAM and ASX: LAM and in

the United States

on the OTCQX: LMRXF.

Forward-looking Statements and Cautionary Language

This release includes certain statements that may be deemed to be "forward-looking statements".

All statements in this release, other than statements of historical facts, that address events or

developments that management of the Company expect, are forward-looking statements. Forward-

looking statements are frequently, but not always, identified by words such as "expects",

"anticipates", "believes", "plans", "projects", "intends", "estimates", "envisages", "potential",

"possible", "strategy", "goals", "objectives", or variations thereof or stating that certain actions,

events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the

negative of any of these terms and similar expressions. Actual results or developments may differ

materially from those in forward-looking statements. Laramide disclaims any intention or obligation

to update or revise any forward-looking statements, whether as a result of new information, future

events or otherwise, save and except as may be required by applicable securities laws.

Since forward-looking information address future events and conditions, by their very nature they

involve inherent risks and uncertainties. Actual results could differ materially from those currently

anticipated due to a number of factors and risks. These include, but are not limited to, exploration

and production for uranium; delays or changes in plans with respect to exploration or development

projects or capital expenditures; the uncertainty of resource estimates; health, safety and

environmental risks; worldwide demand for uranium; uranium price and other commodity price and

exchange rate fluctuations; environmental risks; competition; incorrect assessment of the value of

acquisitions; ability to access sufficient capital from internal and external sources; and changes in

legislation, including but not limited to tax laws, royalties and environmental regulations.

Actual results, performance or achievement could differ materially from those expressed in, or

implied by, the forward-looking information and, accordingly, no assurance can be given that any

of the events anticipated by the forward-looking information will transpire or occur, or if any of

them do so, what benefits may be derived therefrom and accordingly, readers are cautioned not to

place undue reliance on the forward-looking information.

SOURCE

Laramide Resources Ltd.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/November2021/15/c3011.html

%SEDAR: 00003540E

For further information:

Marc Henderson, President and Chief Executive Officer, Toronto, Canada,

+1 (416) 599 7363, [email protected], Twitter: @LaramideRes

CO: Laramide Resources Ltd.

CNW 07:49e 15-NOV-21